Applications for the LAMP Fellowship 2025-26 will open soon. Sign up here to be notified when the dates are announced.
To contain the spread of COVID-19 in India, the central government imposed a nation-wide lockdown on March 24, 2020. Under the lockdown most economic activities, other than those classified as essential activities, were suspended. States have noted that this loss of economic activity has resulted in a loss of income for many individuals and businesses. To allow some economic activities to start, some states have provided relaxations to establishments from their existing labour laws. This blog explains the manner in which labour is regulated in India, and the various relaxations in labour laws that are being announced by various states.
How is labour regulated in India?
Labour falls under the Concurrent List of the Constitution. Therefore, both Parliament and State Legislatures can make laws regulating labour. Currently, there are over 100 state laws and 40 central laws regulating various aspects of labour such as resolution of industrial disputes, working conditions, social security, and wages. To improve ease of compliance and ensure uniformity in central level labour laws, the central government is in the process of codifying various labour laws under four Codes on (i) industrial relations, (ii) occupational safety, health and working conditions, (iii) wages, and (iv) social security. These Codes subsume laws such as the Industrial Disputes Act, 1947, the Factories Act, 1948, and the Payment of Wages Act, 1936.
How do state governments regulate labour?
A state may regulate labour by: (i) passing its own labour laws, or (ii) amending the central level labour laws, as applicable to the state. In cases where central and state laws are incompatible, central laws will prevail and the state laws will be void. However, a state law that is incompatible with central laws may prevail in that state if it has received the assent of the President. For example: In 2014, Rajasthan amended the Industrial Disputes Act, 1947. Under the Act, certain special provisions with regard to retrenchment, lay-off and closure of establishments applied to establishments with 100 or more workers. For example, an employer in an establishment with 100 or more workers required permission from the central or state government prior to retrenchment of workers. Rajasthan amended the Act to increase the threshold for the application of these special provisions to establishments with 300 workers. This amendment to the central law prevailed in Rajasthan as it received the assent of the President.
Which states have passed relaxations to labour laws?
The Uttar Pradesh Cabinet has approved an ordinance, and Madhya Pradesh has promulgated an ordinance, to relax certain aspects of existing labour laws. Further, Gujarat, Rajasthan, Haryana, Uttarakhand, Himachal Pradesh, Assam, Goa, Uttar Pradesh, and Madhya Pradesh have notified relaxations to labour laws through rules.
Madhya Pradesh: On May 6, 2020, the Madhya Pradesh government promulgated the Madhya Pradesh Labour Laws (Amendment) Ordinance, 2020. The Ordinance amends two state laws: the Madhya Pradesh Industrial Employment (Standing Orders) Act, 1961, and the Madhya Pradesh Shram Kalyan Nidhi Adhiniyam, 1982. The 1961 Act regulates the conditions of employment of workers and applies to all establishments with 50 or more workers. The Ordinance increases this threshold to 100 or more workers. Therefore, the Act will no longer apply to establishments with between 50 and 100 workers that were previously regulated. The 1982 Act provides for the constitution of a Fund that will finance activities related to welfare of labour. The Ordinance amends the Act to allow the state government to exempt any establishment or class of establishments from the provisions of the Act through a notification. These provisions include payment of contributions into the Fund by employers at the rate of three rupees every six months.
Further, the Madhya Pradesh government has exempted all new factories from certain provisions of the Industrial Disputes Act, 1947. Provisions related to lay-off and retrenchment of workers, and closure of establishments will continue to apply. However, the other provisions of the Act such as those related to industrial dispute resolution, strikes and lockouts, and trade unions, will not apply. This exemption will remain in place for the next 1,000 days (33 months). Note that the Industrial Disputes Act, 1947 allows the state government to exempt certain establishments from the provisions of the Act as long as it is satisfied that a mechanism is in place for the settlement and investigation of industrial disputes.
Uttar Pradesh
The Uttar Pradesh Cabinet has approved the Uttar Pradesh Temporary Exemption from Certain Labour Laws Ordinance, 2020. According to news reports, the Ordinance seeks to exempt all factories and establishments engaged in manufacturing processes from all labour laws for a period of three years, subject to the fulfilment of certain conditions. These conditions include:
Wages: The Ordinance specifies that workers cannot be paid below minimum wage. Further, workers must be paid within the time limit prescribed in the Payment of Wages Act, 1936. The Act specifies that: (i) establishments with less than 1,000 workers must pay wages before the seventh day after the last day of the wage period and (ii) all other establishments must pay wages before the tenth day after the last day of the wage period. Wages must be paid into the bank accounts of workers.
Health and safety: The Ordinance states that provisions of health and safety specified in the Building and Other Construction Workers Act, 1996 and Factories Act, 1948 will continue to apply. These provisions regulate the usage of dangerous machinery, inspections, and maintenance of factories, amongst others.
