With the spread of COVID-19, along with the central government, the state governments have also announced several policy decisions to contain and prevent the spread of the virus.   In this blog post, we summarise some of the key measures taken by the Uttarakhand Government in this regard as of April 16, 2020.

As of April 15, 2020, 2,413 samples have been sent for testing in Uttarakhand.  Of these, 37 have been found COVID-19 positive and the results of 354 samples are awaited.  Of the 37 confirmed cases, 9 patients have been cured/discharged.[1]

Movement Restrictions

To contain the spread of COVID-19 in the state, the Government of Uttarakhand took the following measures for restricting the movement of people in the state.
 

  • On March 20, the Department of Health restricted the entry of all tourists (domestic and foreign) into the state.[2]  The Department further issued orders for the closure of all educational institutions, gyms, swimming pools, museums, cultural and social centres, and theatres until March 31.[3]
     

  • On March 22, the state announced a complete lockdown till March 31.[4]  Restrictions during the lockdown included: (i) prohibiting the gathering of more than five people at any public place, (ii) suspending all public transport including taxis and auto-rickshaws, and (iii) closure of all shops, commercial establishments, offices and factories.  Establishments providing essential goods and services were excluded from the lockdown restrictions.  These include: police, medical and health, print and electronic media, food, groceries, and their transportation, among others.4 
     

  • On March 25, the central government announced on a 21-day country-wide lockdown till April 14.[5]  On April 14, the lockdown was further extended till May 3, 2020.[6]  
     

  • On April 15, the Ministry of Home Affairs issued guidelines on the measures to be taken by state governments until May 3.[7]  As per these guidelines, select activities will be permitted from April 20 onwards, to mitigate hardship to the public due.  These activities include health services, agriculture and related activities, certain financial sector activities, operation of Anganwadis, MNREGA works, and cargo movement, among others.  Further, subject to certain conditions, commercial and private establishments, industrial establishments, government offices, and construction activities will also be permitted.7 

Health Measures

Uttarakhand Epidemic Disease COVID-19 Regulations 2020

On March 15, 2020, the government notified the Uttarakhand Epidemic Disease COVID-19 Regulations, 2020 for the containment of COVID-19 in the state.[8]  Key features of the regulations include the following: 

  • All hospitals (government and private) must have dedicated flu corners for the screening of suspected COVID-19 cases.  
     

  • The spread of any misinformation must be avoided.  No person or organisation can use any print or electronic media for information regarding COVID-19 without prior permission of the state health department.

Guidelines for citizens, healthcare facilities and government departments

The state issued several guidelines and advisories on various subjects related to the containment of the virus.[9] These guidelines have been targeted towards citizens, healthcare facilities, as well as government departments. Some of these guidelines are given below: 

  • For citizens: These include guidelines on the use of masks by the public, guidelines for home quarantine, and advisory to not consume tobacco to prevent the virus.8   
     

  • For healthcare facilities: Guidelines for health care facilities include: sample collection, packaging and transport guidelines, infection prevention control for suspected cases, clinical management of COVID – 19, and discharge policy for COVID-19 patients, among others.8
     

  • For government: Guidelines for government departments include: guidelines for cluster containment, strategy, advisory on the use of hydroxychloroquine for high-risk population, and guidelines for quarantine facilities for COVID-19.8

Administrative Measures

On March 21, the state government cancelled all leaves for employees from the Department of Medical, Health and Family Welfare and ordered all the employees on leave to report back.[10]  Further, on March 19, the state government announced that the administrative control of all properties and accommodations under the tourism department and other government enterprises will be given to the respective District Magistrates, temporarily.[11]  

Education

On March 21, the state government postponed the correction of all state board examination booklets, which were to be corrected from April 1 to April 15, 2020.[12]  The government also postponed exams for the Forest Research Institute, which were supposed to be conducted in March.[13]  

For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.

 

[1] Dehradun Health Bulletin on Corona Virus Disease (COVID-19), Status as on April 15, 2020 Time: 05:30 PM, Uttarakhand State Control Room COVID -19, Health and Family Welfare, Uttarakhand, http://health.uk.gov.in/files/Corrected-15-04-2020-Health-Bulletin.pdf.

[2] Order No. 48/PS-Secy(H)/2020, Department of Medical, Health and Family Welfare, March 20, 2020, https://prsindia.org/files/covid19/notifications/427.UK_Advisory_for_Tourists_20_Mar.pdf.

[3] Advisory on social distancing measure in view of spread of COVID-19 disease, Government of Uttarakhand, https://prsindia.org/files/covid19/notifications/1835.UK_Social_Distancing_Advisory_Uttarakhand.pdf.

[4] Order No. UKHFWS/PS-MDNHM/2019-20/217, Department of Medical, Health and Family Welfare and Medical Education, March 22, 2020, https://prsindia.org/files/covid19/notifications/432.UK_Order_Lockdown_Mar_22.pdf.

