On November 28, 2012, the Comptroller and Auditor General submitted its report on the implementation of the Jawaharlal Nehru National Urban Renewal Mission (JNNURM).  According to the report most of the projects initiated under JNNURM have not been completed.  For instance with respect to urban infrastructure projects, only 231 projects out of the 1298 sanctioned projects have been completed.  Similarly, with respect to housing projects, only 22 of the 1517 projects have been completed.  Some of the other key recommendations of the report are:

  •  Some of the reasons for the delay in completing the projects include: (i) delay in acquiring land; (ii) deficiency in preparation of projects; and (iii) non-identification of beneficiaries which increased the risk of ineligible beneficiaries getting the benefits.
  •  A total allocation of Rs 66,084 crore had been made by the Planning Commission.  However, against this total allocation, the central government had made an allocation of only Rs 37,070 out of which until March 30, 2011 only Rs 32,934 had been released.
  • There was a delay in releasing these funds to the states.  A large portion of the funds was released only in the last quarter and more particularly in March.
  • The JNNURM guidelines were deficient as they did not provide adequate guidance to the states on the method of parking the funds and utilization of interest.

The need and objectives of JNNURM According to the 2011 census India’s urban population has increased from 286 million in 2001 to 377 million in 2011 .  With the increase in urban population, there is a requirement to improve the urban infrastructure and improve the service delivery mechanisms.  With these specific objectives in mind, the central government launched the Jawaharlal Nehru National Urban Renewal Mission 2005-2006.  The aim of the Mission is to encourage reforms and fast track planned development of identified cities (such as cities with a population of more than 1 million as per the 2001 census).  JNNURM has two main components namely : (i) Urban Infrastructure and Governance  and (ii) Urban Infrastructure Development for Small and Medium Towns. The duration of JNNURM was from 2005-06 to 2011-12. However, as the projects have not been completed the Government has extended its duration until March 2014. Funds for JNNURM The funds for JNNURM are provided through the Additional Central Assistance.  This implies that the funds are provided as grants to the states directly from the centre.   In the 2012 Union Budget, the central government has allocated Rs 12,522 crore for JNNURM. This represents around 10 % of the total central assistance through the different schemes to states and union territories in 2012-13. As on June 30 2012, 554 projects at a total cost of Rs 62,253 crore have been sanctioned under the Urban Infrastructure and Governance sub-mission of JNNURM.   The table below shows the status of the sanctioned JNNURM  projects in the different states. State wise status of the projects under JNNURM                 (as on August 6, 2012)

Name of State Total Allocation (Rs Lakh) Number of sanctioned projects Completed Projects
Andhra Pradesh 2,11,845 52 18
Arunachal Pradesh 10,740 3 NA
Assam 27,320 2 NA
Bihar 59,241 8 NA
Chandigarh 27,087 3 NA
Chattisgarh 24,803 1 NA
Delhi 2,82,318 23 4
Goa 12,094 2 NA
Gujarat 2,57,881 72 40
Haryana 32,332 4 NA
Himachal Pradesh 13,066 5 NA
Jammu & Kashmir 48,836 5 NA
Jharkhand 94,120 5 NA
Karnataka 1,52,459 47 22
Kerala 67,476 11 NA
Madhya Pradesh 1,32,850 23 7
Maharashtra 5,50,555 80 21
Manipur 15,287 3 NA
Meghalaya 15,668 2 NA
Mizoram 14,822 4 NA
Nagaland 11,628 3 NA
Orissa 32,235 5 NA
Punjab 70,775 6 1
Puducherry 20,680 2 NA
Rajasthan 74,869 13 2
Sikkim 10,613 2 NA
Tamil Nadu 2,25,066 48 12
Tripura 14,018 2 NA
Uttar Pradesh 2,76,941 33 4
Uttarakhand 40,534 14 NA
West Bengal 3,21,840 69 15

Source: Jawaharlal Nehru National Urban Renewal Mission; PRS.

