Safety has been one of the biggest concerns in the Indian Railways system. While the number of accidents have gone down over the last few years, the number still remains over 100 accidents a year. In light of the recent train accidents in Uttar Pradesh (UP), we present some details around accidents and safety in the Indian Railways.
Causes of rail accidents
The number of rail accidents has declined from 325 in 2003-04 to 106 in 2015-16.[1] The number of rail accidents as per the cause are shown in the graph below. In 2015-16, majority of the accidents were caused due to derailments (60%), followed by accidents at level crossings (33%).1 In the last decade, accidents caused due to both these causes have reduced by about half. According to news reports, the recent railway accidents in UP were caused due to derailment of coaches.
Derailments
Between 2003-04 and 2015-16, derailments were the second highest reason for casualties.2 The Standing Committee on Railways, when examining the safety in railways, had noted that one of the reasons for derailments is defect in the track or coaches. Of the total track length of 1,14,907 kms in the country, 4,500 kms should be renewed annually.2 However, in 2015-16, of the 5,000 km of track length due for renewal, only 2,700 km was targeted to be renewed.2 The Committee had recommended that Indian Railways should switch completely to the Linke Hoffman Busch (LHB) coaches as they do not pile upon each other during derailments and hence cause lesser casualties.2
Un-manned level crossings
Un-manned level crossings (UMLCs) continue to be the biggest cause of casualties in rail accidents. Currently there are 14,440 UMLCs in the railway network. In 2014-15, about 40% of the accidents occurred at UMLCs, and in 2015-16, about 28%.2 Between 2010 and 2013, the Ministry fell short of meeting their annual targets to eliminate UMLCs. Further, the target of eliminating 1,352 UMLCs was reduced by about 50% to 730 in 2014-15, and 820 in 2015-16.2 Implementation of audio-visual warnings at level crossings has been recommended to warn road users about approaching trains.2 These may include Approaching Train Warning Systems, and Train Actuated Warning Systems.2 The Union Budget 2017-18 proposes to eliminate all unmanned level crossings on broad gauge lines by 2020.
Casualties and compensation
In the last few years, Railways has paid an average compensation of Rs 3.03 crore every year for accidents (see figure below).[2]
Note: Compensation paid during a year relates to the cases settled and not to accidents/casualties during that year.
Consequential train accidents
Accidents in railways may or may not have a significant impact on the overall system. Consequential train accidents are those which have serious repercussions in terms of loss of human life or injury, damage to railway property or interruption to rail traffic. These include collisions, derailments, fire in trains, and similar accidents that have serious repercussions in terms of casualties and damage to property. These exclude cases of trespassing at unmanned railway crossings.
As seen in the figure below, the share of failure of railways staff is the biggest cause of consequential rail accidents. The number of rail accidents due to failure of reasons other than the railway staff (sabotage) has increased in the last few years.
Accidents due to failure of railway staff
It has been noted that more than half of the accidents are due to lapses on the part of railway staff.2 Such lapses include carelessness in working, poor maintenance, adoption of short-cuts, and non-observance of laid down safety rules and procedures. To address these issues, conducting a regular refresher course for each category of railway staff has been recommended.2
Accidents due to loco-pilots2,[3]
Accidents also occur due to signalling errors for which loco-pilots (train-operators) are responsible. With rail traffic increasing, loco-pilots encounter a signal every few kilometres and have to constantly be on high alert. Further, currently no technological support is available to the loco-pilots and they have to keep a vigilant watch on the signal and control the train accordingly.2 These Loco-pilots are over-worked as they have to be on duty beyond their stipulated working hours. This work stress and fatigue puts the life of thousands of commuters at risk and affects the safety of train operations.2 It has been recommended that loco-pilots and other related running staff should be provided with sound working conditions, better medical facilities and other amenities to improve their performance.2
Actions taken by Railways with regard to the recent train accident
According to news reports, the recent accident of Utkal Express in UP resulted in 22 casualties and over 150 injuries.[4] It has also been reported that following this incident, the Railways Ministry initiated action against certain officials (including a senior divisional engineer), and three senior officers (including a General Manager and a Railway Board Member).