[5] Order No. 1-29/2020-PP, National Disaster Management Authority, March 24, 2020, https://mha.gov.in/sites/default/files/ndma%20order%20copy.pdf.

[6] “PM addresses the nation for 4th time in 4 Weeks in India’s fight against COVID-19” Press Release, Prime Minister’s office, April 14, 2020, https://pib.gov.in/PressReleseDetail.aspx?PRID=1614255.

[7] Order No.40-3/2020-DM-I(A), Ministry of Home Affairs, April 15, 2020, https://www.mha.gov.in/sites/default/files/MHA%20order%20dt%2015.04.2020%2C%20with%20Revised%20Consolidated%20Guidelines_compressed%20%283%29.pdf.

[8] Notification No. 370/XXVIII(1)/2020-01(06)/2020, Department of Medical Health and Medical Education, March 15, 2020, http://health.uk.gov.in/files/The_Uttarakhand__Epidemic__Disease__COVID-19_Regulation_2020.pdf.

[9] Website of Department of Medical, Health and Family Welfare, Corona (COVID19) updates, Government of Uttarakhand, last visited on March 16, http://health.uk.gov.in/pages/display/140-novel-corona-virus-guidelines-and-advisory-.

[10] Order No. 1P/Ra0pu0/miscellaneous/1/2018, Department of Medical, Health and Family Welfare, March 19, 2020, https://prsindia.org/files/covid19/notifications/430.UK_DG-Order-Cancellalation_of_Leave_Health_Workers_21_Mar.pdf.

[11] Order No. 42/Secy Health/2020, Department of Medical, Health and Family Welfare, March 19, 2020, https://prsindia.org/files/covid19/notifications/1826.UK_Advisory_for_KMVN_and_GMVN_Mar19.pdf

[12] Advisory No. 123/XXIV-B-5/2020/03(01)/2020, Secretary Uttarakhand Government, March 21, 2020, https://prsindia.org/files/covid19/notifications/429.UK_Advisory_for_Board_Student_of_Uttarakhand_21_Mar.pdf.

[13] Advisory No. 122/XXIV-B-5/2020/03(01)/2020, Secretary Uttarakhand Government, March 21, 2020, https://prsindia.org/files/covid19/notifications/1828.UK_Advisory_for_Board_Student_of_FRI_Uttarakhand_Mar21.pdf.

On October 2, 2021, Swachh Bharat Mission (SBM) celebrates its seventh anniversary.  It was launched on October 2, 2014 to fulfil the vision of a cleaner India by October 2, 2019.  The objective of the Mission was to eliminate open defecation, eradicate manual scavenging, and promote scientific solid waste management.  In this blog post, we discuss the sanitation coverage leading up to the launch of the Swachh Bharat Mission and the progress made under this scheme.

Nation-wide sanitation programmes in past

According to the Census, the rural sanitation coverage in India was only 1% in 1981.  

The first nationwide programme with a focus on sanitation was the Central Rural Sanitation Programme (CRSP), which was started in 1986 to provide sanitation facilities in rural areas.  Later, in 1999, CRSP was restructured and launched as the Total Sanitation Campaign (TSC).  While CRSP was a supply-driven infrastructure-oriented programme based on subsidy, TSC was a demand-driven, community-led, project-based programme organised around the district as the unit.

By 2001, only 22% of the rural families had access to toilets.  It increased further to 32.7% by 2011.  In 2012, TSC was revamped as Nirmal Bharat Abhiyan (NBA) to accelerate the sanitation coverage in rural areas through saturation approach and by enhancing incentives for Individual Household Latrines (IHHL).

In comparison to rural sanitation, fewer programmes were enacted to tackle deficiencies in urban sanitation.  In the 1980s, the Integrated Low-Cost Sanitation Scheme provided subsidies for households to build low-cost toilets.  Additionally, the National Slum Development Project and its replacement programme, the Valmiki Ambedkar Awas Yojana launched in 2001, were programmes that aimed to construct community toilets for slum populations.  In 2008, the National Urban Sanitation Policy (NUSP) was announced to manage human excreta and associated public health and environmental impacts.

On October 2, 2014, the Swachh Bharat Mission was launched with two components: Swachh Bharat Mission (Gramin) and Swachh Bharat Mission (Urban), to focus on rural and urban sanitation, respectively.  While the rural component of the Mission is implemented under the Department of Drinking Water and Sanitation, the urban one is implemented by the Ministry of Housing and Urban Affairs.  In 2015, the Sub-Group of Chief Ministers on Swachh Bharat Abhiyaan under NITI Aayog had observed that the key difference between SBM and previous programmes was in the efforts to attract more partners to supplement public sector investment towards sanitation.

Swachh Bharat Mission – Gramin (SBM-Gramin)

The Sub-Group of Chief Ministers (2015) had noted that more than half of India’s 25 crore households do not have access to toilets close to places where they live.  Notably, during the 2015-19 period, a major portion of expenditure under the Department of Drinking Water and Sanitation was towards SBM-Gramin (see Figure 1).

