Applications for the LAMP Fellowship 2025-26 will open soon. Sign up here to be notified when the dates are announced.

To contain the spread of COVID-19 in India, the central government imposed a nation-wide lockdown on March 24, 2020.  Under the lockdown most economic activities, other than those classified as essential activities, were suspended.  States have noted that this loss of economic activity has resulted in a loss of income for many individuals and businesses.  To allow some economic activities to start, some states have provided relaxations to establishments from their existing labour laws.  This blog explains the manner in which labour is regulated in India, and the various relaxations in labour laws that are being announced by various states. 

How is labour regulated in India?

Labour falls under the Concurrent List of the Constitution.  Therefore, both Parliament and State Legislatures can make laws regulating labour.  Currently, there are over 100 state laws and 40 central laws regulating various aspects of labour such as resolution of industrial disputes, working conditions, social security, and wages.  To improve ease of compliance and ensure uniformity in central level labour laws, the central government is in the process of codifying various labour laws under four Codes on (i) industrial relations, (ii) occupational safety, health and working conditions, (iii) wages, and (iv) social security.  These Codes subsume laws such as the Industrial Disputes Act, 1947, the Factories Act, 1948, and the Payment of Wages Act, 1936.   

How do state governments regulate labour?

A state may regulate labour by: (i) passing its own labour laws, or (ii) amending the central level labour laws, as applicable to the state.   In cases where central and state laws are incompatible, central laws will prevail and the state laws will be void.  However, a state law that is incompatible with central laws may prevail in that state if it has received the assent of the President.  For example: In 2014, Rajasthan amended the Industrial Disputes Act, 1947.  Under the Act, certain special provisions with regard to retrenchment, lay-off and closure of establishments applied to establishments with 100 or more workers.  For example, an employer in an establishment with 100 or more workers required permission from the central or state government prior to retrenchment of workers.  Rajasthan amended the Act to increase the threshold for the application of these special provisions to establishments with 300 workers.  This amendment to the central law prevailed in Rajasthan as it received the assent of the President. 

Which states have passed relaxations to labour laws?

The Uttar Pradesh Cabinet has approved an ordinance, and Madhya Pradesh has promulgated an ordinance, to relax certain aspects of existing labour laws.  Further, Gujarat, Rajasthan, Haryana, Uttarakhand, Himachal Pradesh, Assam, Goa, Uttar Pradesh, and Madhya Pradesh have notified relaxations to labour laws through rules.

Madhya Pradesh:  On May 6, 2020, the Madhya Pradesh government promulgated the Madhya Pradesh Labour Laws (Amendment) Ordinance, 2020.  The Ordinance amends two state laws: the Madhya Pradesh Industrial Employment (Standing Orders) Act, 1961, and the Madhya Pradesh Shram Kalyan Nidhi Adhiniyam, 1982.  The 1961 Act regulates the conditions of employment of workers and applies to all establishments with 50 or more workers.  The Ordinance increases this threshold to 100 or more workers.  Therefore, the Act will no longer apply to establishments with between 50 and 100 workers that were previously regulated.  The 1982 Act provides for the constitution of a Fund that will finance activities related to welfare of labour.  The Ordinance amends the Act to allow the state government to exempt any establishment or class of establishments from the provisions of the Act through a notification.  These provisions include payment of contributions into the Fund by employers at the rate of three rupees every six months. 

Further, the Madhya Pradesh government has exempted all new factories from certain provisions of the Industrial Disputes Act, 1947.  Provisions related to lay-off and retrenchment of workers, and closure of establishments will continue to apply.  However, the other provisions of the Act such as those related to industrial dispute resolution, strikes and lockouts, and trade unions, will not apply.   This exemption will remain in place for the next 1,000 days (33 months).  Note that the Industrial Disputes Act, 1947 allows the state government to exempt certain establishments from the provisions of the Act as long as it is satisfied that a mechanism is in place for the settlement and investigation of industrial disputes.

Uttar Pradesh

The Uttar Pradesh Cabinet has approved the Uttar Pradesh Temporary Exemption from Certain Labour Laws Ordinance, 2020.  According to news reports, the Ordinance seeks to exempt all factories and establishments engaged in manufacturing processes from all labour laws for a period of three years, subject to the fulfilment of certain conditions.  These conditions include:

  • Wages:  The Ordinance specifies that workers cannot be paid below minimum wage.  Further, workers must be paid within the time limit prescribed in the Payment of Wages Act, 1936.  The Act specifies that: (i) establishments with less than 1,000 workers must pay wages before the seventh day after the last day of the wage period and (ii) all other establishments must pay wages before the tenth day after the last day of the wage period.  Wages must be paid into the bank accounts of workers. 

