Applications for the LAMP Fellowship 2025-26 will open on December 1, 2024. Sign up here to be notified when applications open.

As of April 26, Rajasthan has 2,083 confirmed cases of COVID-19 (fifth highest in the country), of which 493 have recovered and 33 have died.  On March 18, the Rajasthan government had declared a state-wide curfew till March 31, to check the spread of the disease.  A nation-wide lockdown has also been in place since March 25 and is currently, extended up to May 3.  The state has announced several policy decisions to prevent the spread of the virus and provide relief for those affected by it.  This blog summarises the key policy measures taken by the Government of Rajasthan in response to the COVID-19 pandemic.

Early measures for containment

Between late January and early February, Rajasthan Government’s measures were aimed towards identification, screening and testing, and constant monitoring of passenger arrivals from China.  Instructions were also issued to district health officials for various prevention, treatment, & control related activities, such as (i) mandatory 28-day home isolation for all travellers from China, (ii) running awareness campaigns, and (iii) ensuring adequate supplies of Personal Protection Equipments (PPEs).  Some of the other measures, taken prior to the state-wide lockdown, are summarised below:

Administrative measures

  • The government announced the formation of Rapid Response Teams (RRTs), at the medical college-level and at district-level on March 3 and 5, respectively.

  • The District Collector was appointed as the Nodal Officer for all COVID-19 containment activities.  Control Rooms were to be opened at all Sub-divisional offices.  The concerned officers were also directed to strengthen information dissemination mechanisms and tackle the menace of fake news.

  • Directives were issued on March 11 to rural health workers/officials to report for duty on Gazetted holidays.  Further, government departments were shut down between March 22 and March 31.  Only essential departments such as Health Services were allowed to function on a rotation basis at 50% capacity and special / emergency leaves were permitted. 

Travel and Movement

Health Measures

  • Advisories regarding prevention and control measures were issued to: (i) District Collectors, regarding sample collection and transportation, hotels, and preparedness of hospitals, (ii) Police department, to stop using breath analysers, (iii) Private hospitals, regarding preparedness and monitoring activities, and (iv) Temple trusts, to disinfect their premises with chemicals. 

  • The government issued Standard Operating Procedures for conducting mock drills in emergency response handling of COVID-19 cases.  Training and capacity building measures were also initiated for (i) Railways, Army personnel etc and (ii) ASHA workers, through video conferencing. 

  • A model micro-plan for containing local transmission of COVID was released.  Key features of the plan include: (i) identification and mapping of affected areas, (ii) activities for prevention control, surveillance, and contact tracing, (iii) human resource management, including roles and responsibilities, (iv) various infrastructural and logistical support, such as hospitals, labs etc, and (v) communication and data management.

  • Resource Management: Private hospitals and medical colleges were instructed to reserve 25 % of beds for COVID-19 patients.  They were also instructed to utilise faculty from the departments of Preventive and Social Medicine to conduct health education and awareness activities. 

  • Over 6000 Students of nursing schools were employed in assisting the health department to conduct screening activities being conducted at public places, railways stations, bus stands etc.

  • Further, the government issued guidelines to ensure the rational use of PPEs.

Welfare Measures

During the lockdown

State-wide curfew announced on March 18 has been followed by a nation-wide lockdown between March 25 and May 3. However, certain relaxations have been recommended by the state government from April 21 onwards.  Some of the key measures undertaken during the lockdown period are: 

Administrative Measures

  • Advisory groups and task forces were set up on – (i) COVID-19 prevention, (ii) Health and Economy, and (iii) Higher education.  These groups will provide advice on the way forward for (i) prevention and containment activities, (ii) post-lockdown strategies and strategies to revive the economy, and (iii) to address the challenges facing the higher education sector respectively. 

  • Services of retiring medical and paramedical professionals retiring between March and August have been extended till September 2020. 

Essential Goods and Services

  • A Drug Supply Control Room was set up at the Rajasthan Pharmacy Council.  This is to ensure uninterrupted supply of medicines during the lockdown and will also assist in facilitating home delivery of medicines.

  • The government permitted Fair Price Shops to sell products such as masalas, sanitisers, and hygiene products, in addition to food grains.

