Applications for the LAMP Fellowship 2025-26 will open on December 1, 2024. Sign up here to be notified when applications open.

The shortage of skilled man-power is a cause for concern in most sectors in India.  Experts acknowledge that the present higher education system in India is not equipped to address this problem without some changes in the basic structure.  Official records show that the gross enrollment ratio in higher education is only 11 per cent while the National Knowledge Commission says only seven per cent of the population between the age group of 18-24 enters higher education.  Even those who have access are not ensured of quality.  Despite having over 300 universities, not a single Indian university is listed in the top 100 universities of the world. Present Regulatory framework The present system of higher education is governed by the University Grants Commission (UGC), which is the apex body responsible for coordination, determination and maintenance of standards, and release of grants.   Various professional councils are responsible for recognition of courses, promotion of professional institutions and providing grants to undergraduate programmes.  Some of the prominent councils include All India Council for Technical Education (AICTE), Medical Council of India (MCI) and the Bar Council of India (BCI).  The Central Advisory Board of Education coordinates between the centre and the states. Universities in India can be established by an Act of Parliament or state legislatures such as Delhi University, Calcutta University and Himachal Pradesh University.  Both government-aided and unaided colleges are affiliated with a university.  The central government can also declare an institution to be a deemed university based on recommendation of the University Grants Commission.  There are about 130 deemed universities and includes universities such as Indian Institute of Foreign Trade and Birla Institute of Technology.  Such universities are allowed to set their own syllabus, admission criteria and fees.  Some prominent institutions are also classified as institutions of national importance. Reforms in Higher Education There have been calls to revamp the regulatory structure, make efforts to attract talented faculty, and increase spending on education from about 4% of the Gross Domestic Product (GDP) to about 6%. Presently, the allocation for higher education is at a measly 0.7% of GDP. From time to time government appointed various expert bodies to suggest reforms in the education sector.  The two most recent recommendations were made by the National Knowledge Commission (NKC) formed in 2005 under the chairmanship of Mr Sam Pitroda and the Committee to Advise on Renovation and Rejuvenation of Higher Education, formed in 2008 under the chairmanship of Shri Yashpal.

Key Recommendations of NKC Key Recommendations of Yashpal Committee
  • Presently, India has about 350 universities.  Around 1,500 universities should be opened nationwide so that India is able to attain a gross enrolment ratio of at least 15% by 2015.
  • Existing universities should be reformed through revision of curricula at least once in three years, supplementing annual examination with internal assessment, transition to a course credit system, attract talented faculty by improving working conditions and incentives.
  • A Central Board of Undergraduate Education should be established, along with State Boards of Undergraduate Education, which would set curricula and conduct examinations for undergraduate colleges that choose to be affiliated with them.
  • An Independent Regulatory Authority for Higher Education (IRAHE) should be formed.  IRAHE should be independent of all stakeholders and be established by an Act of Parliament.
  • The UGC would focus on disbursement of grants and maintaining public institutions of higher learning.  The regulatory function of the AICTE, MCI, and BCI would be performed by IRAHE.
  • The IRAHE shall have the power to set and monitor standards, accord degree-granting power to institutions of higher education, license accreditation agencies, and settle disputes.  Same norms shall apply to all institutions irrespective of whether they are public or private, domestic or international.
  • Quality of education can be enhanced by stringent information disclosure norms, evaluation of courses by teachers and students, rethinking the issue of salary differentials within and between universities to retain talented faculty, formulating policies for entry of foreign institutions in India and the promotion of Indian institutions abroad.
  • The academic functions of all the professional bodies (such as UGC, AICTE, MCI, and BCI) should be subsumed under an apex body for higher education called the National Commission for Higher Education and Research (NCHER), formed through Constitutional amendment.
  • The professional bodies should be divested of their academic functions.  They should only be looking after the fitness of the people who wish to practice in their respective fields by conducting regular qualifying examination.
  • Establish a National Education Tribunal with powers to adjudicate on disputes among stake-holders within institutions and between institutions so as to reduce litigation in courts involving universities and higher education institutions.
  • Curricular reform should be the top-most priority of the NCHER.  It should be based on the principles of mobility within a full range of curricular areas.
  • Vocational education sector should be brought within the purview of universities.
  • NCHER should promote research in the university system through the creation of a National Research Foundation.
  • Practice of according status of deemed university be stopped till the NCHER takes a considered view on it.
  • NCHER should identify the best 1500 colleges across India and upgrade them as universities.
  • A national testing scheme for admission to the universities on the pattern of the GRE to be evolved which would be open to all the aspirants of University education, to be held more than once a year.
  • Quantum of central financial support to state-funded universities should be enhanced substantially on an incentive pattern.
Sources: The Report to the Nation, 2006-09, NKC; Yashpal Committee Report, 2009; PRS