Figure 1: Expenditure on Swachh Bharat Mission-Gramin during 2014-22


Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates.  Expenditure before 2019-20 were from the erstwhile Ministry of Drinking Water and Sanitation. 
Sources: Union Budgets 2014-15 to 2021-22; PRS.

The expenditure towards Swachh Bharat – Gramin saw a steady increase from 2014-15 (Rs 2,841 crore) to 2017-18 (Rs 16,888 crore) and a decrease in the subsequent years.  Moreover, during 2015-18, the expenditure of the scheme exceeded the budgeted amount by more than 10%.  However, every year since 2018-19, there has been some under-utilisation of the allocated amount. 

As per the Department of Drinking Water and Sanitation, 43.8% of the rural households had access to toilets in 2014-15, which increased to 100% in 2019-20 (see Figure 2).  However, the 15th Finance Commission (2020) noted that the practice of open defecation is still prevalent, despite access to toilets and highlighted that there is a need to sustain the behavioural change of people for using toilets. The Standing Committee on Rural Development raised a similar concern in 2018, noting that “even a village with 100% household toilets cannot be declared open defecation-free (ODF) till all the inhabitants start using them”.  The Standing Committee also raised questions over the construction quality of toilets and observed that the government is counting non-functional toilets, leading to inflated data.

Figure 2: Toilet coverage for rural households


Sources: Dashboard of SBM (Gramin), Ministry of Jal Shakti; PRS.

The 15th Finance Commission also noted that the scheme only provides financial incentives to construct latrines to households below the poverty line (BPL) and selected households above the poverty line.  It highlighted that there are considerable exclusion errors in finding BPL households and recommended the universalisation of the scheme to achieve 100% ODF status.

In March 2020, the Department of Drinking Water and Sanitation launched Phase II of SBM-Gramin which will focus on ODF Plus, and will be implemented from 2020-21 to 2024-25 with an outlay of Rs 1.41 lakh crore.  ODF Plus includes sustaining the ODF status, and solid and liquid waste management.  Specifically, it will ensure that effective solid and liquid waste management is instituted in every Gram Panchayat of the country.

Swachh Bharat Mission – Urban (SBM-Urban)

SBM-Urban aims at making urban India free from open defecation and achieving 100% scientific management of municipal solid waste in 4,000+ towns in the country.  One of its targets was the construction of 66 lakh individual household toilets (IHHLs) by October 2, 2019.  However, this target was then lowered to 59 lakh IHHLS by 2019.  This target was achieved by 2020 (see Table 1).

Table 1: Toilet construction under Swachh Bharat Mission-Urban (as of December 30, 2020)

Targets

Original Target

Revised Target  
(revised in 2019)

Actual Constructed

Individual Household Latrines

66,42,000

58,99,637

62,60,606

Community and Public Toilets

5,08,000

5,07,587

6,15,864

Sources: Swachh Bharat Mission Urban - Dashboard; PRS.

Figure 3: Expenditure on Swachh Bharat Mission-Urban during 2014-22 (in Rs crore)

Note: Values for 2020-21 are revised estimates and 2021-22 are budget estimates. 
Sources: Union Budget 2014-15 to 2021-22; PRS.

The Standing Committee on Urban Development noted in early 2020 that toilets built under the scheme in areas including East Delhi are of very poor quality, and do not have adequate maintenance.  Further, only 1,276 of the 4,320 cities declared to be open defecation free have toilets with water, maintenance, and hygiene.  Additionally, it also highlighted in September 2020 that uneven release of funds for solid waste management across states/UTs needs to be corrected to ensure fair implementation of the programme. 

The Standing Committee on Urban Development (2021) also expressed concern about the slow pace in achieving targets for source segregation and waste processing.  The completion of their targets stood at 78% and 68% respectively of the goal set under SBM-Urban during 2020-21.  In addition, other targets related to the door-to-door collection of waste also remained unfulfilled (see Table 2).

Table 2: Waste management under Swachh Bharat Mission-Urban (progress as of December 30, 2020)

Targets

Target

Progress
as of March 2020

Progress
as of December 2020

Door to Door Waste Collection (Wards)

86,284

81,535 (96%)

83,435 (97%)

Source Segregation (Wards)

86,284

64,730 (75%)

67,367 (78%)

Waste Processing (in %)

100%

65%

68%

Sources: Standing Committee on Urban Development (2021); PRS.

In February 2021, the Finance Minister announced in her budget speech that the Urban Swachh Bharat Mission 2.0 will be launched.  Urban Swachh Bharat Mission 2.0 will focus on: (i) sludge management, (ii) waste-water treatment, (iii) source segregation of garbage, (iv) reduction in single-use plastics and (v) control of air pollution caused by construction, demolition, and bio-remediation of dumpsites.  On October 1, 2021, the Prime Minister launched SBM-Urban 2.0 with the mission to make all our cities ‘Garbage Free’.