Applications for the LAMP Fellowship 2025-26 will open soon. Sign up here to be notified when the dates are announced.
Yesterday, the Election Commission announced the dates for the 2019 Lok Sabha elections. The voting will take place in seven phases between April 11, 2019 to May 19, 2019. With this announcement, the Model Code of Conduct (MCC) has comes into force. In this blog, we outline the key features of the MCC.
What is the Model Code of Conduct and who does it apply to?
The MCC is a set of guidelines issued by the Election Commission to regulate political parties and candidates prior to elections, to ensure free and fair elections. This is in keeping with Article 324 of the Constitution, which gives the Election Commission the power to supervise elections to the Parliament and state legislatures. The MCC is operational from the date that the election schedule is announced till the date that results are announced. Thus, for the general elections this year, the MCC came into force on March 10, 2019, when the election schedule was announced, and will operate till May 23, 2019, when the final results will be announced.
How has the Model Code of Conduct evolved over time?
According to a Press Information Bureau release, a form of the MCC was first introduced in the state assembly elections in Kerala in 1960. It was a set of instructions to political parties regarding election meetings, speeches, slogans, etc. In the 1962 general elections to the Lok Sabha, the MCC was circulated to recognised parties, and state governments sought feedback from the parties. The MCC was largely followed by all parties in the 1962 elections and continued to be followed in subsequent general elections. In 1979, the Election Commission added a section to regulate the ‘party in power’ and prevent it from gaining an unfair advantage at the time of elections. In 2013, the Supreme Court directed the Election Commission to include guidelines regarding election manifestos, which it had included in the MCC for the 2014 general elections.
What are the key provisions of the Model Code of Conduct?
The MCC contains eight provisions dealing with general conduct, meetings, processions, polling day, polling booths, observers, party in power, and election manifestos. Major provisions of the MCC are outlined below.
What changes have been recommended in relation to the MCC since the last general elections?
In 2015, the Law Commission in its report on Electoral Reforms, noted that the MCC prohibits the issue of advertisement at the cost of public exchequer in newspapers/media during the election period. However, it observed that since the MCC comes into operation only from the date on which the Commission announces elections, the government can release advertisements prior to the announcement of elections. It noted that this gives an advantage to the ruling party to issue government sponsored advertisements that highlights its achievements, which gives it an undue advantage over other parties and candidates. Therefore, the Commission recommended that a restriction should be imposed on government-sponsored advertisements for up to six months prior to the date of expiry of the House/Assembly. However, it stated that an exception may be carved out for advertisements highlighting the government's poverty alleviation programmes or any health related schemes.
Is the Model Code of Conduct legally binding?
The MCC is not enforceable by law. However, certain provisions of the MCC may be enforced through invoking corresponding provisions in other statutes such as the Indian Penal Code, 1860, Code of Criminal Procedure, 1973, and Representation of the People Act, 1951. The Election Commission has argued against making the MCC legally binding; stating that elections must be completed within a relatively short time (close to 45 days), and judicial proceedings typically take longer, therefore it is not feasible to make it enforceable by law. On the other hand, in 2013, the Standing Committee on Personnel, Public Grievances, Law and Justice, recommended making the MCC legally binding. In a report on electoral reforms, the Standing Committee observed that most provisions of the MCC are already enforceable through corresponding provisions in other statutes, mentioned above. It recommended that the MCC be made a part of the Representation of the People Act, 1951.
Note that this is an updated version of a previous blog published in 201
On March 14, 2022 Rajya Sabha discussed the working of the Ministry of Development of North Eastern Region (DoNER). During the discussion, several issues around budgetary allocation, implementation of schemes and connectivity with the North Eastern Region were discussed. The Ministry of DoNER is responsible for matters relating to the planning, execution and monitoring of development schemes and projects in the North Eastern Region. In this blog post, we analyse the 2022-23 budgetary allocations for the Ministry and discuss related issues.
A new scheme named PM-DevINE announced to boost infrastructure and social development
In 2022-23, the Ministry has seen a 5% increase in allocation from the revised estimates of 2021-22. The Ministry has been allocated Rs 2,800 crore which will be used for various development schemes, such as the North East Special Infrastructure Development Scheme and North East Road Sector Development Scheme. A scheme-wise break-up of the budget allocation for the Ministry is given below in Table 1.
One of the key highlights of the Finance Minister’s Budget Speech was the announcement of a new scheme named the Prime Minister’s Development Initiative for North East (PM-DevINE). It will be implemented through the North East Council (nodal agency for the economic and social development of the North Eastern Region). PM-DevINE will fund infrastructure and social development projects in areas such as road connectivity, health, and agriculture. The scheme will not replace or subsume existing central sector or centrally sponsored schemes. The Scheme will be given an initial allocation of Rs 1,500 crore.
