Applications for the LAMP Fellowship 2025-26 will open soon. Sign up here to be notified when the dates are announced.
As of April 22, 2020, Sikkim does not have any confirmed cases of COVID-19. As of April 21, 2020, 87 samples have been sent for testing from Sikkim. Of these, 80 have tested negative for COVID-19, and the results of seven samples are awaited. The state has announced several policy decisions to prevent the spread of the virus and provide relief for those affected by it. In this blog post, we summarise some of the key measures taken by the Sikkim state government in this regard as of April 22, 2020.
Response before national lockdown
On March 16, the state government responded to the growing number of suspected cases in India by notifying certain directions to be applicable till April 15, 2020. These included: (i) banning the entry of all domestic and foreign tourists in to the state, (ii) closing all educational institutes and anganwadis, (iii) prohibiting the use of recreational facilities such as, casinos, gym, and cinemas, (iii) closing three out of five check posts (border opening) for all visitors in to the state and opening the other two only for medical and police teams, and (iv) banning private industries from getting migrant workers from outside the state and avoiding large concentration of workers at one place.
On March 19, assembly of more than five people was prohibited in the state until April 15, 2020. The government ordered the suspension of all non-essential work on March 19. The supply of all essential commodities such as food grains, vegetables, sanitisers and masks was allowed. Further, the formation of a sub-divisional task force to detect suspected cases was ordered.
On March 22, the government regulated intra-state movement of private vehicles, two-wheelers and taxis on an odd-even basis (allowing plying of vehicles on alternate days as per the number plate) until April 15, 2020. The government also reduced the budget session of the state to two days on March 23.
On March 25, the central government announced on a 21-day country-wide lockdown till April 14. During the lockdown the state government took various steps for physical containment, health, financial and welfare measures. These are detailed below.
Measures taken during lockdown
Movement Restrictions
Certain movement restrictions were put across the state. These include:
Essential Goods and Services
On April 5, the state government issued an order requiring establishments such as shops, hotels, private offices, and commercial establishments to remain closed until April 15. Establishments which were permitted to remain functional include law enforcement agencies, health services, electricity and water services, petrol pumps, and media. Shops for PDS, groceries, vegetables, milk and, medicines were only allowed remain open from 9 am to 4 pm.
Health Measures
On March 31, the Sikkim government identified and set up dedicated isolation wards and treatment centres in the STNM hospital, Sochakgang as a precautionary measure. The government also issued directions for citizens to avoid getting infected by coronavirus. These included social distancing, and maintaining proper hygiene.
On April 18, the state government made it mandatory for all the public, students, teachers, and government employees, to install the Aarogya Setu application. The government of India launched a mobile app called ‘Aarogya Setu’ to enable people to assess the risk of catching COVID-19 on April 2, 2020. The app uses Bluetooth and Global Positioning System (GPS) based device location for contact tracing in order to prevent the spread of COVID-19.
Welfare Measures
Certain relaxations after 20th April
On April 14, the nation-wide lockdown was further extended till May 3, 2020. On April 15, the Ministry of Home Affairs issued guidelines outlining select activities which will be permitted from April 20 onwards. These activities include health services, agriculture related activities, certain financial sector activities, operation of Anganwadis, MNREGA works, and cargo movement. Further, subject to certain conditions, commercial and private establishments, industrial establishments, government offices, and construction activities will also be permitted. The Sikkim government took the following steps in the same line.
For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.
On March 14, 2022 Rajya Sabha discussed the working of the Ministry of Development of North Eastern Region (DoNER). During the discussion, several issues around budgetary allocation, implementation of schemes and connectivity with the North Eastern Region were discussed. The Ministry of DoNER is responsible for matters relating to the planning, execution and monitoring of development schemes and projects in the North Eastern Region. In this blog post, we analyse the 2022-23 budgetary allocations for the Ministry and discuss related issues.
A new scheme named PM-DevINE announced to boost infrastructure and social development
In 2022-23, the Ministry has seen a 5% increase in allocation from the revised estimates of 2021-22. The Ministry has been allocated Rs 2,800 crore which will be used for various development schemes, such as the North East Special Infrastructure Development Scheme and North East Road Sector Development Scheme. A scheme-wise break-up of the budget allocation for the Ministry is given below in Table 1.
One of the key highlights of the Finance Minister’s Budget Speech was the announcement of a new scheme named the Prime Minister’s Development Initiative for North East (PM-DevINE). It will be implemented through the North East Council (nodal agency for the economic and social development of the North Eastern Region). PM-DevINE will fund infrastructure and social development projects in areas such as road connectivity, health, and agriculture. The scheme will not replace or subsume existing central sector or centrally sponsored schemes. The Scheme will be given an initial allocation of Rs 1,500 crore.
