Speaker Meira Kumar has urged political parties to arrive at a consensus on the women’s reservation bill.  The 2008 Bill has the following main features.  1. It reserves one-third of all seats in Lok Sabha and Legislative Assemblies within each state for women.  2. There is quota-within-quota for SCs, STs and Anglo-Indians.  3. The reserved seats will be rotated after each general elections – thus after a cycle of three elections, all constituencies would have been reserved once.  This reservation will be operational for 15 years.  This Bill has had a chequered history.  A similar Bill was introduced in 1996, 1998 and 1999 – all of which lapsed after the dissolution of the respective Lok Sabhas.  A Joint Parliamentary Committee chaired by Geeta Mukherjee examined the 1996 Bill and made seven recommendations.  Five of these have been included in the latest 2008 Bill.  These are (i) reservation for a period of 15 years; (ii) including sub-reservation for Anglo Indians; (iii) including reservation in cases where the state has less than three seats in Lok Sabha (or less than three seats for SCs/STs); (iv) including reservation for the Delhi assembly; and (v) changing “not less than one-third” to “as nearly as may be, one-third”.  Two of the recommendations are not incorporated in the 2008 Bill.  The first is for reserving seats in Rajya Sabha and Legislative Councils.  The second is for sub-reservation for OBC women after the Constitution extends reservation to OBCs. The 2008 Bill was referred to the Standing Committee on Law and Justice.  This Committee failed to reach a consensus in its final report.  The Committee has recommendedthat the Bill “be passed in Parliament and put in action without further delay.  Two members of the Committee, Virender Bhatia and Shailendra Kumar (both belonging to the Samajwadi Party) dissented stating that they were not against providing reservation to women but disagreed with the way this Bill was drafted.  They had three recommendations:  (i) every political party must distribute 20% of its tickets to women; (ii) even in the current form, reservation should not exceed 20% of seats; and (iii) there should be a quota for women belonging to OBCs and minorities. The Standing committee considered two other methods of increasing representation.  One suggestion (part of election commission recommendations) was to requite political parties to nominate women for a minimum percentage of seats.  The committee felt that parties could bypass the spirit of the law by nominating women to losing seats.  The second recommendation was to create dual member constituencies, with women filling one of the two seats from those constituencies.  The Committee believed that this move could “result in women being reduced to a subservient status, which will defeat the very purpose of the Bill”. It is interesting to note that the Committee did not reject the two recommendations of the Geeta Mukherjee Committee that are not reflected in the Bill.  The Committee concluded that the issue of reservations to Rajya Sabha and Legislative Councils needs to be examined thoroughly as the upper Houses play an equally important role under the Constitution.  Incidentally, it is not possible to reserve seats in Rajya Sabha given the current system of elections to that house (see Appendix below). On the issue of  reservations to OBC women, the Committee said that “all other issues may be considered at an appropriate time by Government without any further delay at the present time in the passage of the Bill”. Though the Bill does not have a consensus – it has been opposed by SP, RJD and JD(U) – most parties have publicly expressed their support for it.  The government will likely not find it difficult to muster two-third support in each House of Parliament were the Bill be taken up for consideration and passing.  It would be interesting to see whether the Bill is brought before Parliament in the upcoming Budget Session. Appendix: Impossibility of Reservation in Rajya Sabha Article 80of the Constitution specifies that members of state assemblies will elect Rajya Sabha MPs through single transferable vote.  This implies that the votes are first allocated to the most preferred candidate, and then to the next preferred candidate, and so on.  This system cannot accommodate the principle of reserving a certain number of seats for a particular group.  Currently, Rajya Sabha does not have reservation for SCs and STs. Therefore, any system that provides reservation in Rajya Sabha implies that the Constitution must be amended to jettison the Single Transferable Vote system.

