Applications for the LAMP Fellowship 2025-26 will open soon. Sign up here to be notified when the dates are announced.
The ongoing Monsoon Session of Parliament is being widely viewed as the 'make or break' session for passing legislation before the end of the 15th Lok Sabha in 2014. Hanging in balance are numerous important Bills, which will lapse if not passed before the upcoming 2014 national elections. Data indicates that the current Lok Sabha has passed the least number of Bills in comparison to other comparable Lok Sabhas. The allocated time to be spent on legislation in the Monsoon Session is also below the time recommended for discussion and passing of Bills by the Business Advisory Committee of the Lok Sabha. Eight out of a total of 16 sittings of the Monsoon Session have finished with only 15 percent of the total time spent productively. Success rate of the 15th Lok Sabha in passing legislation India’s first Lok Sabha (1952-1957) passed a total of 333 Bills in its five year tenure. Since then, every Lok Sabha which has completed over three years of its full term has passed an average of 317 Bills. Where a Lok Sabha has lasted for less than 3 years, it has passed an average of 77 Bills. This includes the 6th, 9th, 11th and 12th Lok Sabhas. The ongoing 15th Lok Sabha, which is in the fifth year of its tenure, has passed only 151 Bills (This includes the two Bills passed in the Monsoon Session as of August 18, 2013). In terms of parliamentary sessions, Lok Sabhas that have lasted over three years have had an average of fifteen sessions. The 15th Lok Sabha has finished thirteen parliamentary sessions with the fourteenth (Monsoon Session) currently underway. Legislative business accomplished in the 15th Lok Sabha For the 15th Lok Sabha, a comparison of the government's legislative agenda at the beginning of a parliamentary session with the actual number of Bills introduced and passed at the end of the session shows that: (i) on average, government has a success rate of getting 39 percent of Bills passed; and (ii) on average, 60 percent success rate in getting Bills introduced. The Monsoon Session of Parliament was scheduled to have a total of 16 sitting days between August 5-30, 2013. Of the 43 Bills listed for consideration and passage, 32 are Bills pending from previous sessions. As of August 18, 2013, the Rajya Sabha had passed a total of five Bills while the Lok Sabha had passed none. Of the 25 Bills listed for introduction, ten have been introduced so far. The Budget Session of Parliament earlier this year saw the passage of only two Bills, apart from the appropriation Bills, of the 38 listed for passing. These were the Protection of Women Against Sexual Harassment at Workplace Bill and the Criminal Law (Amendment) Bill. Time allocated for legislation in the Monsoon Session The Lok Sabha is scheduled to meet for six hours and the Rajya Sabha for five hours every day. Both houses have a question hour and a zero hour at the beginning of the day, which leaves four hours for legislative business in the Lok Sabha and three hours in the Rajya Sabha. However, both Houses can decide to meet for a longer duration. For example, Rajya Sabha has decided to meet till 6:00 PM every day in the Monsoon Session as against the normal working hours of the House until 5:00 PM. The Business Advisory Committee (BAC) of both Houses recommends the time that should be allocated for discussion on each Bill. This session's legislative agenda includes a total of 43 Bills to be passed by Parliament. So far, 30 of the Bills have been allocated time by the BAC, adding up to a total of 78 hours of discussion before passing. If the Lok Sabha was to discuss and debate the 30 Bills for roughly the same time as was recommended by the BAC, it would need a minimum of 20 working days. In addition, extra working days would need to be allocated to discuss and debate the remaining 13 Bills. With eight sitting days left and not a single Bill being passed by the Lok Sabha, it is unclear how the Lok Sabha will be able to make up the time to pass Bills with thorough debate.
In Budget Session 2018, Rajya Sabha has planned to examine the working of four ministries. The Ministry of Drinking Water and Sanitation is one of the ministries listed for discussion. In this post, we look at the key schemes being implemented by the Ministry and their status.
What are the key functions of the Ministry of Drinking Water and Sanitation?
As per the Constitution, supply of water and sanitation are state subjects which means that states regulate and provide these services. The Ministry of Drinking Water and Sanitation is primarily responsible for policy planning, funding, and coordination of programs for: (i) safe drinking water; and (ii) sanitation, in rural areas. From 1999 till 2011, the Ministry operated as a Department under the Ministry of Rural Development. In 2011, the Department was made an independent Ministry. Presently, the Ministry oversees the implementation of two key schemes of the government: (i) Swachh Bharat Mission-Gramin (SBM-G), and (ii) National Rural Drinking Water Programme (NRDWP).
How have the finances and spending priorities of the Ministry changed over time?