Table 1: Break-up of allocation to the Ministry of DoNER (in Rs crore)
Major Heads |
2020-21 Actuals |
2021-22 BE |
2021-22 RE |
2022-23 BE |
% change from 2021-22 RE to 2022-23 BE |
North East Special Infrastructure Development Scheme |
446 |
675 |
674 |
1,419 |
111% |
Schemes of North East Council |
567 |
585 |
585 |
702 |
20% |
North East Road Sector Development Scheme |
416 |
696 |
674 |
496 |
-26% |
Central pool of resources for North East and Sikkim |
342 |
581 |
581 |
- |
- |
Others |
270 |
322 |
344 |
241 |
-30% |
Total |
1,854 |
2,658 |
2,658 |
2,800 |
5% |
Note: BE – Budget Estimate; RE – Revised Estimate; Schemes for North East Council includes Special Development Projects.
Sources: Demand No. 23 of Union Budget Documents 2022-23; PRS.
Allocation towards capital outlay less than demand
The Standing Committee on Home Affairs (2022) noted that the amount allocated at the budget stage in 2022-23 (Rs 660 crore) was 17% less than the demand by the Ministry (Rs 794 crore). Capital expenditure includes capital outlay which leads to the creation of assets such as schools, hospitals, and roads and bridges. The Committee observed that this may severely affect the implementation of several projects and schemes that require capital outlay. It recommended the Ministry to take up this matter with the Finance Ministry and demand additional assistance at the revised stage of the 2022-23 financial year.
Underutilisation of funds over the years
Since 2011-12 (barring 2016-17), the Ministry has not been able to utilise the funds allocated to it at the budgeted stage (See Figure 1). For instance, in 2020-21, fund utilisation in case of the North East Road Sector Development Scheme was 52%, whereas only 34% of funds were utilised under the North East Special Infrastructure Development Scheme (for infrastructure projects relating to water supply, power, connectivity, social infrastructure). Key reasons for underspending highlighted by the Ministry include late receipt of project proposals and non-receipt of utilisation certificates from state governments.
Figure 1: Underutilisation of funds by the Ministry since 2011-12
Note: Revised Estimate has been used as the Actual Expenditure for 2021-22.
Sources: Union Budget Documents (2011-12 to 2022-23); PRS.
Delay in project completion
The Ministry implements several schemes for infrastructural projects such as roads and bridges. The progress of the certain schemes has been inadequate. The Standing Committee (2022) observed that the physical progress of many road sector projects under the North East Road Sector Development Scheme is either at zero or in single digit percent in spite of release of the amount for the project. Similarly, projects under the Karbi Anglong Autonomous Territorial Council (autonomous district council in Assam) and Social and Infrastructure Development Fund (construction of roads, bridges, and construction of schools and water supply projects in the North Eastern Region) have seen inadequate progress.
Need to address declining forest cover
The Standing Committee (2021) has also recommended the Ministry of DoNER to work towards preserving forest cover. The Committee took note of the declining forest cover in the North East India. As per the India State of Forest Report (2021), states showing major loss of forest cover from 2019 to 2021 are: (i) Arunachal Pradesh (loss of 257 sq km of forest cover), (ii) Manipur (249 sq km), (iii) Nagaland (235 sq km), (iv) Mizoram (186 sq km), and (v) Meghalaya (73 sq km). The loss of forest cover may be attributed to shifting cultivation, cutting down of trees, natural calamities, anthropogenic (environmental pollution) pressure, and developmental activities. The Committee recommended that various measures to protect the forest and environment must be given priority and should implemented within the stipulated timeline. It also suggested the Ministry to: (i) carry out regular plantation drives to increase forest cover/density, and (ii) accord priority towards the ultimate goal of preserving and protecting the forests under various centrally sponsored initiatives.
Key issues raised by Members during discussion in Rajya Sabha
The discussion on the working of the Ministry of DoNER took place in Rajya Sabha on March 14, 2022. One of the issues highlighted by members was about the Ministry not having its own line Department. This leads to the Ministry being dependent on the administrative strength of the states for implementation of projects. Another issue highlighted by several members was the lack of connectivity of the region through railways and road networks which hampers the economic growth of region. The DoNER Minister in his response to the House assured the members that the central government is making continuous efforts towards improving connectivity to the North East region through roads, railways, waterways, and telecommunication.
Allocation by Union Ministries to the North East
Union Ministries allocate 10% of their budget allocation for the North East (See Figure 2 for fund allocation and utilisation). The Ministry of DoNER is the nodal Ministry that monitors and keeps track of the allocation done by various Ministries. In 2022-23, Rs 76,040 crore has been allocated by all the Ministries for the North Eastern region. The allocation has increased by 11% from the revised estimate of 2021-22 (Rs 68,440 crore). In 2019-20 and 2021-21 the actual expenditure towards North Eastern areas was lower than budget estimates by 18% and 19% respectively.
Figure 2: Budgetary allocation by all Union Ministries for the North East (amount in Rs crore)
Source: Report No. 239: Demand for Grants (2022-23) of Ministry of Development of North Eastern Region, Standing Committee on Home Affairs; PRS.