Applications for the LAMP Fellowship 2025-26 will open on December 1, 2024. Sign up here to be notified when applications open.
Earlier this week, Rajya Sabha passed the Airports Economic Regulatory Authority of India (Amendment) Bill, 2019, and the Bill is now pending in Lok Sabha. The Bill amends the Airports Economic Regulatory Authority of India Act, 2008. The Act established the Airports Economic Regulatory Authority of India (AERA). AERA regulates tariffs and other charges for aeronautical services provided at civilian airports with annual traffic above 15 lakh passengers. It also monitors the performance standard of services across these airports. In this post, we explain the amendments that the Bill seeks to bring in and some of the issues around the functioning of the regulator.
Why was AERA created, and what is its role?
Few years back, private players started operating civilian airports. Typically, airports run the risk of becoming a monopoly because cities usually have one civilian airport which controls all aeronautical services in that area. To ensure that private airport operators do not misuse their monopoly, the need for an independent tariff regulator in the airport sector was felt. Consequently, the Airports Economic Regulatory Authority of India Act, 2008 (AERA Act) was passed which set up AERA.
AERA regulates tariffs and other charges (development fee and passenger service fee) for aeronautical services (air traffic management, landing and parking of aircraft, ground handling services) at major airports. Major airports include civilian airports with annual traffic above 15 lakh passengers. In 2018-19, there were 32 such airports (see Table 1). As of June 2019, 27 of these are being regulated by AERA (AERA also regulates tariffs at the Kannur airport which was used by 89,127 passengers in 2018-19). For the remaining airports, tariffs are determined by the Airports Authority of India (AAI), which is a body under the Ministry of Civil Aviation that also operates airports.
What changes are being proposed in the Bill?
The Bill seeks to do two things:
Definition of major airports: Currently, the AERA Act defines a major airport as one with annual passenger traffic over 15 lakh, or any other airports as notified by the central government. The Bill increases the threshold of annual passenger traffic for major airports to over 35 lakh.
Tariff determination by AERA: Under the Act, AERA is responsible for determining the: (i) tariff for aeronautical services every five years, (ii) development fees, and (iii) passengers service fee. It can also amend the tariffs in the interim period. The Bill adds that AERA will not determine: (i) tariff, (ii) tariff structures, or (iii) development fees, in certain cases. These cases include those where such tariff amounts were a part of the bid document on the basis of which the airport operations were awarded. AERA will be consulted (by the concessioning authority, the Ministry of Civil Aviation) before incorporating such tariffs in the bid document, and such tariffs must be notified.
Why is the Act getting amended?
The Statement of Objects and Reasons of the Bill states that the exponential growth of the sector has put tremendous pressure on AERA, while its resources are limited. Therefore, if too many airports come under the purview of AERA, it will not be able to perform its functions efficiently. If the challenge for AERA is availability of limited resources, the question is whether this problem may be resolved by reducing its jurisdiction (as the Bill is doing), or by improving its capacity.
Will the proposed amendments strengthen the role of the regulator?
When AERA was created in 2008, there were 11 airports with annual passenger traffic over 15 lakh. With increase in passenger traffic across airports, currently 32 airports are above this threshold. The Bill increases the threshold of annual passenger traffic for major airports to over 35 lakh. With this increase in threshold, 16 airports will be regulated by AERA. It may be argued that instead of strengthening the role of the regulator, its purview is being reduced.
Before AERA was set up, the Airports Authority of India (AAI) fixed the aeronautical charges for the airports under its control and prescribed performance standards for all airports and monitored them. Various committees had noted that AAI performed the role of airport operator as well as the regulator, which resulted in conflict of interest. Further, there was a natural monopoly in airports and air traffic control. In order to regulate the growing competition in the airline industry, and to provide a level playing field among different categories of airports, AERA was set up. During the deliberations of the Standing Committee examining the AERA Bill, 2007, the Ministry of Civil Aviation had noted that AERA should regulate tariff and monitor performance standards only at major airports. Depending upon future developments in the sector, other functions could be subsequently assigned to the regulator.
How would the Bill affect the regulatory regime?
