The shortage of skilled man-power is a cause for concern in most sectors in India.  Experts acknowledge that the present higher education system in India is not equipped to address this problem without some changes in the basic structure.  Official records show that the gross enrollment ratio in higher education is only 11 per cent while the National Knowledge Commission says only seven per cent of the population between the age group of 18-24 enters higher education.  Even those who have access are not ensured of quality.  Despite having over 300 universities, not a single Indian university is listed in the top 100 universities of the world. Present Regulatory framework The present system of higher education is governed by the University Grants Commission (UGC), which is the apex body responsible for coordination, determination and maintenance of standards, and release of grants.   Various professional councils are responsible for recognition of courses, promotion of professional institutions and providing grants to undergraduate programmes.  Some of the prominent councils include All India Council for Technical Education (AICTE), Medical Council of India (MCI) and the Bar Council of India (BCI).  The Central Advisory Board of Education coordinates between the centre and the states. Universities in India can be established by an Act of Parliament or state legislatures such as Delhi University, Calcutta University and Himachal Pradesh University.  Both government-aided and unaided colleges are affiliated with a university.  The central government can also declare an institution to be a deemed university based on recommendation of the University Grants Commission.  There are about 130 deemed universities and includes universities such as Indian Institute of Foreign Trade and Birla Institute of Technology.  Such universities are allowed to set their own syllabus, admission criteria and fees.  Some prominent institutions are also classified as institutions of national importance. Reforms in Higher Education There have been calls to revamp the regulatory structure, make efforts to attract talented faculty, and increase spending on education from about 4% of the Gross Domestic Product (GDP) to about 6%. Presently, the allocation for higher education is at a measly 0.7% of GDP. From time to time government appointed various expert bodies to suggest reforms in the education sector.  The two most recent recommendations were made by the National Knowledge Commission (NKC) formed in 2005 under the chairmanship of Mr Sam Pitroda and the Committee to Advise on Renovation and Rejuvenation of Higher Education, formed in 2008 under the chairmanship of Shri Yashpal.

Key Recommendations of NKC Key Recommendations of Yashpal Committee
  • Presently, India has about 350 universities.  Around 1,500 universities should be opened nationwide so that India is able to attain a gross enrolment ratio of at least 15% by 2015.
  • Existing universities should be reformed through revision of curricula at least once in three years, supplementing annual examination with internal assessment, transition to a course credit system, attract talented faculty by improving working conditions and incentives.
  • A Central Board of Undergraduate Education should be established, along with State Boards of Undergraduate Education, which would set curricula and conduct examinations for undergraduate colleges that choose to be affiliated with them.
  • An Independent Regulatory Authority for Higher Education (IRAHE) should be formed.  IRAHE should be independent of all stakeholders and be established by an Act of Parliament.
  • The UGC would focus on disbursement of grants and maintaining public institutions of higher learning.  The regulatory function of the AICTE, MCI, and BCI would be performed by IRAHE.
  • The IRAHE shall have the power to set and monitor standards, accord degree-granting power to institutions of higher education, license accreditation agencies, and settle disputes.  Same norms shall apply to all institutions irrespective of whether they are public or private, domestic or international.
  • Quality of education can be enhanced by stringent information disclosure norms, evaluation of courses by teachers and students, rethinking the issue of salary differentials within and between universities to retain talented faculty, formulating policies for entry of foreign institutions in India and the promotion of Indian institutions abroad.
  • The academic functions of all the professional bodies (such as UGC, AICTE, MCI, and BCI) should be subsumed under an apex body for higher education called the National Commission for Higher Education and Research (NCHER), formed through Constitutional amendment.
  • The professional bodies should be divested of their academic functions.  They should only be looking after the fitness of the people who wish to practice in their respective fields by conducting regular qualifying examination.
  • Establish a National Education Tribunal with powers to adjudicate on disputes among stake-holders within institutions and between institutions so as to reduce litigation in courts involving universities and higher education institutions.
  • Curricular reform should be the top-most priority of the NCHER.  It should be based on the principles of mobility within a full range of curricular areas.
  • Vocational education sector should be brought within the purview of universities.
  • NCHER should promote research in the university system through the creation of a National Research Foundation.
  • Practice of according status of deemed university be stopped till the NCHER takes a considered view on it.
  • NCHER should identify the best 1500 colleges across India and upgrade them as universities.
