Earlier this month, guidelines for the Swachh Bharat Mission (Gramin) were released by the Ministry of Drinking Water and Sanitation.  Key features of the Swachh Bharat Mission (Gramin), as outlined in the guidelines, are detailed below.  In addition, a brief overview of sanitation levels in the country is provided, along with major schemes of the central government to improve rural sanitation. The Swachh Bharat Mission, launched in October 2014, consists of two sub-missions – the Swachh Bharat Mission (Gramin) (SBM-G), which will be implemented in rural areas, and the Swachh Bharat Mission (Urban), which will be implemented in urban areas.  SBM-G seeks to eliminate open defecation in rural areas by 2019 through improving access to sanitation.  It also seeks to generate awareness to motivate communities to adopt sustainable sanitation practices, and encourage the use of appropriate technologies for sanitation. I. Context Data from the last three Census’, in Table 1, shows that while there has been some improvement in the number of households with toilets; this number remains low in the country, especially in rural areas. Table 1:  Percentage of households with toilets (national)

Year Rural Urban Total
1991 9% 64% 24%
2001 22% 74% 36%
2011 31% 81% 47%

In addition, there is significant variation across states in terms of availability of household toilets in rural areas, as shown in Table 2.  Table 2 also shows the change in percentage of rural households with toilets from 2001 to 2011.  It is evident that the pace of this change has varied across states over the decade. Table 2: Percentage of rural households with toilets

State

2001

2011

% Change

Andhra Pradesh

18

32

14

Arunachal Pradesh

47

53

5

Assam

60

60

0

Bihar

14

18

4

Chhattisgarh

5

15

9

Goa

48

71

23

Gujarat

22

33

11

Haryana

29

56

27

Himachal Pradesh

28

67

39

Jammu and Kashmir

42

39

-3

Jharkhand

7

8

1

Karnataka

17

28

11

Kerala

81

93

12

Madhya Pradesh

9

13

4

Maharashtra

18

38

20

Manipur

78

86

9

Meghalaya

40

54

14

Mizoram

80

85

5

Nagaland

65

69

5

Odisha

8

14

6

Punjab

41

70

30

Rajasthan

15

20

5

Sikkim

59

84

25

Tamil Nadu

14

23

9

Tripura

78

82

4

Uttar Pradesh

19

22

3

Uttarakhand

32

54

23

West Bengal

27

47

20

All India

22

31

9

II. Major schemes of the central government to improve rural sanitation The central government has been implementing schemes to improve access to sanitation in rural areas from the Ist Five Year Plan (1951-56) onwards.  Major schemes of the central government dealing with rural sanitation are outlined below.

Central Rural Sanitation Programme (1986): The Central Rural Sanitation Programme was one of the first schemes of the central government which focussed solely on rural sanitation.  The programme sought to construct household toilets, construct sanitary complexes for women, establish sanitary marts, and ensure solid and liquid waste management.
Total Sanitation Campaign (1999): The Total Sanitation Campaign was launched in 1999 with a greater focus on Information, Education and Communication (IEC) activities in order to make the creation of sanitation facilities demand driven rather than supply driven. Key components of the Total Sanitation Campaign included: (i) financial assistance to rural families below the poverty line for the construction of household toilets, (ii) construction of community sanitary complexes, (iii) construction of toilets in government schools and aganwadis, (iv) funds for IEC activities, (v) assistance to rural sanitary marts, and (vi) solid and liquid waste management.
Nirmal Bharat Abhiyan (2012): In 2012, the Total Sanitation Campaign was replaced by the Nirmal Bharat Abhiyan (NBA), which also focused on the previous elements.  According to the Ministry of Drinking Water and Sanitation, the key shifts in NBA were: (i) a greater focus on coverage for the whole community instead of a focus on individual houses, (ii) the inclusion of certain households which were above the poverty line, and (iii) more funds for IEC activities, with 15% of funds at the district level earmarked for IEC.
Swachh Bharat Mission (Gramin) (2014): Earlier this year, in October, NBA was replaced by Swachh Bharat Mission (Gramin) (SBM-G) which is a sub-mission under Swachh Bharat Mission.  SBM-G also includes the key components of the earlier sanitation schemes such as the funding for the construction of individual household toilets, construction of community sanitary complexes, waste management, and IEC. Key features of SBM-G, and major departures from earlier sanitation schemes, are outlined in the next section.