Work Hours: Workers cannot be required to work more than eleven hours a day and the spread of work may not be more than 12 hours a day.
Compensation: In the case of accidents leading to death or disability, workers will be compensated as per the Employees Compensation Act, 1923.
Bonded Labour: The Bonded Labour System (Abolition) Act, 1976 will continue to remain in force. It provides for the abolition of the bonded labour system. Bonded labour refers to the system of forced labour where a debtor enters into an agreement with the creditor under certain conditions such as to repay his or a family members debt, due to his caste or community, or due to a social obligation.
Women and children: Provisions of labour laws relating to the employment of women and children will continue to apply.
It is unclear if labour laws providing for social security, industrial dispute resolution, trade unions, strikes, amongst others, will continue to apply to businesses in Uttar Pradesh for the period of three years specified in the Ordinance. Since the Ordinance is restricting the application of central level labour laws, it requires the assent of the President to come into effect.
Changes in work hours
The Factories Act, 1948 allows state governments to exempt factories from provisions related to work hours for a period of three months if factories are dealing with an exceptional amount of work. Further, state governments may exempt factories from all provisions of the Act in the case of public emergencies. The Gujarat, Himachal Pradesh, Rajasthan, Haryana, Uttar Pradesh, Goa, Assam and Uttarakhand governments passed notifications to increase maximum weekly work hours from 48 hours to 72 hours and daily work hours from 9 hours to 12 hours for certain factories using this provision. Further, Madhya Pradesh has exempted all factories from the provisions of the Factories Act, 1948 that regulate work hours. These state governments have noted that an increase in work hours would help address the shortage of workers caused by the lockdown and longer shifts would ensure fewer number of workers in factories allowing for social distancing to be maintained. Table 1 shows the state-wise increase in maximum work hours.
Table 1: State-wise changes to work hours
State |
Establishments |
Maximum weekly work hours |
Maximum daily work hours |
Overtime Pay (2x ordinary wages) |
Time period |
All factories |
Increased from 48 hours to 72 hours |
Increased from 9 hours to 12 hours |
Not required |
Three months |
|
All factories |
Increased from 48 hours to 72 hours |
Increased from 9 hours to 12 hours |
Required |
Three months |
|
All factories distributing essential goods and manufacturing essential goods and food |
Increased from 48 hours to 72 hours |
Increased from 9 hours to 12 hours |
Required |
Three months |
|
All factories |
Not specified |
Increased from 9 hours to 12 hours |
Required |
Two months |
|
All factories |
Increased from 48 hours to 72 hours |
Increased from 9 hours to 12 hours |
Not required |
Three months* |
|
All factories and continuous process industries that are allowed to function by government |
Maximum 6 days of work a week |
Two shifts of 12 hours each. |
Required |
Three months |
|
All factories |
Not specified |
Increased from 9 hours to 12 hours |
Required |
Three months |
|
Goa |
All factories |
Not specified |
Increased from 9 hours to 12 hours |
Required |
Approximately three months |
All factories |
Not specified |
Not specified |
Not specified |
Three months |
Note: *The Uttar Pradesh notification was withdrawn
In the last decade, the government has implemented several schemes to address issues related to urbanisation and aid the process of urban development. One of the schemes is the Smart Cities Mission, which intends to take advantage of the developments in information technology in developing the urban development strategy, across 100 cities. Last week the government announced the list of 9 new Smart Cities, taking the total to 99. In light of this, we look at the Smart Cities Mission and a few issues with it.
What is a Smart City?
The primary objective of the Mission is to develop cities that provide core infrastructure and give a decent quality of life to its citizens, a clean and sustainable environment, and apply ‘smart’ solutions.
However, the Mission document does not provide one definition of a Smart City. Instead it allows cities to come up with their own solutions of what they identify as a Smart City. The guidelines suggest that the core infrastructure elements in a Smart City will include: (i) adequate water supply, (ii) assured electricity supply, (iii) sanitation, including solid waste management, (iv) efficient urban mobility and public transport, (v) affordable housing, (vi) robust IT connectivity, and (vii) good governance. ‘Smart’ solutions may include (i) energy efficient buildings, (ii) electronic service delivery, (iii) intelligent traffic management, (iv) smart metering, (v) citizen engagement, etc.
How were the Smart Cities selected?
The Mission was introduced in the form of a competition, called the Smart City challenge. The first stage was in July 2015 when states nominated their cities for the competition. In August 2015, the Ministry of Urban Development selected 100 of those cities to participate in the competition. These cities were required to develop their smart city plans (SCPs) and compete against each other. The SCPs were evaluated on the basis of the solutions, the processes followed, the feasibility and cost effectiveness of the plans, and citizen engagement. Over the last 2 years, the Ministry has announced winner cities in batches. So far, 99 cities have been selected under the Mission.
