The Prevention of Torture Bill, 2010 was introduced in the Lok Sabha on April 26, 2010, and was passed by the Lok Sabha on May 6 (See Bill Summary here).  The Bill was not referred to a Standing Committee of Parliament.  The Bill has been introduced to allow India to ratify the United Nations Convention against Torture and Other Cruel, Inhuman and Degrading Treatment or Punishment.  The Convention against Torture requires member countries to bring their domestic legislation in conformity with the provisions of the Convention.  The main features of the Bill, and the issues are highlighted below (For the PRS Legislative Brief on the Bill, click here). Main features of the Torture Bill

Features Explanation
Definition of ‘torture’ A public servant or any person with a public servant’s  consent commits torture if all three conditions are met:
  1. An act results in (i) Grievous hurt to any person  (Grievous hurt as defined in the Indian Penal Code - includes damage to limbs or organs); or (ii) danger to life, limb or health (mental pr physical) of any person, and
  2. The act is done intentionally, and
  3. The act is done with the purpose of getting information or a confession.
When is torture punishable?
  1. When it is committed for gaining a confession or other information for detecting an offence, and
  2. The torture is committed on certain grounds such as religion, race, language, caste, or ‘any other ground’.
Conditions under which courts can admit complaints
  1. The complaint has to be made within six months of the torture having been committed.
  2. The approval of the central or state government appointing the accused public servant has been taken.

The definition of torture The definition of torture raises the following issues:

  • It is inconsistent with the definition of torture in the Convention against Torture which India seeks to ratify;
  • It does not include many acts amounting to torture which are punishable under the Indian Penal Code;
  • It adds a requirement of proving the intention of the accused person to commit torture.  Current provisions in the IPC do not have this requirement.
  • Grievous hurt does not include mental suffering or pain.

Dilution of existing laws on torture The Bill makes it difficult for those accused of torture to be tried.  This is because (a) complaints against acts of torture have to be made within six months, and (b) the previous sanction of the appropriate government has to be sought before a court can entertain a complaint.

Relevant provisions in the Criminal Procedure Code and the Bill.
Subject Criminal Procedure Code Bill
Requirement of government sanction Sanction needed if (a) a public servant is not removable except with the sanction of the appropriate government, and (b) the public servant was acting in the course of his duties. Prior sanction of the appropriate government needed in all cases.
Time limits for filing complaints Time-limits exist for offences punishable with maximum imprisonment of up to three years. No time limits for offences which are punishable with imprisonment of more than three years. There is a time-limit though torture is punishable with maximum imprisonment of up to ten years.  Complaints have to be filed within six months.
Sources: Sections 197 and 468 of the Criminal Procedure Code, 1973; PRS.

Independent authority to investigate complaints There is no independent mechanism/ authority to investigate complaints of torture. The investigating agency in most cases of torture would be the police.  In many cases, personnel of the police would also be  alleged to have committed torture.  In such cases, the effectiveness of investigations in incidents of torture will be affected.

Independent authorities in other countries to investigate incidents of torture.
Country Authority/ Institution
France Comptroller General of the places of deprivation of liberty
Germany The Federal Agency for the Prevention of Torture
New Zealand Human Rights Commission, Police Complaints Authority, Children’s Commissioner
United Kingdom 18 different organisations, including Independent Monitoring Board, Independent Custody Visiting Associations, etc.
Sources: National Preventive Mechanisms, UN Subcommittee on Prevention of Torture; PRS.

Police Personnel sent for trials under existing laws, and convictions

Earlier this week, Lok Sabha passed the Bill that provides for the allocation of coal mines that were cancelled by the Supreme Court last year.  In light of this development, this post looks at the issues surrounding coal block allocations and what the 2015 Bill seeks to achieve.