  • Gujarat at 55.55% has the highest number of completed projects, while Uttar Pradesh at 12.24% has the lowest number of completed projects.
  • Out of the larger states, Delhi and Maharashtra at 17% and 26% have a comparatively low rate of completed projects.
  • Maharashtra has the highest number of sanctioned projects, while the North Eastern states, Chattisgarh and Puducherry have the lowest number of sanctioned projects.

On January 17, 2020, the Ministry of Health and Family Welfare acknowledged the emergence of COVID-19 that was spreading across China. On January 30, 2020, the country’s first COVID-19 positive case was reported in Kerala.  By March 11, 2020, the World Health Organisation declared COVID-19 as a global pandemic.  This blog summarises the key policy measures taken by government of Kerala to respond to the pandemic.  

As on April 22, Kerala has had 427 confirmed cases of COVID-19, of which 307 have recovered (highest rate of recovery in the country). Only three deaths have been recorded in the state so far.

 image

Pre-lockdown period: Early measures for containment

Following the first confirmed case involving a returnee from Wuhan, China, the initial responses by the state were aimed at surveilling, identifying, and conducting risk-based categorisation of all passenger arrivals from China and others who had come in close contact with these travellers. As two more cases were confirmed on February 2 and 3, the state government declared a health emergency in the state. 

Subsequently, a health advisory was issued to track, identify, and test all travellers with a travel history to Wuhan since January 15, 2020.  Such passengers and their close contacts were to be kept in isolation for 28 days.  The advisory also directed all lodging establishments to maintain a register of travellers with travel histories to corona-affected countries. A similar advisory was issued for student returnees as well. With no further confirmed cases being reported immediately, on February 12, the state withdrew the health emergency.  However, a high state of response and surveillance continued to be applied.

Second wave of infections

When a second wave of infections began spreading in early March, the government took several multi-pronged measures to address the threat. The following measures were taken in this regard:

  • Health measures: Revised guidelines for the clinical management of COVID19 patients, covering testing, quarantine, hospital admission, and discharge, were issued.  
     
  • Instructions were issued regarding airport safety protocols as well as testing of foreign nationals entering and exiting the state. All foreign arrivals, even if asymptomatic, were to be kept in isolation until their test reports were available. 
     
  • Further guidelines and precautions on social distancing and various hygiene norms, such as, use of sanitsers, were also issued to malls, shopping centres, and salons
     
  • Movement restrictions: All non-medical educational institutions, including anganwadis and madrassas were immediately shut down till March 31 and exams of classes 1-7 were postponed. Exams for classes 8 and above were to be held as scheduled. University exams were also postponed till March 31.
     
  • Government departments were asked to make temporary arrangements regarding working hours of their employees. Officials were also instructed to look into welfare measures for migrant workers.
     
  • Guidelines were also issued to private establishments regarding working time, safety measures, and leave for employees.
     
  • Administrative Measures: On March 17, COVID19 was declared a notified disaster, thus becoming eligible for funds from the State Disaster Response Fund (SDRF). SDRF is the primary fund available with state governments for responses to notified disasters. Notifying a disaster enables states to spend more from the SDRF to fight the said disaster.
     
  • In order to better coordinate the state’s response, the government issued instructions to constitute COVID-19 cells in all departments. Meetings and inspections by government officials were also to be avoided. 
     
  • Local Self Government institutions were assigned various roles and responsibilities. These include: (i) running awareness programs, such as, ‘Break the Chain’ initiative, (ii) conducting sanitation and cleanliness drives, (iii) regular outreach to home isolated/quarantined persons, (iv) activating committee system to manage responsibilities, (v) ensuring availability of essential commodities, (vi) categorising and ensuring available response mechanisms, such as, material resources, volunteers, medical resources etc, and (vii) ensuring special attention to vulnerable populations, such as senior citizens, and persons with co-morbidities or undergoing special treatments. 

The lockdown period

On March 23, Kerala announced a state-wide lockdown till March 31.  A day later, the central government announced a nation-wide 21-day lockdown.  

Restrictions imposed under the state’s order included: (i) stoppage of all forms of passenger transport services, (ii) prohibition of a gathering of more than five persons, and (iii) closure of all commercial establishments, officers, and factories, except those exempted.  Use of taxis, autos or private vehicles was permitted only for procurement of essential commodities or for medical emergencies. Establishments providing essential goods and services such as banks, media, telecom services, petrol bunks, and hospitals were permitted to operate.  