The Committee on Restructuring of Railways had noted that currently each Railway zone (headed by a General Manager) is responsible for operation, management, and development of the railway system under its jurisdiction.[5] However, the power to make financial decisions does not rest with the zones and hence they do not possess enough autonomy to generate their own revenue, or take independent decisions.5
While the zones prepare their annual budget, the Railway Board provides the annual financial budget outlay for each of them. As a result of such budgetary control, the GM’s powers have been reduced leaving them with little independence in planning their operations.5
The Committee recommended that the General Managers must be fully empowered to take all necessary decisions independent of the Railway Board.5 Zonal Railways should also have full power for expenditure and re-appropriations and sanctions. This will make each Zonal Railway accountable for its transport output, profitability and safety under its jurisdiction.
Under-investment in railways leading to accidents
In 2012, a Committee headed by Mr. Anil Kakodkar had estimated that the total financial cost of implementing safety measures over the five-year period (2012-17) was likely be around Rs one lakh crore. In the Union Budget 2017-18, the creation of a Rashtriya Rail Sanraksha Kosh was proposed for passenger safety. It will have a corpus of Rs one lakh crore, which will be built over a five-year period (Rs 20,000 crore per year).
The Standing Committee on Railways had noted that slow expansion of rail network has put undue burden on the existing infrastructure leading to severe congestion and safety compromises.2 Since independence, while the rail network has increased by 23%, passenger and freight traffic over this network has increased by 1,344% and 1,642% respectively.2 This suggests that railway lines are severely congested. Further, under-investment in the sector has resulted in congested routes, inability to add new trains, reduction of train speeds, and more rail accidents.2 Therefore, avoiding such accidents in the future would also require significant investments towards capital and maintenance of rail infrastructure.2
Tags: railways, safety, accidents, finances, derailment, casualty, passengers, train
[1] Railways Year Book 2015-16, Ministry of Railways, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/stat_econ/IRSP_2015-16/Year_Book_Eng/8.pdf.
[2] “12th Report: Safety and security in Railways”, Standing Committee on Railways, December 14, 2016, http://164.100.47.193/lsscommittee/Railways/16_Railways_12.pdf.
[3] Report of High Level Safety Review Committee, Ministry of Railways, February 17, 2012.
[4] “Utkal Express derailment: Four railway officials suspended as death toll rises to 22”, The Indian Express, August 20, 2017, http://indianexpress.com/article/india/utkal-express-train-derailment-four-railway-officers-suspended-suresh-prabhu-muzaffarnagar-22-dead-4805532/.
[5] Report of the Committee for Mobilization of Resources for Major Railway Projects and Restructuring of Railway Ministry and Railway Board, Ministry of Railways, June 2015, http://www.indianrailways.gov.in/railwayboard/uploads/directorate/HLSRC/FINAL_FILE_Final.pdf.
Last week, the Power Finance Corporation reported that state-owned power distribution companies across the country made financial losses amounting to Rs 68,832 crore in 2022-23. This is four times higher than the losses witnessed in 2021-22, and roughly equivalent to the annual budget of a state like Uttarakhand. This blog examines some of the causes and implications of such losses.
Overview of financial losses
For several years now, electricity distribution companies (discoms), which are mostly state-owned, have witnessed steep financial losses. Between 2017-18 and 2022-23, losses accumulated to over three lakh crore rupees. In 2021-22, discom witnessed substantial reduction in their losses, primarily because states released 1.54 lakh rupees in subsidies to clear pending dues. State governments provide discoms with subsidies, so that domestic and agricultural consumers receive affordable power. These payments are typically delayed which creates cash flow constraints, and leads to an accumulation of debt. In addition, costs incurred by discoms in 2021-22 remained unchanged.
Note: Data from 2020-21 onwards does not include Odisha, and Dadra & Nagar Haveli and Daman and Diu since their distribution function was privatised in 2020-21. Data for Ladakh is available from 2021-22 onwards. Data for Jammu and Kashmir is not available. The Delhi Municipal Council Distribution Utility has been included from 2020-21 onwards.
Sources: Power Finance Corporation reports for various years; PRS.