III. Guidelines for Swachh Bharat Mission (Gramin) The guidelines for SBM-G, released earlier this month, outline the strategy to be adopted for its implementation, funding, and monitoring. Objectives: Key objectives of SBM-G include: (i) improving the quality of life in rural areas through promoting cleanliness and eliminating open defecation by 2019, (ii) motivating communities and panchayati raj institutions to adopt sustainable sanitation practices, (iii) encouraging appropriate technologies for sustainable sanitation, and (iv) developing community managed solid and liquid waste management systems. Institutional framework: While NBA had a four tier implementation mechanism at the state, district, village, and block level, an additional tier has been added for SBM-G, at the national level.  Thus, the implementation mechanisms at the five levels will consist of: (i) National Swachh Bharat Mission (Gramin), (ii) State Swachh Bharat Mission (Gramin), (iii) District Swachh Bharat Mission (Gramin), (iv) Block Programme Management Unit, and (v) Gram Panchayat/Village and Water Sanitation Committee.  At the Gram Panchayat level, Swachhta Doots may be hired to assist with activities such as identification of beneficiaries, IEC, and maintenance of records. Planning: As was done under NBA, each state must prepare an Annual State Implementation Plan.  Gram Panchayats must prepare implementation plans, which will be consolidated into Block Implementation Plans.  These Block Implementation Plans will further be consolidated into District Implementation Plans.  Finally, District Implementation Plans will be consolidated in a State Implementation Plan by the State Swachh Bharat Mission (Gramin). A Plan Approval Committee in Ministry of Drinking Water and Sanitation will review the State Implementation Plans.  The final State Implementation Plan will be prepared by states based on the allocation of funds, and then approved by National Scheme Sanctioning Committee of the Ministry. Funding: Funding for SBM-G will be through budgetary allocations of the central and state governments, the Swachh Bharat Kosh, and multilateral agencies.  The Swachh Bharat Kosh has been established to collect funds from non-governmental sources.  Table 3, below, details the fund sharing pattern for SBM-G between the central and state government, as provided for in the SBM-G guidelines. Table 3: Funding for SBM-G across components

Component Centre State Beneficiary Amount as a % of SBM-G outlay
IEC, start-up activities, etc 75% 25% - 8%
Revolving fund 80% 20% - Up to 5%
Construction of household toilets 75%(Rs 9000)90% for J&K, NE states, special category states 25%(Rs 3000)10% for J&K, NE states, special category states -- Amount required for full coverage
Community sanitary complexes 60% 30% 10% Amount required for full coverage
Solid/Liquid Waste Management 75% 25% - Amount required within limits permitted
Administrative charges 75% 25% - Up to 2% of the project cost

One of the changes from NBA, in terms of funding, is that funds for IEC will be up to 8% of the total outlay under SBM-G, as opposed to up to 15% (calculated at the district level) under NBA.  Secondly, the amount provided for the construction of household toilets has increased from Rs 10,000 to Rs 12,000.  Thirdly, while earlier funding for household toilets was partly through NBA and partly though the Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS), the provision for MGNREGS funding has been done away with under SBM-G.  This implies that the central government’s share will be met entirely through SBM-G. Implementation: The key components of the implementation of SBM-G will include: (i) start up activities including preparation of state plans, (ii) IEC activities, (iii) capacity building of functionaries, (iv) construction of household toilets, (v) construction of community sanitary complexes, (vi) a revolving fund at the district level to assist Self Help Groups and others in providing cheap finance to their members (vii) funds for rural sanitary marts, where materials for the construction of toilets, etc., may be purchased, and (viii) funds for solid and liquid waste management. Under SBM-G, construction of toilets in government schools and aganwadis will be done by the Ministry of Human Resource Development and Ministry of Women and Child Development, respectively.  Previously, the Ministry of Drinking Water and Sanitation was responsible for this. Monitoring: Swachh Bharat Missions (Gramin) at the national, state, and district levels will each have monitoring units.  Annual monitoring will be done at the national level by third party independent agencies.  In addition, concurrent monitoring will be done, ideally at the community level, through the use of Information and Communications Technology. More information on SBM-G is available in the SBM-G guidelines, here.  