The Draft NCHER Bill, 2010 In response to the reports, the government drafted a Bill on higher education and put it in the public domain.  The draft National Commission for Higher Education and Research Bill, 2010 seeks to establish the National Commission for Higher Education and Research whose members shall be appointed by the President on the recommendation of the selection committee (include Prime Minister, Leader of the Opposition in Lok Sabha, Speaker). The Commission shall take measures to promote autonomy of higher education and for facilitating access, inclusion and opportunities to all.  It may specify norms for grant of authorisation to a university, develop a national curriculum framework, specify requirement of academic quality for awarding a degree, specify minimum eligibility conditions for appointment of Vice Chancellors, maintain a national registry, and encourage universities to become self regulatory.  Vice Chancellors shall be appointed on the recommendation of a collegium of eminent personalities.  The national registry shall be maintained with the names of persons eligible for appointment as Vice Chancellor or head of institution of national importance.  Any person can appeal a decision of the Commission to the National Educational Tribunal. (For opinions by some experts on the Bill, click here and here.) Other Bills that are in the pipeline include The Foreign Educational Institutions (Regulation of Entry and Operation) Bill, 2010; the Central Educational Institutions (Reservation in Admission) (Amendment) Bill, 2010; and the Innovation Universities Bill, 2010.

The central government has enforced a nation-wide lockdown between March 25 and May 3 as part of its measures to contain the spread of COVID-19.  During the lockdown, several restrictions have been placed on the movement of individuals and economic activities have come to a halt barring the activities related to essential goods and services. The restrictions are being relaxed in less affected areas in a limited manner since April 20.  In this blog, we look at how the lockdown has impacted the demand and supply of electricity and what possible repercussions its prolonged effect may have on the power sector. 

Power supply saw a decrease of 25% during the lockdown (year-on-year)

As electricity cannot be stored in large amount, the power generation and supply for a given day are planned based on the forecast for demand.  The months of January and February in 2020 had seen an increase of 3% and 7% in power supply, respectively as compared to 2019 (year-on-year).  In comparison, the power supply saw a decrease of 3% between March 1 and March 24.  During the lockdown between March 24 and April 19, the total power supply saw a decrease of about 25% (year-on-year).

Figure 1: % change in power supply position between March 1 and April 19 (Y-o-Y from 2019 to 2020)

Sources: Daily Reports; POSOCO; PRS.

If we look at the consumption pattern by consumer category, in 2018-19, 41% of total electricity consumption was for industrial purposes, followed by 25% for domestic and 18% for agricultural purposes.  As the lockdown has severely reduced the industrial and commercial activities in the country, these segments would have seen a considerable decline in demand for electricity. However, note that the domestic demand may have seen an uptick as people are staying indoors.

Figure 2: Power consumption by consumer segment in 2018-19

Sources: Central Electricity Authority; PRS.

Electricity demand may continue to be subdued over the next few months. At this point, it is unclear that when lockdown restrictions are eased, how soon will economic activities return to pre COVID-19 levels. India’s growth projections also highlight a slowdown in the economy in 2020 which will further impact the demand for electricity.  On April 16, the International Monetary Fund has slashed its projection for India’s GDP growth in 2020 from 5.8% to 1.9%.