As of 2022-23, losses have increased again to reach Rs 68,832 crore. This increase has been driven by rising costs. At a per unit level, the cost of supplying one kilowatt of electricity rose from 7.6 rupees in 2021-22, to 8.6 rupees in 2022-23 (See Table 1).
Table 1: Financial details of state-owned power distribution companies
Details |
2019-20 |
2020-21 |
2021-22 |
2022-23 |
Average cost of supplying power (ACS) |
7.4 |
7.7 |
7.6 |
8.6 |
Average revenue realised (ARR) |
6.8 |
7.1 |
7.3 |
7.8 |
Per unit loss (ACS-ARR) |
0.6 |
0.6 |
0.3 |
0.7 |
Total losses (in Rs crore) |
-60,231 |
-76,899 |
-16,579 |
-68,832 |
Note: Data from 2020-21 onwards does not include Odisha, and Dadra & Nagar Haveli and Daman and Diu since their distribution function was privatised in 2020-21. Data for Ladakh is available from 2021-22 onwards. Data for Jammu and Kashmir is not available. The Delhi Municipal Council Distribution Utility has been included from 2020-21 onwards.
Sources: Power Finance Corporation reports for various years; PRS.
Purchase of electricity from generation companies (gencos) forms about 70% of a discom’s total costs, and coal is the primary source for generating electricity. The following chain of events took place in 2022-23: (i) consumer demand for electricity rose by 10% over the previous year, as compared to a 6% year-on-year increase in the past 10 years, (ii) coal had to be imported to meet the increased demand, and (iii) global coal prices were elevated.
Coal imported at elevated prices to keep up with rising electricity demand
In 2022-23, demand for electricity increased by 10% over 2021-22. Between 2008-09 and 2018-19, demand increased at an annual growth rate (CAGR) of 6%. Electricity demand grew as the economy grew (at 7%), and largely came from domestic and agricultural consumers. These consumer categories account for 54% of the total electricity sales, and their demand rose by 7%.
Sources: Central Electricity Regulatory Commission; PRS.
Electricity cannot be stored at scale, which means that generation must be scheduled depending on anticipated demand. The Central Electricity Authority anticipates annual demand for each year. It estimated that demand in 2022-23 would be at 1,505 billion units. However, the actual demand was higher than anticipated in the first few months of 2022-23 (See Figure 3).
To meet this demand, electricity generation had to be ramped up. Coal stocks had already depleted from 29 million tonnes in June 2021 to eight million tonnes in September 2021, on account of high demand in 2021-22. To ensure uninterrupted supply of power, the Ministry of Power directed gencos to import coal. The Ministry noted that without imports, widespread power cuts and blackouts would have occurred.
Sources: Load Generation Balance Report 2022 and 2023, Central Electricity Authority; PRS.
Coal imports rose by about 27 million tonnes in 2022-23. While this constituted only 5% of the overall coal used in the sector, the price at which it was imported significantly impacted the sector. In 2021-22, India imported coal at an average price of Rs 8,300 per tonne. This rose to Rs 12,500 per tonne in 2022-23, a 51% increase. Coal was primarily imported from Indonesia, and prices shot up due to the Russia-Ukraine war, and demand surge by countries like India and China.
Sources: Ministry of Power; Ministry of Statistics and Programme Implementation; PRS.
Coal import situation going forward
In January 2023, the Ministry of Power advised gencos to import 6% of the required coal, to ensure sufficient stock until September 2023. It noted that due to floods and variable rainfall in various parts of the country, hydro generation capacity reduced by about 14%. This put additional burden on coal based thermal generation in 2023-24. Following this, in October 2023, the Ministry directed all gencos to continue using at least 6% imported coal until March 2024.
Sources: Ministry of Coal; PRS.
Structural issues in the power sector and its impact on state finances
Discoms witness persistent financial losses due to certain structural issues. Their costs are typically high because of old contracts with generation companies (gencos). Power purchase costs in these contracts do not account for production efficiencies over the years, and costs remain unchanged. Tariffs are only revised every few years, to ensure that consumers are protected from supply chain shocks. As a result, costs are carried forward for a few years. In addition, discoms sell electricity to certain consumers such as agricultural and residential consumers, below cost. This is supposed to primarily be recovered through subsidy grants provided by state governments. However, states often delay subsidy payments leading to cash flow issues, and accumulation of debt. In addition, tariff recovery from the power sold is not optimal.