In law, the addition or deletion a single punctuation or a single word can have a major impact on the effect of that law.  One such example can be seen from the recommended changes in the Civil Liability for Nuclear Damage Bill, 2010 by Parliament’s Standing Committee. The Civil Liability for Nuclear Damage Bill, 2010 was introduced in the Lok Sabha on May 7, 2010.  The Bill was referred to the Parliamentary Committee on Science and Technology, Environment and Forests, which submitted its report on the Bill yesterday (August 18, 2010).  The Committee has made a number of recommendations regarding certain clauses in the Bill (See summary here).  One of these may have the effect of diluting the provision currently in the Bill.  The main recommendations pertain to:

  • Preventing the entry of private operators.
  • Allowing the government to increase the total liability for a nuclear incident by notification, but not decrease it.
  • Increasing the liability of the operator to Rs 1,500 crore from Rs 500 crore.
  • Increasing the time limit for claiming compensation to 20 years from 10 years.
  • Changing the provision giving operators a right of recourse against persons actually responsible for causing damage.

Clause 17 of the Bill which gives operators a right of recourse against those actually causing damage had been opposed as it was felt that it was not strong enough to hold suppliers liable in case the damage was caused by them.  Clause 17 gave a right of recourse under three conditions.  The exact clause is reproduced below: The operator of a nuclear installation shall have a right of recourse where — (a) such right is expressly provided for in a contract in writing; (b) the nuclear incident has resulted from the wilful act or gross negligence on the part of the supplier of the material, equipment or services, or of his employee; (c) the nuclear incident has resulted from the act of commission or omission of a person done with the intent to cause nuclear damage. Under this clause, a right of recourse exists when (a) there is a contract giving such a right, or (b) the supplier acts deliberately or in a grossly negligent manner to cause nuclear damage, or (c) a person causes nuclear damage with the intent to do so.  If any of the three cases can be proved by the operator, he has a right of recourse. The Committee has stated that “Clause 17(b) gives escape route to the suppliers of nuclear materials, equipments, services of his employees as their willful act or gross negligence would be difficult to establish in a civil nuclear compensation case.” It recommended that Clause 17(b) should be modified to cover consequences “of latent or patent defect, supply of sub-standard material, defective equipment or services or from the gross negligence on the part of the supplier of the material, equipment or service.” The Committee also recommended another change in Clause 17.  It recommended that clause 17(a) may end with “and”. This provision may dilute the right of recourse available to operators.  The modified clause 17 would read as: The operator of a nuclear installation shall have a right of recourse where — (a) such right is expressly provided for in a contract in writing; and, (b) the nuclear incident has resulted as a consequence of latent or patent defect, supply of sub-standard material, defective equipment or services or from the gross negligence on the part of the supplier of the material, equipment or services.; (c) the nuclear incident has resulted from the act of commission or omission of a person done with the intent to cause nuclear damage. This implies that for Clauses 17(b) or (c) to be applicable, the condition specified in clause 17(a) has to be compulsorily satisfied.  Two examples highlight the consequence of the recommended change in Clause 17(a) of the Bill:

  1. A person X deliberately commits sabotage in a nuclear plant and causes damage.  Under the Bill, the operator has recourse under Clause 17(c).  If the recommendation regarding clause 17 is accepted, the operator may also have to also prove the existence of a pre-existing contract with X in addition to clause 17(c).
  2. If a supplier supplies defective equipment, but does not have a contract in writing stating that he will be liable for damage caused by defective equipment, the operator may not have a right of recourse against the supplier under 17(b).

The effect of the changes recommended by the committee may thus dilute the provision as it exists in the Bill.  The table below compares the position in the Bill and the position as per the Standing Committee’s recommendations:

Right of recourse - The Bill gives operators a right to recourse under three conditions:  (a) if there is a clear contract; (b) if the damage is caused by someone with intent to cause damage; (c) against suppliers if damage is caused by their wilful act or negligence. In the Bill the three conditions are separated by a semi-colon.  The Committee recommended that the semi-colon in clause 17(a) should be replaced by “and”. This might imply that all three conditions mentioned need to exist for an operator to have recourse.
Right to recourse against suppliers exists in cases of “willful act or gross negligence on the part of the supplier”. (Clause 17) The Committee felt that the right of recourse against suppliers is vague.  It recommended that recourse against the supplier should be strengthened.  The supplier is liable if an incident has occurred due to (i) defects, or (ii) sub-standard material, or (iii) gross negligence of the supplier of the material, equipment or services. The variance with the Convention continues to exist.