What information do these SCPs contain?
The cities had to prepare their SCPs with two primary strategic components: (i) area-based development, and (ii) pan-city development. The area-based development would cover a particular area of the city, and could have either a redevelopment model, or be a completely new development. Pan-city development would envisage application of certain smart solutions across the city to the existing infrastructure.
Each city had to formulate its own concept, vision, mission and plan for a Smart City that was appropriate to its local context and resources. The Ministry of Urban Development provided technical assistance, through consultancy firms, to cities for helping them prepare these strategic documents.
How will the Mission be implemented?
The Mission will be implemented at the city level by a Special Purpose Vehicle (SPV). The SPV will plan, approve, release funds, implement, manage, monitor, and evaluate the Smart City development projects.
The SPV will be a limited company incorporated under the Companies Act, 2013 at the city-level. It will be chaired by the Collector/ Municipal Commissioner of the Urban Development Authority. The respective state and the Urban Local Body (ULB or municipality) will be the promoters in this company having 50:50 equity shareholding.
How are the Plans getting financed?
The Mission will be operated as a Centrally Sponsored Scheme. The central government will provide financial support of up to Rs 48,000 crore over five years, that is, an average of Rs 500 crore per city. The states and ULBs will have to contribute an equal amount. The central government allocated Rs 4,000 crore towards the Mission in the 2017-18 budget.
Since funding from the government will meet only a part of the funding required, the rest will have to be raised from other sources including: (i) states/ ULBs own resources from collection of user fees, land monetization, etc., (ii) innovative finance mechanisms such as municipal bonds, (iii) leverage borrowings from financial institutions (such as banks), and (iv) the private sector through Public Private Partnerships (PPPs).
The total cost of projects proposed under the various SCPs of the 90 winner cities is Rs 1.9 lakh crore. About 42% of this amount will come from central and state funding, 23% through private investments and PPPs, and 19% through convergence with other schemes (such as HRIDAY, AMRUT, Swachh Bharat-Urban). The remaining will be generated by the cities through the levy of local taxes, and user fees.
What are some of the issues to consider?
Financial capacity of cities: Under the Mission, cities have to generate additional revenue through various sources including market borrowings, PPPs, and land monetization. The High Powered Expert Committee on Indian Urban Infrastructure and Services (HPEC) had observed that ULBs in India are among the weakest in the world, both in terms of capacity to raise resources and financial autonomy. Even though ULBs have been getting higher allocations from the centre and states, and tax devolution to them has increased, their own tax bases are narrow. Further, owing to their poor governance and financial situation, ULBs find it difficult to access external financing.
Such a situation may pose problems when implementing the Mission, where the ULBs have to raise a significant share of the revenue through external sources (PPPs, market borrowings). For example, the Bhubaneswar Smart City Plan has a total project cost of Rs 4,537 crore (over five years), while the city’s annual budget for 2014-15 was Rs 469 crore.
In order to improve the finances of the ULBs, committees have made various recommendations, which include:
The government has recently introduced a few policies and mechanisms to address municipal financing. Examples include value capture financing through public investments in infrastructure projects, and a credit rating system for cities. In June 2017, the Pune Municipal Corporation raised Rs 200 crore by issuing municipal bonds.
Technical capacity of the ULBs: The Smart Cities Mission seeks to empower ULBs to raise their own revenue, and also lays emphasis on the capacity building of ULBs. The HPEC had observed that municipal administration has suffered due to: (i) presence of untrained and unskilled manpower, and (ii) shortage of qualified technical staff and managerial supervisors. It had recommended improving the technical capacity of ULBs by providing technical assistance to state governments, and ULBs in planning, financing, monitoring, and operation of urban programmes. The central government had allocated Rs 10.5 crore towards the capacity building component of the Mission in 2017-18.
The Ministry of Urban Development has been running several programmes to improve capacity of ULBs. This includes MoUs with 18 states to conduct training programmes for their ULB staff.
Coverage of the Mission: The Mission covers 100 cities, of which 99 have been announced as winners so far. The urban population that will be impacted through the Mission is around 96 million (data for 90 cities excluding the recently announced 9 cities).
As per Census 2011, India’s urban population was 377 million. The Mission impacts about 25% of this population. Further, most of the SCPs approved so far focus on area-based development, thus affecting a particular area of the cities. About 80% of the total project cost proposed is towards this model of development. In each city, this area-based development will cover up to 50 acres of area. The remaining 20% of the project cost is towards pan-city development proposals, which provide smart planning solutions for the entire city. It may be argued that even within the selected cities, the Mission will only impact few selected areas, and not necessarily help with development of the entire city.