A nominal increase in energy and peak deficit levels

As power sector related operations have been classified as essential services, the plant operations and availability of fuel (primarily coal) have not been significantly constrained. This can be observed with the energy deficit and peak deficit levels during the lockdown period which have remained at a nominal level.  Energy deficit indicates the shortfall in energy supply against the demand during the day.  The average energy deficit between March 25 and April 19 has been 0.42% while the corresponding figure was 0.33% between March 1 and March 24. Similarly, the average peak deficit between March 25 and April 19 has been 0.56% as compared to 0.41% between March 1 and March 24.  Peak deficit indicates the shortfall in supply against demand during highest consumption period in a day.

Figure 3: Energy deficit and peak deficit between March 1, 2020 and April 19, 2020 (in %)

Sources: Daily Reports; POSOCO; PRS.

Coal stock with power plants increases

Coal is the primary source of power generation in the country (~71% in March 2020).  During the lockdown period, the coal stock with coal power plants has seen an increase.  As of April 19, total coal-stock with the power plants in the country (in days) has risen to 29 days as compared to 24 days on March 24. This indicates that the supply of coal has not been constrained during the lockdown, at least to the extent of meeting the requirements of power plants.

Energy mix changes during the lockdown, power generation from coal impacted

During the lockdown, power generation has been adjusted to compensate for reduced consumption, Most of this reduction in consumption has been adjusted by reduced coal power generation. As can be seen in Table 1, coal power generation reduced from an average of 2,511 MU between March 1 and March 24 to 1,873 MU between March 25 and April 19 (about 25%).  As a result, the contribution of coal in total power generation reduced from an average of 72.5% to 65.6% between these two periods.

Table 1: Energy Mix during March 1-April 19, 2020

Sources: Daily Reports; POSOCO; PRS.

This shift may be happening due to various reasons including: (i) renewable energy sources (solar, wind, and small hydro) have MUST RUN status, i.e., the power generated by them has to be given the highest priority by distribution companies, and (ii) running cost of renewable power plants is lower as compared to thermal power plants.

This suggests that if growth in electricity demand were to remain weak, the adverse impact on the coal power plants could be more as compared to other power generation sources.  This will also translate into weak demand for coal in the country as almost 87% of the domestic coal production is used by the power sector.  Note that the plant load factor (PLF) of the thermal power plants has seen a considerable decline over the years, decreasing from 77.5% in 2009-10 to 56.4% in 2019-20. Low PLF implies that coal plants have been lying idle.  Coal power plants require significant fixed costs, and they incur such costs even when the plant is lying idle. The declining capacity utilisation augmented by a weaker demand will undermine the financial viability of these plants further.

Figure 4: Power generation from coal between March 1, 2020 and April 19, 2020 (in MU)

Sources: Daily Reports; POSOCO; PRS.

Finances of the power sector to be severely impacted

Power distribution companies (discoms) buy power from generation companies and supply it to consumers.  In India, most of the discoms are state-owned utilities.  One of the key concerns in the Indian power sector has been the poor financial health of its discoms.  The discoms have had high levels of debt and have been running losses. The debt problem was partly addressed under the UDAY scheme as state governments took over 75% of the debt of state-run discoms (around 2.1 lakh crore in two years 2015-16 and 2016-17).  However, discoms have continued to register losses owing to underpricing of electricity tariff for some consumer segments, and other forms of technical and commercial losses.  Outstanding dues of discoms towards power generation companies have also been increasing, indicating financial stress in some discoms. At the end of February 2020, the total outstanding dues of discoms to generation companies stood at Rs 92,602 crore.

Due to the lockdown and its further impact in the near term, the financial situation of discoms is likely to be aggravated. This will also impact other entities in the value chain including generation companies and their fuel suppliers. This may lead to reduced availability of working capital for these entities and an increase in the risk of NPAs in the sector.  Note that, as of February 2020, the power sector has the largest share in the deployment of domestic bank credit among industries (Rs 5.4 lakh crore, 19.3% of total).