On April 15, the central government extended the lockdown till May 3.  Some of the key measures undertaken during the lockdown period are: 

Administrative Measures

  • A round-the-clock war room, comprising members of different departments, was set up to monitor and supervise all COVID-19 containment activities. 
     
  • Corona media cell was set up to monitor and tackle the threat of fake news surrounding COVID19.  
     
  • With the legislature not in session, the Kerala Epidemic Diseases Ordinance, 2020 was promulgated by the Governor of Kerala on March 26. The Ordinance empowers the state government to undertake necessary measures and specify regulations to counter the threat of an epidemic disease.  It also specifies a penalty for those who violate orders made under this Ordinance. 

Healthcare Measures

Essential Goods and Services

  • On March 25, the state declared a list of essential services under the Kerala Essential Services Maintenance Act, 1994. 
     
  • Various exemptions from lockdown were issued to services that were later deemed essential. These include: (i) shops and bakeries, including departmental stores, (ii) online food deliveries, (iii) parcel services, for delivery of essential goods, (iv) automobile service workshops, (v) shops and service centres for mobile phones, computers etc, only on Sundays, and (vi) plumbers and electricians to undertake maintenance work in houses and flats. 
     
  • On April 3, orders were issued to set up community kitchens under the aegis of Kudumbasree and Local Self Governments (LSGs). Kudumbasree is the poverty eradication and women empowerment programme implemented by the Kerala government. As on April 20, a total of 339 Community Kitchens have been functioning in 249 panchayats across 14 districts of the state. They have served a total of 5,91,687 meals since April 4, 2020. The government has also instructed LSGs to hire volunteers for the kitchen and pay them an honorarium of Rs. 400 (for one-time service) or Rs. 650 (for the whole-day).

Welfare Measures

  • Under SDRF norms, funds were released to the Health Department for relief and response activities for COVID-19. 
     
  • Each District Collector has been allocated Rs. 50 lakh for carrying out various COVID-19 outbreak-related control and prevention activities.
     
  • Financial assistance has been sanctioned to (i) fishermen, (ii) artists, (iii) lottery agents and sellers, and (iii) elephants and other such animals being looked after. 
     
  • A 2000-crore worth Chief Minister’s Helping Hand Loan Scheme was announced for people facing lockdown-related unemployment and hardships. The scheme will be operationalised through neighbourhood groups under the aegis of Kudumbasree. 

Post-lockdown strategies – Strategies easing lockdown relaxations

  • Expert Committee: On April 4, an Expert Committee was constituted by the government and on April 6, the Committee submitted its Report on the guidelines for post-lockdown regulations. It recommended a conditional, three-phase strategy, with districts being the unit of implementation. Relaxations would be progressively eased in each phase depending on criteria, such as, (i) number of new confirmed cases, (ii) percentage increase/decrease in number of persons under home surveillance, and (iii) no emergence of hotspots.. 
     
  • Containment Guidelines: After the lockdown was extended till May 3, the state released revised guidelines for containment, that recommended classification of districts into four zones, based on number of cases and disease threat. The zones – Red, Orange A, Orange B, and Green – would have different, graded restrictions, with Red having stringent restrictions in the form of a lockdown till May 3. The Orange A and B zones would have a lockdown till April 24 and 20 respectively, followed by a partial relaxation thereafter. Green zone would have a lockdown till April 20 and relaxation in restrictions thereafter.
     
  • Based on the above order, the state issued an advisory for industrial units to follow while resuming operations. Some of the Standard Operating Procedures to be followed include: (i) conducting disinfectation of premises, machinery, and vehicles, (ii) arranging exclusive transportation facilities with vehicles operating at 30-40% capacity, (iii) mandatory thermal scanning of people, (iv) following hygiene and social distancing norms, including a cap on elevator capacities and size of meetings (v) mandatory corona-related insurance cover for workers, (vi) mandatory use of CCTVs, and (vii) preparing a list of nearby COVID-19 hospitals .

For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.