Currently, there are 32 major airports (annual traffic above 15 lakh), and AERA regulates tariffs at 27 of these. As per the Bill, AERA will regulate 16 major airports (annual traffic above 35 lakh). The remaining 16 airports will be regulated by AAI. Till 2030-31, air traffic in the country is expected to grow at an average annual rate of 10-11%. This implies that in a few years, the traffic at the other 16 airports will increase to over 35 lakh and they will again fall under the purview of AERA. This may lead to constant changes in the regulatory regime at these airports. The table below provides the current list of major airports:
Table 1: List of major airports in India (as on March 2019)
Airports with annual traffic above 35 lakh | Airports with annual traffic between 15 and 35 lakh | ||||
Ahmedabad |
Goa |
Mumbai |
Amritsar |
Madurai* |
Srinagar |
Bengaluru |
Guwahati |
Patna |
Bagdogra |
Mangalore |
Trichy* |
Bhubaneswar |
Hyderabad |
Pune |
Calicut |
Nagpur |
Varanasi |
Chennai |
Jaipur |
Thiruvananthapuram |
Chandigarh |
Port Blair* |
Vishakhapatnam |
Cochin |
Kolkata |
Coimbatore |
Raipur* |
||
Delhi |
Lucknow |
Indore |
Ranchi* |
* - AERA does not regulate tariffs at these airports currently.
Sources: AAI Traffic News; AERA website; PRS.
Earlier this week, Lok Sabha passed the Bill that provides for the allocation of coal mines that were cancelled by the Supreme Court last year. In light of this development, this post looks at the issues surrounding coal block allocations and what the 2015 Bill seeks to achieve.
In September 2014, the Supreme Court cancelled the allocations of 204 coal blocks. Following the Supreme Court judgement, in October 2014, the government promulgated the Coal Mines (Special Provisions) Ordinance, 2014 for the allocation of the cancelled coal mines. The Ordinance, which was replaced by the Coal Mines (Special Provisions) Bill, 2014, could not be passed by Parliament in the last winter session, and lapsed. The government then promulgated the Coal Mines (Special Provisions) Second Ordinance, 2014 on December 26, 2014. The Coal Mines (Special Provisions) Bill, 2015 replaces the second Ordinance and was passed by Lok Sabha on March 4, 2015. Why is coal considered relevant? Coal mining in India has primarily been driven by the need for energy domestically. About 55% of the current commercial energy use is met by coal. The power sector is the major consumer of coal, using about 80% of domestically produced coal. As of April 1, 2014, India is estimated to have a cumulative total of 301.56 billion tonnes of coal reserves up to a depth of 1200 meters. Coal deposits are mainly located in Jharkhand, Odisha, Chhattisgarh, West Bengal, Madhya Pradesh, Andhra Pradesh and Maharashtra. How is coal regulated? The Ministry of Coal has the overall responsibility of managing coal reserves in the country. Coal India Limited, established in 1975, is a public sector undertaking, which looks at the production and marketing of coal in India. Currently, the sector is regulated by the ministry’s Coal Controller’s Organization. The Coal Mines (Nationalisation) Act, 1973 (CMN Act) is the primary legislation determining the eligibility for coal mining in India. The CMN Act allows private Indian companies to mine coal only for captive use. Captive mining is the coal mined for a specific end-use by the mine owner, but not for open sale in the market. End-uses currently allowed under the CMN Act include iron and steel production, generation of power, cement production and coal washing. The central government may notify additional end-uses. How were coal blocks allocated so far? Till 1993, there were no specific criteria for the allocation of captive coal blocks. Captive mining for coal was allowed in 1993 by amendments to the CMN Act. In 1993, a Screening Committee was set up by the Ministry of Coal to provide recommendations on allocations for captive coal mines. All allocations to private companies were made through the Screening Committee. For government companies, allocations for captive mining were made directly by the ministry. Certain coal blocks were allocated by the Ministry of Power for Ultra Mega Power Projects (UMPP) through tariff based competitive bidding (bidding for coal based on the tariff at which power is sold). Between 1993 and 2011, 218 coal blocks were allocated to both public and private companies under the CMN Act. What did the 2014 Supreme Court judgement do? In August 2012, the Comptroller and Auditor General of India released a report on the coal block allocations. CAG recommended that the allocation process should be made more transparent and objective, and done through competitive bidding. Following this report, in September 2012, a Public Interest Litigation matter was filed in the Supreme Court against the coal block allocations. The petition sought to cancel the allotment of the coal blocks in public interest on grounds that it was arbitrary, illegal and unconstitutional. In September 2014, the Supreme Court declared all allocations of