Losses reported in the generation sector have also increased. In 2022-23, state-owned gencos reported losses worth Rs 7,175 crore, as compared to the Rs 4,245 crore in 2021-22. Rajasthan accounted for 87% of these, at Rs 6,278 crore. Note that under the Late Payment Surcharge Rules, 2022, discoms are required to make upfront payments to gencos.
Risk to state finances
Persistent financial losses, high debt and guarantees extended by states continue to pose a risk to state finances. These are contingent liabilities for state governments, i.e., in the event a discom is unable to repay its debt, the state would have to take it over.
Several such schemes have been introduced in the past to bail discoms out (See Table 2). As of 2022-23, discoms have an outstanding debt worth Rs 6.61 lakh crore, 2.4% of the national GDP. Debt is significantly high in states such as Tamil Nadu (6% of GSDP), Rajasthan (6% of GSDP), and Uttar Pradesh (3% of GSDP). Previous Finance Commissions have recognised that strengthening discom finances is key in minimising the risk to state finances.
Table 2: Key government schemes for the turnaround of the distribution sector over the years
Year |
Scheme |
Details |
2002 |
Bailout Package |
States take over the debt of state electricity boards worth Rs 35,000 crore, 50% waiver of interest payable by state electricity boards to central PSUs |
2012 |
Financial Restructuring Package |
States take over 50% of the outstanding short-term liabilities worth Rs 56,908 crore |
2015 |
Ujwal Discom Assurance Yojana (UDAY) |
States take over 75% of the debt of discoms worth Rs 2.3 lakh crore and also provide grants for any future losses |
2020 |
Liquidity Infusion Scheme |
Discoms get loans worth Rs 1.35 lakh crore from Power Finance Corporation and REC Limited to settle outstanding dues of generators, state governments provide guarantee |
2022 |
Revamped Distribution Sector Scheme |
Central government to provide result-linked financial assistance worth Rs 97,631 crore for strengthening of supply infrastructure |
Sources: NITI Aayog, Press Releases of the Ministry of Power; PRS.
For more details on the impact of discom finances on state finances, see here. For more details on structural issues in the power distribution sector, see here.
ANNEXURE
Table 3: Cost and revenue structure of discoms on energy sold basis (in Rs per kw)
Details |
2019-20 |
2020-21 |
2021-22 |
2022-23 |
Average cost of supplying power (ACS) |
7.4 |
7.7 |
7.6 |
8.6 |
of which |
||||
Cost of procuring power |
5.8 |
5.9 |
5.8 |
6.6 |
Average revenue realised (ARR) |
6.8 |
7.1 |
7.3 |
7.8 |
of which |
||||
Revenue from sale of power |
5.0 |
4.9 |
5.1 |
5.5 |
Tariff subsidy |
1.3 |
1.4 |
1.4 |
1.5 |
Regulatory income and revenue grant under UDAY |
0.3 |
0.1 |
0.0 |
0.2 |
Per unit loss |
0.6 |
0.6 |
0.3 |
0.7 |
Total financial losses |
-60,231 |
-76,899 |
-16,579 |
-68,832 |
Sources: Power Finance Corporation reports for various years; PRS.