  • Health and safety:   The Ordinance states that provisions of health and safety specified in the Building and Other Construction Workers Act, 1996 and Factories Act, 1948 will continue to apply.  These provisions regulate the usage of dangerous machinery, inspections, and maintenance of factories, amongst others. 

  • Work Hours:  Workers cannot be required to work more than eleven hours a day and the spread of work may not be more than 12 hours a day. 

  • Compensation:  In the case of accidents leading to death or disability, workers will be compensated as per the Employees Compensation Act, 1923. 

  • Bonded Labour: The Bonded Labour System (Abolition) Act, 1976 will continue to remain in force.  It provides for the abolition of the bonded labour system.   Bonded labour refers to the system of forced labour where a debtor enters into an agreement with the creditor under certain conditions such as to repay his or a family members debt, due to his caste or community, or due to a social obligation.  

  • Women and children:  Provisions of labour laws relating to the employment of women and children will continue to apply.  

It is unclear if labour laws providing for social security, industrial dispute resolution, trade unions, strikes, amongst others, will continue to apply to businesses in Uttar Pradesh for the period of three years specified in the Ordinance.  Since the Ordinance is restricting the application of central level labour laws, it requires the assent of the President to come into effect. 

Changes in work hours

The Factories Act, 1948 allows state governments to exempt factories from provisions related to work hours for a period of three months if factories are dealing with an exceptional amount of work.  Further, state governments may exempt factories from all provisions of the Act in the case of public emergencies.  The Gujarat, Himachal Pradesh, Rajasthan, Haryana, Uttar Pradesh, Goa, Assam and Uttarakhand governments passed notifications to increase maximum weekly work hours from 48 hours to 72 hours and daily work hours from 9 hours to 12 hours for certain factories using this provision.  Further, Madhya Pradesh has exempted all factories from the provisions of the Factories Act, 1948 that regulate work hours.  These state governments have noted that an increase in work hours would help address the shortage of workers caused by the lockdown and longer shifts would ensure fewer number of workers in factories allowing for social distancing to be maintained.   Table 1 shows the state-wise increase in maximum work hours. 

Table 1: State-wise changes to work hours

State

Establishments

Maximum weekly work hours

Maximum daily work hours

Overtime Pay (2x ordinary wages)

Time period

Gujarat

All factories

Increased from 48 hours to 72 hours 

Increased from 9 hours to 12 hours 

Not required

Three months

Himachal Pradesh

All factories

Increased from 48 hours to 72 hours 

Increased from 9 hours to 12 hours 

Required

Three months

Rajasthan

All factories distributing essential goods and manufacturing essential goods and food

Increased from 48 hours to 72 hours 

Increased from 9 hours to 12 hours 

Required

Three months

Haryana

All factories

Not specified  

Increased from 9 hours to 12 hours 

Required

Two months

Uttar Pradesh

All factories

Increased from 48 hours to 72 hours 

Increased from 9 hours to 12 hours 

Not required

Three months*

Uttarakhand

All factories and continuous process industries that are allowed to function by government

Maximum 6 days of work a week

Two shifts of 12 hours each.

Required

Three months

Assam

All factories

Not specified

Increased from 9 hours to 12 hours 

Required

Three months

Goa

All factories

Not specified

Increased from 9 hours to 12 hours 

Required

Approximately three months

Madhya Pradesh

All factories

Not specified

Not specified

Not specified

Three months

Note: *The Uttar Pradesh notification was withdrawn

Recently, there have been reports of price crashes and distress sales in case of farm produce, such as tomatoesmangoes, and garlic.  In some cases, farmers have dumped their produce on roads.  Produce such as fruits and vegetables are perishable and therefore have a short shelf life.  Further, due to inadequate storage facilities and poor food processing infrastructure farmers have limited options but to sell the produce at prevailing market prices.  This can lead to distress sales or roadside discards (in some cases to avoid additional cost of transportation).

Food processing allows raw food to be stored, marketed, or preserved for consumption later.  For instance, raw agricultural produce such as fruits may be processed into juices, jams, and pickles.  Activities such as waxing (for preservation), packaging, labelling, or ripening of produce also form part of the food processing industry.

Between 2001-02 and 2016-17, production of food grains grew annually at 1.7% on average.  Production of horticulture crops surpassed food grains with an average growth rate of 4.8%.  While production has been increasing over the years, surplus produce tends to go waste at various stages such as procurement, storage, and processing due to lack of infrastructure such as cold storages and food processing units.

Source: Horticulture Statistics at a Glance 2017, Union Budget 2018-19; PRS.

Source: Horticulture Statistics at a Glance 2017, Union Budget 2018-19; PRS.