In the Union Budget 2018-19, the Ministry has been allocated Rs 22,357 crore. This is a decrease of Rs 1,654 crore (7%) over the revised expenditure of 2017-18. In 2015-16, the Ministry over-shot its budget by 178%. Consequently, the allocation in 2016-17 was more than doubled (124%) to Rs 14,009 crore.
In recent years, the priorities of the Ministry have seen a shift (see Figure 1). The focus has been on providing sanitation facilities in rural areas, mobilising behavioural change to increase usage of toilets, and consequently eliminating open defecation. However, this has translated into a decrease in the share of allocation towards drinking water (from 87% in 2009-10 to 31% in 2018-19). In the same period, the share of allocation to rural sanitation has increased from 13% to 69%.
What has been the progress under Swacch Bharat Mission- Gramin?
The Swachh Bharat Mission was launched on October 2, 2014 with an aim to achieve universal sanitation coverage, improve cleanliness, and eliminate open defecation in the country by October 2, 2019.
Expenditure on SBM-G: In 2018-19, Rs 15,343 crore has been allocated towards SBM-G. The central government allocation to SBM-G for the five year period from 2014-15 to 2018-19 has been estimated to be Rs 1,00,447 crore. Of this, up to 2018-19, Rs 52,166 crore (52%) has been allocated to the scheme. This implies that 48% of the funds are still left to be released before October 2019.
Construction of Individual Household Latrines (IHHLs): For construction of IHHLs, funds are shared between the centre and states in the 60:40 ratio. Construction of IHHLs account for the largest share of total expenditure under the scheme (97%-98%). Although the number of toilets constructed each year has increased, the pace of annual growth of constructing these toilets has come down. In 2015-16, the number of toilets constructed was 156% higher than the previous year. This could be due to the fact that 2015-16 was the first full year of implementation of the scheme. The growth in construction of new toilets reduced to 74% in 2016-17, and further to 4% in 2017-18.
As of February 2018, 78.8% of households in India had a toilet. This implies that 15 crore toilets have been constructed so far. However, four crore more toilets need to be construced in the next 20 months for the scheme to achieve its target by 2019.
Open Defecation Free (ODF) villages: Under SBM-G, a village is ODF when: (i) there are no visible faeces in the village, and (ii) every household as well as public/community institution uses safe technology options for faecal disposal. After a village declares itself ODF, states are required to carry out verification of the ODF status of such a village. This includes access to a toilet facility and its usage, and safe disposal of faecal matter through septic tanks. So far, out of all villages in the country, 72% have been verified as ODF. This implies that 28% villages are left to be verified as ODF for the scheme to achieve its target by 2019.
Information, Education and Communication (IEC) activities: As per the SBM-G guidelines, 8% of funds earmarked for SBM-G in a year should be utilised for IEC activities. These activities primarily aim to mobilise behavioural change towards the use of toilets among people. However, allocation towards this component has remained in the 1%-4% range. In 2017-18, Rs 229 crore is expected to be spent, amounting to 2% of total expenditure.
What is the implementation status of the National Rural Drinking Water Programme?
The National Rural Drinking Water Programme (NRDWP) aims at assisting states in providing adequate and safe drinking water to the rural population in the country. In 2018-19, the scheme has been allocated Rs 7,000 crore, accounting for 31% of the Ministry’s finances.
Coverage under the scheme: As of August 2017, 96% of rural habitations have access to safe drinking water. In 2011, the Ministry came out with a strategic plan for the period 2011-22. The plan identified certain standards for coverage of habitations with water supply, including targets for per day supply of drinking water. As of February 2018, 74% habitations are fully covered (receiving 55 litres per capita per day), and 22% habitations are partially covered (receiving less than 55 litres per capita per day). The Ministry aims to cover 90% rural households with piped water supply and 80% rural households with tap connections by 2022. The Estimates Committee of Parliament (2015) observed that piped water supply was available to only 47% of rural habitations, out of which only 15% had household tap connections.
Contamination of drinking water: It has been noted that NRDWP is over-dependant on ground water. However, ground water is contaminated in over 20 states. For instance, high arsenic contamination has been found in 68 districts of 10 states. These states are Haryana, Punjab, Uttar Pradesh, Bihar, Jharkhand, Chhattisgarh, West Bengal, Assam, Manipur, and Karnataka.
Chemical contamination of ground water has also been reported due to deeper drilling for drinking water sources. It has been recommended that out of the total funds for NRDWP, allocation for water quality monitoring and surveillance should not be less than 5%. Presently, it is 3% of the total funds. It has also been suggested that water quality laboratories for water testing should be set up throughout the country.