Table 4: State-wise profit/loss of power distribution companies (in Rs crore)
State/UT |
2017-18 |
2018-19 |
2019-20 |
2020-21 |
2021-22 |
2022-23 |
Andaman and Nicobar Islands |
-605 |
-645 |
-678 |
-757 |
-86 |
-76 |
Andhra Pradesh |
-546 |
-16,831 |
1,103 |
-6,894 |
-2,595 |
1,211 |
Arunachal Pradesh |
-429 |
-420 |
NA |
NA |
NA |
NA |
Assam |
-259 |
311 |
1,141 |
-107 |
357 |
-800 |
Bihar |
-1,872 |
-1,845 |
-2,913 |
-2,966 |
-2,546 |
-10 |
Chandigarh |
321 |
131 |
59 |
79 |
-101 |
NA |
Chhattisgarh |
-739 |
-814 |
-571 |
-713 |
-807 |
-1,015 |
Dadra & Nagar Haveli and Daman & Diu |
312 |
-149 |
-125 |
NA |
NA |
NA |
Delhi |
NA |
NA |
NA |
98 |
57 |
-141 |
Goa |
26 |
-121 |
-276 |
78 |
117 |
69 |
Gujarat |
426 |
184 |
314 |
429 |
371 |
147 |
Haryana |
412 |
281 |
331 |
637 |
849 |
975 |
Himachal Pradesh |
-44 |
132 |
43 |
-153 |
-141 |
-1,340 |
Jharkhand |
-212 |
-730 |
-1,111 |
-2,556 |
-1,721 |
-3,545 |
Karnataka |
-2,439 |
-4,889 |
-2,501 |
-5,382 |
4,719 |
-2,414 |
Kerala |
-784 |
-135 |
-270 |
-483 |
98 |
-1,022 |
Ladakh |
NA |
NA |
NA |
NA |
-11 |
-57 |
Lakshadweep |
-98 |
-120 |
-115 |
-117 |
NA |
NA |
Madhya Pradesh |
-5,802 |
-9,713 |
-5,034 |
-9,884 |
-2,354 |
1,842 |
Maharashtra |
-3,927 |
2,549 |
-5,011 |
-7,129 |
-1,147 |
-19,846 |
Manipur |
-8 |
-42 |
-15 |
-15 |
-22 |
-146 |
Meghalaya |
-287 |
-202 |
-443 |
-101 |
-157 |
-193 |
Mizoram |
87 |
-260 |
-291 |
-115 |
-59 |
-158 |
Nagaland |
-62 |
-94 |
-477 |
-17 |
24 |
33 |
Puducherry |
5 |
-39 |
-306 |
-23 |
84 |
-131 |
Punjab |
-2,760 |
363 |
-975 |
49 |
1,680 |
-1,375 |
Rajasthan |
-11,314 |
-12,524 |
-12,277 |
-5,994 |
2,374 |
-2,024 |
Sikkim |
-29 |
-3 |
-179 |
-34 |
NA |
71 |
Tamil Nadu |
-12,541 |
-17,186 |
-16,528 |
-13,066 |
-9,130 |
-9,192 |
Telangana |
-6,697 |
-9,525 |
-6,966 |
-6,686 |
-831 |
-11,103 |
Tripura |
28 |
38 |
-104 |
-4 |
-127 |
-193 |
Uttar Pradesh |
-5,269 |
-5,902 |
-3,866 |
-10,660 |
-6,498 |
-15,512 |
Uttarakhand |
-229 |
-808 |
-323 |
-152 |
-21 |
-1,224 |
West Bengal |
-871 |
-1,171 |
-1,867 |
-4,261 |
1,045 |
-1,663 |
State Sector |
-56,206 |
-80,179 |
-60,231 |
-76,899 |
-16,579 |
-68,832 |
Dadra & Nagar Haveli and Daman & Diu |
NA |
NA |
NA |
242 |
148 |
104 |
Delhi |
109 |
657 |
-975 |
1,876 |
521 |
-76 |
Gujarat |
574 |
307 |
612 |
655 |
522 |
627 |
Odisha |
NA |
NA |
-842 |
-853 |
940 |
746 |
Maharashtra |
NA |
590 |
1,696 |
-375 |
360 |
42 |
Uttar Pradesh |
182 |
126 |
172 |
333 |
256 |
212 |
West Bengal |
658 |
377 |
379 |
398 |
66 |
-12 |
Private Sector |
1,523 |
2,057 |
1,042 |
2,276 |
2,813 |
1,643 |
All-India |
-54,683 |
-78,122 |
-59,189 |
-77,896 |
-13,766 |
-67,189 |
Note: Minus sign (-) indicates loss; Dadra & Nagar Haveli and Daman & Diu discom was privatised on April 1, 2022; New Delhi Municipal Council Distribution utility has been added from 2020-21 onwards.
Sources: Power Finance Corporation reports for various years; PRS.