Losses high among perishables such as fruits and vegetables

Crop losses ranged between 7-16% among fruits and around 5% among cereals in 2015.  The highest losses were witnessed in case of guava, followed by mango, which are perishable fruits.  Perishables such as fruits and vegetables are more prone to losses as compared to cereals.  Such crop losses can occur during operations such as harvesting, thrashing, grading, drying, packaging, transportation, and storage depending upon the commodity.

It was estimated that the annual value of harvest and post-harvest losses of major agricultural products at the national level was Rs 92,651 crore in 2015.  The Standing Committee on Agriculture (2017) stated that such wastage can be reduced with adequate food processing facilities.

Sources: Annual Report 2016-17, Ministry of Food Processing Industries; PRS.

Sources: Annual Report 2016-17, Ministry of Food Processing Industries; PRS.

Inadequate food processing infrastructure

As previously discussed, perishables such as fruits and vegetables are more prone to damages as compared to cereals.  Due to inadequate processing facilities in close proximity, farmers may be unable to hold their produce for a long time.  Hence, they may be forced to sell their produce soon after harvest, irrespective of the prevailing market situations.  Expert committees have recommended that agri-logistics such as cold chain infrastructure and market linkages should be strengthened.

Cold chain infrastructure: Cold chain infrastructure includes processing units, cold storages, and refrigerated vans.  As of 2014, out of a required cold storage capacity of 35 million metric tonnes (MT), almost 90% (31.8 million MT) of the capacity was available (see Table 1).  However, cold storage needs to be coupled with logistical support to facilitate smooth transfer of harvested value from farms to distant locations.  This includes: (i) pack-houses for packaging and preparing fresh produce for long distance transport, (ii) refrigerated transport such as reefer vehicles, and (iii) ripening chambers to ripen raw produce before marketing.  For instance, bananas which are harvested raw may be ripened in these chambers before being marketed.

While there are sufficient cold storages, there are wide gaps in the availability of other associated infrastructure.  This implies that even though almost 90% (32 million tonnes) of cold storage capacity is available, only 15% of the required refrigerated transport exists.  Further, the shortfall in the availability of infrastructure necessary for safe handling of farm produce, like pack-houses and ripening chambers, is over 90%.

Table 1:  Gaps in cold chain infrastructure (2014)

Facility Required Available Gap % gap
Cold storage
(in million MT)

35.1

31.8 3.2

9.3%

Pack-houses

70,080

249 69,831

99.6%

Reefer vehicles

61,826

9,000 52,826

85.4%

Ripening chambers

9,131

812 8,319

91.1%

Source: Standing Committee on Agriculture 2018; PRS.

To minimise post-harvest losses, the Standing Committee (2017) recommended that a country-wide integrated cold chain infrastructure network at block and district levels should be created.  It further recommended that a Cold Chain Coordination and Monitoring Committee should be constituted at the district-level.  The Standing Committee also recommended that farmers need to be trained in value addition activities such as sorting, grading, and pre-cooling harvested produce through facilities such as freezers and ripening chambers.

Between 2008 and 2017, 238 cold chain projects were sanctioned under the Scheme for Integrated Cold Chain and Value Addition Infrastructure.  Grants worth Rs 1,775 crore were approved for these projects.  Of this amount, Rs 964 crore (54%) has been released as of January 2018.  Consequently, out of the total projects sanctioned, 114 (48%) are completed.  The remaining 124 projects are currently under implementation.

Transport Facilities:  Currently, majority of food grains and certain quantities of tea, potato, and onion are transported through railways.  The Committee on Doubling Farmers Income had recommended that railways needs to upgrade its logistics to facilitate the transport of fresh produce directly to export hubs.  This includes creation of adjoining facilities for loading and unloading, and distribution to road transport.

Mega Food Parks: The Mega Food Parks scheme was launched in 2008.  It seeks to facilitate setting up of food processing units.  These units are to be located at a central processing centre with infrastructure required for processing, packaging, quality control labs, and trade facilitation centres.

As of March 2018, out of the 42 projects approved, 10 were operational.  The Standing Committee on Agriculture noted certain reasons for delay in implementation of projects under the scheme.  These include: (i) difficulty in getting loans from banks for the project, (ii) delay in obtaining clearances from the state governments and agencies for roads, power, and water at the project site, (iii) lack of special incentives for setting up food processing units in Mega Food Parks, and (iv) unwillingness of the co-promoters in contributing their share of equity.

Further, the Standing Committee stated that as the scheme requires a minimum area of 50 acres, it does not to promote smaller or individual food processing and preservation units.  It recommended that smaller agro-processing clusters near production areas must be promoted.  The Committee on Doubling Farmers Income recommended establishment of processing and value addition units at strategic places.  This includes rural or production areas for pulses, millets, fruits, vegetables, dairy, fisheries, and poultry in public private-partnership mode.