Following are some of the factors which have impacted the financial situation during the lockdown:

  • Reduced cross-subsidy: In most states, the electricity tariff for domestic and agriculture consumers is lower than the actual cost of supply. Along with the subsidy by the state governments, this gap in revenue is partly compensated by charging industrial and commercial consumers at a higher rate.  Hence, industrial and commercial segments cross-subsidise the power consumption by domestic and agricultural consumers.

  • The lockdown has led to a halt on commercial and industrial activities while people are staying indoors.  This has led to a situation where the demand from the consumer segments who cross-subsidise has decreased while the demand from consumer segments who are cross-subsidised has increased.  Due to this, the gap between revenue realised by discoms and cost of supply will widen, leading to further losses for discoms.  States may choose to bridge this gap by providing a higher subsidy.

  • Moratorium to consumers: To mitigate the financial hardship of citizens due to COVID-19, some states such as RajasthanUttar Pradesh, and Goa, among others, have provided consumers with a moratorium for payment of electricity bills. At the same time, the discoms are required to continue supplying electricity. This will mean that the return for the supply made in March and April will be delayed, leading to lesser cash in hand for discoms.

  • Some state governments such as Bihar also announced a reduction in tariff for domestic and agricultural consumers. Although, the reduction in tariff will be compensated to discoms by government subsidy.

  • Constraints with government finances: The revenue collection of states has been severely impacted as economic activities have come to a halt. Further, the state governments are directing their resources for funding relief measures such as food distribution, direct cash transfers, and healthcare. This may adversely affect or delay the subsidy transfer to discoms.

  • The UDAY scheme also requires states to progressively fund greater share in losses of discoms from their budgetary resources (10% in 2018-19, 25% in 2019-20, and 50% in 2020-21).  As losses of discoms may widen due to the above-mentioned factors, the state government’s financial burden is likely to increase.

Capacity addition may be adversely impacted

As per the National Electricity Plan,  India’s total capacity addition target is around 176 GW for 2017-2022.  This comprises of 118 GW from renewable sources, 6.8 GW from hydro sources, and 6.4 GW from coal (apart from 47.8 GW of coal-based power projects already in various stages of production as of January 2018).  

India has set a goal of installing 175 GW of Renewable Power Capacity by 2022 as part of its climate change commitments (86 GW has been installed as of January 2020).  In January 2020, the Parliamentary Standing Committee on Energy observed that India could only install 82% and 55% of its annual renewable energy capacity addition targets in 2017-18 and 2018-19. As of January 2020, 67% of the target has been achieved for 2019-20.

Due to the impact of COVID-19, the capacity addition targets for various sources is likely to be adversely impacted in the short run as:

  • construction activities were stopped during the lockdown and will take some time to return to normal,

  • disruption in the global supply chain may lead to difficulties with the availability of key components leading to delay in execution of projects, for instance, for solar power plants, solar PV modules are mainly imported from China, and

  • reduced revenue for companies due to weak demand will leave companies with less capacity left for capital expenditure.

Key reforms likely to be delayed

Following are some of the important reforms anticipated in 2020-21 which may get delayed due to the developing situation:

  • The real-time market for electricity: The real-time market for electricity was to be operationalised from April 1, 2020. However, the lockdown has led to delay in completion of testing and trial runs. The revised date for implementation is now June 1, 2020.

  • UDAY 2.0/ADITYA: A new scheme for the financial turnaround of discoms was likely to come this year. The scheme would have provided for the installation of smart meters and incentives for rationalisation of the tariff, among other things. It remains to be seen what this scheme would be like since the situation with government finances is also going to worsen due to anticipated economic slowdown. 

  • Auction of coal blocks for commercial mining: The Coal Ministry has been considering auction of coal mines for commercial mining this year. 100% FDI has been allowed in the coal mining activity for commercial sale of coal to attract foreign players. However, the global economic slowdown may mean that the auctions may not generate enough interest from foreign as well as domestic players.

For a detailed analysis of the Indian Power Sector, please see here.  For details on the number of daily COVID-19 cases in the country and across states, please see here.  For details on the major COVID-19 related notifications released by the centre and the states, please see here.