coal blocks, made through the Screening Committee and through Government Dispensation route since 1993, as illegal. It cancelled the allocation of 204 out of 218 coal blocks. The allocations were deemed illegal on the grounds that: (i) the allocation procedure followed by the Screening Committee was arbitrary, and (ii) no objective criterion was used to determine the selection of companies. Further, the allocation procedure was held to be impermissible under the CMN Act. Among the 218 coal blocks, 40 were under production and six were ready to start production. Of the 40 blocks under production, 37 were cancelled and of the six ready to produce blocks, five were cancelled. However, the allocation to Ultra Mega Power Projects, which was done via competitive bidding for lowest tariffs, was not declared illegal. What does the 2015 Bill seek to do? Following the cancellation of the coal blocks, concerns were raised about further shortage in the supply of coal, resulting in more power supply disruptions. The 2015 Bill primarily seeks to allocate the coal mines that were declared illegal by the Supreme Court. It provides details for the auction process, compensation for the prior allottees, the process for transfer of mines and details of authorities that would conduct the auction. In December 2014, the ministry notified the Coal Mines (Special Provisions) Rules, 2014. The Rules provide further guidelines in relation to the eligibility and compensation for prior allottees. How is the allocation of coal blocks to be carried out through the 2015 Bill? The Bill creates three categories of mines, Schedule I, II and III. Schedule I consists of all the 204 mines that were cancelled by the Supreme Court. Of these mines, Schedule II consists of all the 42 mines that are under production and Schedule III consists of 32 mines that have a specified end-use such as power, iron and steel, cement and coal washing. Schedule I mines can be allocated by way of either public auction or allocation. For the public auction route any government, private or joint venture company can bid for the coal blocks. They can use the coal mined from these blocks for their own consumption, sale or for any other purpose as specified in their mining lease. The government may also choose to allot Schedule I mines to any government company or any company that was awarded a power plant project through competitive bidding. In such a case, a government company can use the coal mined for own consumption or sale. However, the Bill does not provide clarity on the purpose for which private companies can use the coal. Schedule II and III mines are to be allocated by way of public auction, and the auctions have to be completed by March 31, 2015. Any government company, private company or a joint venture with a specified end-use is eligible to bid for these mines. In addition, the Bill also provides details on authorities that would conduct the auction and allotment and the compensation for prior allottees. Prior allottees are not eligible to participate in the auction process if: (i) they have not paid the additional levy imposed by the Supreme Court; or (ii) if they are convicted of an offence related to coal block allocation and sentenced to imprisonment of more than three years. What are some of the issues to consider in the 2015 Bill? One of the major policy shifts the 2015 Bill seeks to achieve is to enable private companies to mine coal in the future, in order to improve the supply of coal in the market. Currently, the coal sector is regulated by the Coal Controller’s Organization, which is under the Ministry of Coal. The Bill does not establish an independent regulator to ensure a level playing field for both private and government companies bidding for auction of mines to conduct coal mining operations. In the past, when other sectors have opened up to the private sector, an independent regulatory body has been established beforehand. For example, the Telecom Regulatory Authority of India, an independent regulatory body, was established when the telecom sector was opened up for private service providers. The Bill also does not specify any guidelines on the monitoring of mining activities by the new allottees. While the Bill provides broad details of the process of auction and allotment, the actual results with regards to money coming in to the states, will depend more on specific details, such as the tender documents and floor price. It is also to be seen whether the new allotment process ensures equitable distribution of coal blocks among the companies and creates a fair, level-playing field for them. In the past, the functioning of coal mines has been delayed due to delays in land acquisition and environmental clearances. This Bill does not address these issues. The auctioning of coal blocks resulting in improving the supply of coal, and in turn addressing the problem of power shortage in the country, will also depend on the efficient functioning of the mines, in addition to factors such as transparent allocations.