In September 2014, the Supreme Court cancelled the allocations of 204 coal blocks.  Following the Supreme Court judgement, in October 2014, the government promulgated the Coal Mines (Special Provisions) Ordinance, 2014 for the allocation of the cancelled coal mines.  The Ordinance, which was replaced by the Coal Mines (Special Provisions) Bill, 2014, could not be passed by Parliament in the last winter session, and lapsed. The government then promulgated the Coal Mines (Special Provisions) Second Ordinance, 2014 on December 26, 2014.  The Coal Mines (Special Provisions) Bill, 2015 replaces the second Ordinance and was passed by Lok Sabha on March 4, 2015. Why is coal considered relevant? Coal mining in India has primarily been driven by the need for energy domestically.  About 55% of the current commercial energy use is met by coal.  The power sector is the major consumer of coal, using about 80% of domestically produced coal. As of April 1, 2014, India is estimated to have a cumulative total of 301.56 billion tonnes of coal reserves up to a depth of 1200 meters.  Coal deposits are mainly located in Jharkhand, Odisha, Chhattisgarh, West Bengal, Madhya Pradesh, Andhra Pradesh and Maharashtra. How is coal regulated? The Ministry of Coal has the overall responsibility of managing coal reserves in the country.  Coal India Limited, established in 1975, is a public sector undertaking, which looks at the production and marketing of coal in India.  Currently, the sector is regulated by the ministry’s Coal Controller’s Organization. The Coal Mines (Nationalisation) Act, 1973 (CMN Act) is the primary legislation determining the eligibility for coal mining in India.  The CMN Act allows private Indian companies to mine coal only for captive use.  Captive mining is the coal mined for a specific end-use by the mine owner, but not for open sale in the market.  End-uses currently allowed under the CMN Act include iron and steel production, generation of power, cement production and coal washing.  The central government may notify additional end-uses. How were coal blocks allocated so far? Till 1993, there were no specific criteria for the allocation of captive coal blocks.  Captive mining for coal was allowed in 1993 by amendments to the CMN Act.  In 1993, a Screening Committee was set up by the Ministry of Coal to provide recommendations on allocations for captive coal mines.  All allocations to private companies were made through the Screening Committee.  For government companies, allocations for captive mining were made directly by the ministry.  Certain coal blocks were allocated by the Ministry of Power for Ultra Mega Power Projects (UMPP) through tariff based competitive bidding (bidding for coal based on the tariff at which power is sold).  Between 1993 and 2011, 218 coal blocks were allocated to both public and private companies under the CMN Act. What did the 2014 Supreme Court judgement do? In August 2012, the Comptroller and Auditor General of India released a report on the coal block allocations. CAG recommended that the allocation process should be made more transparent and objective, and done through competitive bidding. Following this report, in September 2012, a Public Interest Litigation matter was filed in the Supreme Court against the coal block allocations.  The petition sought to cancel the allotment of the coal blocks in public interest on grounds that it was arbitrary, illegal and unconstitutional. In September 2014, the Supreme Court declared all allocations of coal blocks, made through the Screening Committee and through Government Dispensation route since 1993, as illegal.  It cancelled the allocation of 204 out of 218 coal blocks.  The allocations were deemed illegal on the grounds that: (i) the allocation procedure followed by the Screening Committee was arbitrary, and (ii) no objective criterion was used to determine the selection of companies.  Further, the allocation procedure was held to be impermissible under the CMN Act. Among the 218 coal blocks, 40 were under production and six were ready to start production.  Of the 40 blocks under production, 37 were cancelled and of the six ready to produce blocks, five were cancelled.  However, the allocation to Ultra Mega Power Projects, which was done via competitive bidding for lowest tariffs, was not declared illegal. What does the 2015 Bill seek to do? Following the cancellation of the coal blocks, concerns were raised about further shortage in the supply of coal, resulting in more power supply disruptions.  The 2015 Bill primarily seeks to allocate the coal mines that were declared illegal by the Supreme Court.  It provides details for the auction process, compensation for the prior allottees, the process for transfer of mines and details of authorities that would conduct the auction.  In December 2014, the ministry notified the Coal Mines (Special Provisions) Rules, 2014.  The Rules provide further guidelines in relation to the eligibility and compensation for prior allottees. How is the allocation of coal blocks to be carried out through the 2015 Bill? The Bill creates three categories of mines, Schedule I, II and III.  Schedule I consists of all the 204 mines that were cancelled by the Supreme Court.  Of these mines, Schedule II consists of all the 42 mines that are under production and Schedule III consists of 32 mines that have a specified end-use such as power, iron and steel, cement and coal washing. Schedule I mines can be allocated by way of either public auction or allocation.  For the public auction route any government, private or joint venture company can bid for the coal blocks.  They can use the coal mined from these blocks for their own consumption, sale or for any other purpose as specified in their mining lease.  The government may also choose to allot Schedule I mines to any government company or any company that was awarded a power plant project through competitive bidding.  In such a case, a government company can use the coal mined for own consumption or sale.  However, the Bill does not provide clarity on the purpose for which private companies can use the coal. Schedule II and III mines are to be allocated by way of public auction, and the auctions have to be completed by March 31, 2015.  Any government company, private company or a joint venture with a specified end-use is eligible to bid for these mines. In addition, the Bill also provides details on authorities that would conduct the auction and allotment and the compensation for prior allottees.  Prior allottees are not eligible to participate in the auction process if: (i) they have not paid the additional levy imposed by the Supreme Court; or (ii) if they are convicted of an offence related to coal block allocation and sentenced to imprisonment of more than three years. What are some of the issues to consider in the 2015 Bill? One of the major policy shifts the 2015 Bill seeks to achieve is to enable private companies to mine coal in the future, in order to improve the supply of coal in the market.  Currently, the coal sector is regulated by the Coal Controller’s Organization, which is under the Ministry of Coal.  The Bill does not establish an independent regulator to ensure a level playing field for both private and government companies bidding for auction of mines to conduct coal mining operations.   In the past, when other sectors have opened up to the private sector, an independent regulatory body has been established beforehand.  For example, the Telecom Regulatory Authority of India, an independent regulatory body, was established when the telecom sector was opened up for private service providers.  The Bill also does not specify any guidelines on the monitoring of mining activities by the new allottees. While the Bill provides broad details of the process of auction and allotment, the actual results with regards to money coming in to the states, will depend more on specific details, such as the tender documents and floor price.  It is also to be seen whether the new allotment process ensures equitable distribution of coal blocks among the companies and creates a fair, level-playing field for them.  In the past, the functioning of coal mines has been delayed due to delays in land acquisition and environmental clearances.  This Bill does not address these issues.  The auctioning of coal blocks resulting in improving the supply of coal, and in turn addressing the problem of power shortage in the country, will also depend on the efficient functioning of the mines,  in addition to factors such as transparent allocations.