  • A national testing scheme for admission to the universities on the pattern of the GRE to be evolved which would be open to all the aspirants of University education, to be held more than once a year.
  • Quantum of central financial support to state-funded universities should be enhanced substantially on an incentive pattern.
Sources: The Report to the Nation, 2006-09, NKC; Yashpal Committee Report, 2009; PRS

The Draft NCHER Bill, 2010 In response to the reports, the government drafted a Bill on higher education and put it in the public domain.  The draft National Commission for Higher Education and Research Bill, 2010 seeks to establish the National Commission for Higher Education and Research whose members shall be appointed by the President on the recommendation of the selection committee (include Prime Minister, Leader of the Opposition in Lok Sabha, Speaker). The Commission shall take measures to promote autonomy of higher education and for facilitating access, inclusion and opportunities to all.  It may specify norms for grant of authorisation to a university, develop a national curriculum framework, specify requirement of academic quality for awarding a degree, specify minimum eligibility conditions for appointment of Vice Chancellors, maintain a national registry, and encourage universities to become self regulatory.  Vice Chancellors shall be appointed on the recommendation of a collegium of eminent personalities.  The national registry shall be maintained with the names of persons eligible for appointment as Vice Chancellor or head of institution of national importance.  Any person can appeal a decision of the Commission to the National Educational Tribunal. (For opinions by some experts on the Bill, click here and here.) Other Bills that are in the pipeline include The Foreign Educational Institutions (Regulation of Entry and Operation) Bill, 2010; the Central Educational Institutions (Reservation in Admission) (Amendment) Bill, 2010; and the Innovation Universities Bill, 2010.

Earlier this week, Lok Sabha passed the Bill that provides for the allocation of coal mines that were cancelled by the Supreme Court last year.  In light of this development, this post looks at the issues surrounding coal block allocations and what the 2015 Bill seeks to achieve.

In September 2014, the Supreme Court cancelled the allocations of 204 coal blocks.  Following the Supreme Court judgement, in October 2014, the government promulgated the Coal Mines (Special Provisions) Ordinance, 2014 for the allocation of the cancelled coal mines.  The Ordinance, which was replaced by the Coal Mines (Special Provisions) Bill, 2014, could not be passed by Parliament in the last winter session, and lapsed. The government then promulgated the Coal Mines (Special Provisions) Second Ordinance, 2014 on December 26, 2014.  The Coal Mines (Special Provisions) Bill, 2015 replaces the second Ordinance and was passed by Lok Sabha on March 4, 2015. Why is coal considered relevant? Coal mining in India has primarily been driven by the need for energy domestically.  About 55% of the current commercial energy use is met by coal.  The power sector is the major consumer of coal, using about 80% of domestically produced coal. As of April 1, 2014, India is estimated to have a cumulative total of 301.56 billion tonnes of coal reserves up to a depth of 1200 meters.  Coal deposits are mainly located in Jharkhand, Odisha, Chhattisgarh, West Bengal, Madhya Pradesh, Andhra Pradesh and Maharashtra. How is coal regulated? The Ministry of Coal has the overall responsibility of managing coal reserves in the country.  Coal India Limited, established in 1975, is a public sector undertaking, which looks at the production and marketing of coal in India.  Currently, the sector is regulated by the ministry’s Coal Controller’s Organization. The Coal Mines (Nationalisation) Act, 1973 (CMN Act) is the primary legislation determining the eligibility for coal mining in India.  The CMN Act allows private Indian companies to mine coal only for captive use.  Captive mining is the coal mined for a specific end-use by the mine owner, but not for open sale in the market.  End-uses currently allowed under the CMN Act include iron and steel production, generation of power, cement production and coal washing.  The central government may notify additional end-uses. How were coal blocks allocated so far? Till 1993, there were no specific criteria for the allocation of captive coal blocks.  Captive mining for coal was allowed in 1993 by amendments to the CMN Act.  In 1993, a Screening Committee was set up by the Ministry of Coal to provide recommendations on allocations for captive coal mines.  All allocations to private companies were made through the Screening Committee.  For government companies, allocations for captive mining were made directly by the ministry.  Certain coal blocks were allocated by the Ministry of Power for Ultra Mega Power Projects (UMPP) through tariff based competitive bidding (bidding for coal based on the tariff at which power is sold).  Between 1993 and 2011, 218 coal blocks were allocated to both public and private companies under the CMN Act. What did the 2014 Supreme Court judgement do? In August 2012, the Comptroller and Auditor General of India released a report on the coal block allocations. CAG recommended that the allocation process should be made more transparent and objective, and done through competitive bidding. Following this report, in September 2012, a Public Interest Litigation matter was filed in the Supreme Court against the coal block allocations.  