Table 1: Break-up of allocation to the Ministry of DoNER (in Rs crore)
Major Heads |
2020-21 Actuals |
2021-22 BE |
2021-22 RE |
2022-23 BE |
% change from 2021-22 RE to 2022-23 BE |
North East Special Infrastructure Development Scheme |
446 |
675 |
674 |
1,419 |
111% |
Schemes of North East Council |
567 |
585 |
585 |
702 |
20% |
North East Road Sector Development Scheme |
416 |
696 |
674 |
496 |
-26% |
Central pool of resources for North East and Sikkim |
342 |
581 |
581 |
- |
- |
Others |
270 |
322 |
344 |
241 |
-30% |
Total |
1,854 |
2,658 |
2,658 |
2,800 |
5% |
Note: BE – Budget Estimate; RE – Revised Estimate; Schemes for North East Council includes Special Development Projects.
Sources: Demand No. 23 of Union Budget Documents 2022-23; PRS.
Allocation towards capital outlay less than demand
The Standing Committee on Home Affairs (2022) noted that the amount allocated at the budget stage in 2022-23 (Rs 660 crore) was 17% less than the demand by the Ministry (Rs 794 crore). Capital expenditure includes capital outlay which leads to the creation of assets such as schools, hospitals, and roads and bridges. The Committee observed that this may severely affect the implementation of several projects and schemes that require capital outlay. It recommended the Ministry to take up this matter with the Finance Ministry and demand additional assistance at the revised stage of the 2022-23 financial year.
Underutilisation of funds over the years
Since 2011-12 (barring 2016-17), the Ministry has not been able to utilise the funds allocated to it at the budgeted stage (See Figure 1). For instance, in 2020-21, fund utilisation in case of the North East Road Sector Development Scheme was 52%, whereas only 34% of funds were utilised under the North East Special Infrastructure Development Scheme (for infrastructure projects relating to water supply, power, connectivity, social infrastructure). Key reasons for underspending highlighted by the Ministry include late receipt of project proposals and non-receipt of utilisation certificates from state governments.
Figure 1: Underutilisation of funds by the Ministry since 2011-12
Note: Revised Estimate has been used as the Actual Expenditure for 2021-22.
Sources: Union Budget Documents (2011-12 to 2022-23); PRS.
Delay in project completion
The Ministry implements several schemes for infrastructural projects such as roads and bridges. The progress of the certain schemes has been inadequate. The Standing Committee (2022) observed that the physical progress of many road sector projects under the North East Road Sector Development Scheme is either at zero or in single digit percent in spite of release of the amount for the project. Similarly, projects under the Karbi Anglong Autonomous Territorial Council (autonomous district council in Assam) and Social and Infrastructure Development Fund (construction of roads, bridges, and construction of schools and water supply projects in the North Eastern Region) have seen inadequate progress.
Need to address declining forest cover
The Standing Committee (2021) has also recommended the Ministry of DoNER to work towards preserving forest cover. The Committee took note of the declining forest cover in the North East India. As per the India State of Forest Report (2021), states showing major loss of forest cover from 2019 to 2021 are: (i) Arunachal Pradesh (loss of 257 sq km of forest cover), (ii) Manipur (249 sq km), (iii) Nagaland (235 sq km), (iv) Mizoram (186 sq km), and (v) Meghalaya (73 sq km). The loss of forest cover may be attributed to shifting cultivation, cutting down of trees, natural calamities, anthropogenic (environmental pollution) pressure, and developmental activities. The Committee recommended that various measures to protect the forest and environment must be given priority and should implemented within the stipulated timeline. It also suggested the Ministry to: (i) carry out regular plantation drives to increase forest cover/density, and (ii) accord priority towards the ultimate goal of preserving and protecting the forests under various centrally sponsored initiatives.
Key issues raised by Members during discussion in Rajya Sabha
The discussion on the working of the Ministry of DoNER took place in Rajya Sabha on March 14, 2022. One of the issues highlighted by members was about the Ministry not having its own line Department. This leads to the Ministry being dependent on the administrative strength of the states for implementation of projects. Another issue highlighted by several members was the lack of connectivity of the region through railways and road networks which hampers the economic growth of region. The DoNER Minister in his response to the House assured the members that the central government is making continuous efforts towards improving connectivity to the North East region through roads, railways, waterways, and telecommunication.
Allocation by Union Ministries to the North East
Union Ministries allocate 10% of their budget allocation for the North East (See Figure 2 for fund allocation and utilisation). The Ministry of DoNER is the nodal Ministry that monitors and keeps track of the allocation done by various Ministries. In 2022-23, Rs 76,040 crore has been allocated by all the Ministries for the North Eastern region. The allocation has increased by 11% from the revised estimate of 2021-22 (Rs 68,440 crore). In 2019-20 and 2021-21 the actual expenditure towards North Eastern areas was lower than budget estimates by 18% and 19% respectively.
Figure 2: Budgetary allocation by all Union Ministries for the North East (amount in Rs crore)
Source: Report No. 239: Demand for Grants (2022-23) of Ministry of Development of North Eastern Region, Standing Committee on Home Affairs; PRS.