  • Village service cooperatives were declared as secondary markets to facilitate farmers to sell their produce near their own fields/villages during the lockdown. 

  • A Whatsapp helpline was also set up for complaints regarding hoarding, black marketing, and overpricing.

Travel and Movement

  • Once lockdown was in place, the government issued instructions to identify, screen, and categorise people from other states who have travelled to Rajasthan.  They were to be categorised into: (i) people displaying symptoms to be put in isolation wards, (ii) people over 60 years of age with symptoms and co-morbidities to be put in quarantine centres, and (iii) asymptomatic people to be home quarantined.

  • On March 28, the government announced the availability of buses to transport people during the lockdown.  Further, stranded students in Kota were allowed to return to their respective states. 

  • On April 2, a portal and a helpline were launched to help stranded foreign tourists and NRIs.

  • On April 11, an e-pass facility was launched for movement of people and vehicles. 

Health Measures

  • To identify COVID-19 patients, district officials were instructed to monitor people with ARI/URI/Pneumonia or other breathing difficulties coming into hospital OPDs.  Pharmacists were also instructed to not issue medicines for cold/cough without prescriptions. 

  • A mobile app – Raj COVID Info – was developed by the government for tracking of quarantined people.  Quarantined persons are required to send their selfie clicks at regular intervals, failing which a notification would be sent by the app.  The app also provides a lot of information on COVID-19, such as the number of cases, and press releases by the government.

  • Due to the lockdown, people had restricted access to hospitals and treatment.  Thus, instructions were issued to utilise Mobile Medical Vans for treatment/screening and also as mobile OPDs

  • On April 20, a detailed action plan for prevention and control of COVID-19 was released.  The report recommended: (i) preparation of a containment plan, (ii) formation of RRTs, (iii) testing protocols, (iv) setting up of control room and helpline, (v) designated quarantine centres and COVID-19 hospitals, (vi) roles and responsibilities, and (vii) other logistics. 

Welfare Measures

  • The government issued instructions to make medicines available free of cost to senior citizens and other patients with chronic illnesses through the Chief Minister’s Free Medicine Scheme.  

  • Rs 60 crore was allotted to Panchayati Raj Institutions to purchase PPEs and for other prevention activities. 

  • A one-time cash transfer of Rs 1000 to over 15 lakh construction workers was announced.  Similar cash transfer of Rs 1000 was announced for poor people who were deprived of livelihood during the lockdown, particularly those people with no social security benefits.  Eligible families would be selected through the Aadhaar database.  Further, an additional cash transfer of Rs 1500 to needy eligible families from different categories was announced.

  • The state also announced an aid of Rs 50 lakh to the families of frontline workers who lose their lives due to COVID-19.

  • To maintain social distancing, the government will conduct a door-to-door distribution of ration to select beneficiaries in rural areas of the state.  The government also announced the distribution of free wheat for April, May, and June, under the National Food Security Act, 2013.  Ration will also be distributed to stranded migrant families from Pakistan, living in the state.

  • The government announced free tractor & farming equipment on rent in tie-up with farming equipment manufacturers to assist economically weak small & marginal farmers.

Other Measures

  • Education: Project SMILE was launched to connect students and teachers online during the lockdown.  Study material would be sent through specially formed Whatsapp groups.  For each subject, 30-40 minute content videos have been prepared by the Education Department.

  • Industry:  On April 18, new guidelines were issued for industries and enterprises to resume operations from April 20 onwards.  Industries located in rural areas or export units / SEZs in municipal areas where accommodation facilities for workers are present, are allowed to function.  Factories have been permitted to increase the working hours from 8 hours to 12 hours per day, to reduce the requirement of workers in factories.  This exemption has been allowed for the next three months for factories operating at 60% to 65% of manpower capacity.

For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.