On November 28, 2012, the Comptroller and Auditor General submitted its report on the implementation of the Jawaharlal Nehru National Urban Renewal Mission (JNNURM).  According to the report most of the projects initiated under JNNURM have not been completed.  For instance with respect to urban infrastructure projects, only 231 projects out of the 1298 sanctioned projects have been completed.  Similarly, with respect to housing projects, only 22 of the 1517 projects have been completed.  Some of the other key recommendations of the report are:

  •  Some of the reasons for the delay in completing the projects include: (i) delay in acquiring land; (ii) deficiency in preparation of projects; and (iii) non-identification of beneficiaries which increased the risk of ineligible beneficiaries getting the benefits.
  •  A total allocation of Rs 66,084 crore had been made by the Planning Commission.  However, against this total allocation, the central government had made an allocation of only Rs 37,070 out of which until March 30, 2011 only Rs 32,934 had been released.
  • There was a delay in releasing these funds to the states.  A large portion of the funds was released only in the last quarter and more particularly in March.
  • The JNNURM guidelines were deficient as they did not provide adequate guidance to the states on the method of parking the funds and utilization of interest.

The need and objectives of JNNURM According to the 2011 census India’s urban population has increased from 286 million in 2001 to 377 million in 2011 .  With the increase in urban population, there is a requirement to improve the urban infrastructure and improve the service delivery mechanisms.  With these specific objectives in mind, the central government launched the Jawaharlal Nehru National Urban Renewal Mission 2005-2006.  The aim of the Mission is to encourage reforms and fast track planned development of identified cities (such as cities with a population of more than 1 million as per the 2001 census).  JNNURM has two main components namely : (i) Urban Infrastructure and Governance  and (ii) Urban Infrastructure Development for Small and Medium Towns. The duration of JNNURM was from 2005-06 to 2011-12. However, as the projects have not been completed the Government has extended its duration until March 2014. Funds for JNNURM The funds for JNNURM are provided through the Additional Central Assistance.  This implies that the funds are provided as grants to the states directly from the centre.   In the 2012 Union Budget, the central government has allocated Rs 12,522 crore for JNNURM. This represents around 10 % of the total central assistance through the different schemes to states and union territories in 2012-13. As on June 30 2012, 554 projects at a total cost of Rs 62,253 crore have been sanctioned under the Urban Infrastructure and Governance sub-mission of JNNURM.   The table below shows the status of the sanctioned JNNURM  projects in the different states. State wise status of the projects under JNNURM                 (as on August 6, 2012)

Name of State Total Allocation (Rs Lakh) Number of sanctioned projects Completed Projects
Andhra Pradesh 2,11,845 52 18
Arunachal Pradesh 10,740 3 NA
Assam 27,320 2 NA
Bihar 59,241 8 NA
Chandigarh 27,087 3 NA
Chattisgarh 24,803 1 NA
Delhi 2,82,318 23 4
Goa 12,094 2 NA
Gujarat 2,57,881 72 40
Haryana 32,332 4 NA
Himachal Pradesh 13,066 5 NA
Jammu & Kashmir 48,836 5 NA
Jharkhand 94,120 5 NA
Karnataka 1,52,459 47 22
Kerala 67,476 11 NA
Madhya Pradesh 1,32,850 23 7
Maharashtra 5,50,555 80 21
Manipur 15,287 3 NA
Meghalaya 15,668 2 NA
Mizoram 14,822 4 NA
Nagaland 11,628 3 NA
Orissa 32,235 5 NA
Punjab 70,775 6 1
Puducherry 20,680 2 NA
Rajasthan 74,869 13 2
Sikkim 10,613 2 NA
Tamil Nadu 2,25,066 48 12
Tripura 14,018 2 NA
Uttar Pradesh 2,76,941 33 4
Uttarakhand 40,534 14 NA
West Bengal 3,21,840 69 15

Source: Jawaharlal Nehru National Urban Renewal Mission; PRS.

  • Gujarat at 55.55% has the highest number of completed projects, while Uttar Pradesh at 12.24% has the lowest number of completed projects.
  • Out of the larger states, Delhi and Maharashtra at 17% and 26% have a comparatively low rate of completed projects.
  • Maharashtra has the highest number of sanctioned projects, while the North Eastern states, Chattisgarh and Puducherry have the lowest number of sanctioned projects.