The petition sought to cancel the allotment of the coal blocks in public interest on grounds that it was arbitrary, illegal and unconstitutional. In September 2014, the Supreme Court declared all allocations of coal blocks, made through the Screening Committee and through Government Dispensation route since 1993, as illegal.  It cancelled the allocation of 204 out of 218 coal blocks.  The allocations were deemed illegal on the grounds that: (i) the allocation procedure followed by the Screening Committee was arbitrary, and (ii) no objective criterion was used to determine the selection of companies.  Further, the allocation procedure was held to be impermissible under the CMN Act. Among the 218 coal blocks, 40 were under production and six were ready to start production.  Of the 40 blocks under production, 37 were cancelled and of the six ready to produce blocks, five were cancelled.  However, the allocation to Ultra Mega Power Projects, which was done via competitive bidding for lowest tariffs, was not declared illegal. What does the 2015 Bill seek to do? Following the cancellation of the coal blocks, concerns were raised about further shortage in the supply of coal, resulting in more power supply disruptions.  The 2015 Bill primarily seeks to allocate the coal mines that were declared illegal by the Supreme Court.  It provides details for the auction process, compensation for the prior allottees, the process for transfer of mines and details of authorities that would conduct the auction.  In December 2014, the ministry notified the Coal Mines (Special Provisions) Rules, 2014.  The Rules provide further guidelines in relation to the eligibility and compensation for prior allottees. How is the allocation of coal blocks to be carried out through the 2015 Bill? The Bill creates three categories of mines, Schedule I, II and III.  Schedule I consists of all the 204 mines that were cancelled by the Supreme Court.  Of these mines, Schedule II consists of all the 42 mines that are under production and Schedule III consists of 32 mines that have a specified end-use such as power, iron and steel, cement and coal washing. Schedule I mines can be allocated by way of either public auction or allocation.  For the public auction route any government, private or joint venture company can bid for the coal blocks.  They can use the coal mined from these blocks for their own consumption, sale or for any other purpose as specified in their mining lease.  The government may also choose to allot Schedule I mines to any government company or any company that was awarded a power plant project through competitive bidding.  In such a case, a government company can use the coal mined for own consumption or sale.  However, the Bill does not provide clarity on the purpose for which private companies can use the coal. Schedule II and III mines are to be allocated by way of public auction, and the auctions have to be completed by March 31, 2015.  Any government company, private company or a joint venture with a specified end-use is eligible to bid for these mines. In addition, the Bill also provides details on authorities that would conduct the auction and allotment and the compensation for prior allottees.  Prior allottees are not eligible to participate in the auction process if: (i) they have not paid the additional levy imposed by the Supreme Court; or (ii) if they are convicted of an offence related to coal block allocation and sentenced to imprisonment of more than three years. What are some of the issues to consider in the 2015 Bill? One of the major policy shifts the 2015 Bill seeks to achieve is to enable private companies to mine coal in the future, in order to improve the supply of coal in the market.  Currently, the coal sector is regulated by the Coal Controller’s Organization, which is under the Ministry of Coal.  The Bill does not establish an independent regulator to ensure a level playing field for both private and government companies bidding for auction of mines to conduct coal mining operations.   In the past, when other sectors have opened up to the private sector, an independent regulatory body has been established beforehand.  For example, the Telecom Regulatory Authority of India, an independent regulatory body, was established when the telecom sector was opened up for private service providers.  The Bill also does not specify any guidelines on the monitoring of mining activities by the new allottees. While the Bill provides broad details of the process of auction and allotment, the actual results with regards to money coming in to the states, will depend more on specific details, such as the tender documents and floor price.  It is also to be seen whether the new allotment process ensures equitable distribution of coal blocks among the companies and creates a fair, level-playing field for them.  In the past, the functioning of coal mines has been delayed due to delays in land acquisition and environmental clearances.  This Bill does not address these issues.  The auctioning of coal blocks resulting in improving the supply of coal, and in turn addressing the problem of power shortage in the country, will also depend on the efficient functioning of the mines,  in addition to factors such as transparent allocations.