The Land Acquisition Bill is slated to be taken up for consideration and passing in the Lok Sabha today. The government had circulated an amendment list in the last session of Parliament. In a column in the Financial Express, MR Madhavan discusses the major features of the Land Acquisition Bill and the associated issues that Parliament may need to consider while deliberating on the Bill. Economic growth and job creation require efficient usage of land resources. It is important that a fair and transparent process for purchase and for acquisition of land is followed. For the purchase of land, a key concern is the authenticity of land titles, and the government has drafted a Land Titling Bill for this purpose. In the case of land acquisition, the following questions need to be addressed. What are the end-uses for which public interests will trump private property rights, and justify acquisition of land from a person who is not willing to part with it? What should be the process followed? Since there is no market mechanism of discovery of prices in these cases, how should compensation be computed? Is there a need to address non-land owners who may be displaced by the acquisition process? Does the acquisition process get completed in a reasonable amount of time, and is there finality to the acquisition? In sum, do both sides—the acquirer and the land owner—perceive the process to be fair? The current Bill addresses these questions in the following manner. It defines public purpose to include infrastructure projects (as defined by the finance ministry, with some exclusions); projects related to agriculture, agro-processing and cold storage; industrial corridors, mining activities, national investment and manufacturing zones; government administered or aided educational and research institutions; sports, healthcare, transport and space programmes. It also enables the government to include other infrastructural facilities to this list after tabling a notification in Parliament. The significant difference from the current Land Acquisition Act, 1894, is that land cannot be acquired for use by companies unless they satisfy any of the above end-uses. The Bill includes a requirement for consent of the land owners in some cases. If the land is acquired for use by a private company, 80% of land owners need to give consent. If it is for use by a public private partnership (PPP), 70% of the land owners have to agree to the acquisition. The rationale of having differential consent requirements based on ownership—including the lack of any such requirement if the land is for the use of the government or a public sector undertaking—is not clear. Why should a land owner, who is losing his land care, whether the intended project is to be executed by the government or a private company? The Bill specifies that the compensation will be computed in the following manner. Three factors are taken into account: the circle rate according to the Stamp Act; the average of the top 50% of sale deeds registered in the vicinity in the previous three years; the amount agreed upon, if any, in case of purchase by a private company or PPP. The higher of these three amounts is multiplied by a factor, which varies from 1 in urban areas to a number between 1 and 2 in rural areas, depending upon the distance from the urban centre. To this amount, the value of any fixed assets such as buildings, trees, irrigation channels etc is added. Finally, this figure is doubled (as solatium, i.e. compensation for the fact that the transaction was made with an unwilling seller). The justification given for the multiplier ranging from 1 to 2 is that many transactions are registered at a price significantly lower than the actual value in order to evade taxes—the moot question is whether such under-reporting is uniform across the country? The Bill states that all persons who are affected by the project should be rehabilitated and resettled (R&R). The R&R entitlements for each family includes a house, a one-time allowance, and choice of (a) employment for one person in the project, (b) one-time payment of R5 lakh, or (c) inflation adjusted annuity of R2,000 per month for 20 years. In addition, the resettlement areas should have infrastructure such as a school, post office, roads, drainage, drinking water, etc. The process has several steps. Every acquisition, regardless of size, needs a social impact assessment, which will be reviewed by an expert committee, and evaluated by the state government. Then a preliminary notification will be issued, land records will be updated, objections will be heard, rehabilitation and resettlement survey carried out, and a final declaration of acquisition issued. The owners can then claim compensation, the final award will be announced, and the possession of the land taken. The total time for this process can last up to 50 months. The big question is whether this time frame would hinder economic development and the viability of projects? The Bill provides for an Authority to adjudicate disputes related to measurement of land, compensation payable, R&R etc, with appeals to be heard by the High Court. There are several restrictions on the land acquired. The purpose for which land is acquired cannot be changed. If land is not used for five years, it would be transferred to a land bank or the original owners. Transfer of ownership needs prior permission, and in case of transfer in the first five years, 40% of capital gains have to be shared with the original owners. Recent cases of land acquisition have been followed by public protests, and the stalling of the acquisition. Whereas some of these may be driven by political agendas, the old Act was perceived to be unfair to land owners in several ways. The challenge for Parliament is to examine the new Bill and craft the law in such a way that it is fair (and perceived as such) to land owners, while making acquisition feasible and practical for projects that are required for economic development and other areas of public interest.