As of April 26, Rajasthan has 2,083 confirmed cases of COVID-19 (fifth highest in the country), of which 493 have recovered and 33 have died.  On March 18, the Rajasthan government had declared a state-wide curfew till March 31, to check the spread of the disease.  A nation-wide lockdown has also been in place since March 25 and is currently, extended up to May 3.  The state has announced several policy decisions to prevent the spread of the virus and provide relief for those affected by it.  This blog summarises the key policy measures taken by the Government of Rajasthan in response to the COVID-19 pandemic.

Early measures for containment

Between late January and early February, Rajasthan Government’s measures were aimed towards identification, screening and testing, and constant monitoring of passenger arrivals from China.  Instructions were also issued to district health officials for various prevention, treatment, & control related activities, such as (i) mandatory 28-day home isolation for all travellers from China, (ii) running awareness campaigns, and (iii) ensuring adequate supplies of Personal Protection Equipments (PPEs).  Some of the other measures, taken prior to the state-wide lockdown, are summarised below:

Administrative measures

  • The government announced the formation of Rapid Response Teams (RRTs), at the medical college-level and at district-level on March 3 and 5, respectively.

  • The District Collector was appointed as the Nodal Officer for all COVID-19 containment activities.  Control Rooms were to be opened at all Sub-divisional offices.  The concerned officers were also directed to strengthen information dissemination mechanisms and tackle the menace of fake news.

  • Directives were issued on March 11 to rural health workers/officials to report for duty on Gazetted holidays.  Further, government departments were shut down between March 22 and March 31.  Only essential departments such as Health Services were allowed to function on a rotation basis at 50% capacity and special / emergency leaves were permitted. 

Travel and Movement

Health Measures

  • Advisories regarding prevention and control measures were issued to: (i) District Collectors, regarding sample collection and transportation, hotels, and preparedness of hospitals, (ii) Police department, to stop using breath analysers, (iii) Private hospitals, regarding preparedness and monitoring activities, and (iv) Temple trusts, to disinfect their premises with chemicals. 

  • The government issued Standard Operating Procedures for conducting mock drills in emergency response handling of COVID-19 cases.  Training and capacity building measures were also initiated for (i) Railways, Army personnel etc and (ii) ASHA workers, through video conferencing. 

  • A model micro-plan for containing local transmission of COVID was released.  Key features of the plan include: (i) identification and mapping of affected areas, (ii) activities for prevention control, surveillance, and contact tracing, (iii) human resource management, including roles and responsibilities, (iv) various infrastructural and logistical support, such as hospitals, labs etc, and (v) communication and data management.

  • Resource Management: Private hospitals and medical colleges were instructed to reserve 25 % of beds for COVID-19 patients.  They were also instructed to utilise faculty from the departments of Preventive and Social Medicine to conduct health education and awareness activities. 

  • Over 6000 Students of nursing schools were employed in assisting the health department to conduct screening activities being conducted at public places, railways stations, bus stands etc.

  • Further, the government issued guidelines to ensure the rational use of PPEs.

Welfare Measures

During the lockdown

State-wide curfew announced on March 18 has been followed by a nation-wide lockdown between March 25 and May 3. However, certain relaxations have been recommended by the state government from April 21 onwards.  Some of the key measures undertaken during the lockdown period are: 

Administrative Measures

  • Advisory groups and task forces were set up on – (i) COVID-19 prevention, (ii) Health and Economy, and (iii) Higher education.  These groups will provide advice on the way forward for (i) prevention and containment activities, (ii) post-lockdown strategies and strategies to revive the economy, and (iii) to address the challenges facing the higher education sector respectively. 

  • Services of retiring medical and paramedical professionals retiring between March and August have been extended till September 2020. 

Essential Goods and Services

  • A Drug Supply Control Room was set up at the Rajasthan Pharmacy Council.  This is to ensure uninterrupted supply of medicines during the lockdown and will also assist in facilitating home delivery of medicines.

  • The government permitted Fair Price Shops to sell products such as masalas, sanitisers, and hygiene products, in addition to food grains.

  • Village service cooperatives were declared as secondary markets to facilitate farmers to sell their produce near their own fields/villages during the lockdown. 

  • A Whatsapp helpline was also set up for complaints regarding hoarding, black marketing, and overpricing.

Travel and Movement

  • Once lockdown was in place, the government issued instructions to identify, screen, and categorise people from other states who have travelled to Rajasthan.  They were to be categorised into: (i) people displaying symptoms to be put in isolation wards, (ii) people over 60 years of age with symptoms and co-morbidities to be put in quarantine centres, and (iii) asymptomatic people to be home quarantined.

  • On March 28, the government announced the availability of buses to transport people during the lockdown.  Further, stranded students in Kota were allowed to return to their respective states. 

  • On April 2, a portal and a helpline were launched to help stranded foreign tourists and NRIs.

  • On April 11, an e-pass facility was launched for movement of people and vehicles. 

Health Measures

  • To identify COVID-19 patients, district officials were instructed to monitor people with ARI/URI/Pneumonia or other breathing difficulties coming into hospital OPDs.  Pharmacists were also instructed to not issue medicines for cold/cough without prescriptions. 

  • A mobile app – Raj COVID Info – was developed by the government for tracking of quarantined people.  Quarantined persons are required to send their selfie clicks at regular intervals, failing which a notification would be sent by the app.  The app also provides a lot of information on COVID-19, such as the number of cases, and press releases by the government.

  • Due to the lockdown, people had restricted access to hospitals and treatment.  Thus, instructions were issued to utilise Mobile Medical Vans for treatment/screening and also as mobile OPDs

  • On April 20, a detailed action plan for prevention and control of COVID-19 was released.  The report recommended: (i) preparation of a containment plan, (ii) formation of RRTs, (iii) testing protocols, (iv) setting up of control room and helpline, (v) designated quarantine centres and COVID-19 hospitals, (vi) roles and responsibilities, and (vii) other logistics. 

Welfare Measures

  • The government issued instructions to make medicines available free of cost to senior citizens and other patients with chronic illnesses through the Chief Minister’s Free Medicine Scheme.  

  • Rs 60 crore was allotted to Panchayati Raj Institutions to purchase PPEs and for other prevention activities. 

  • A one-time cash transfer of Rs 1000 to over 15 lakh construction workers was announced.  Similar cash transfer of Rs 1000 was announced for poor people who were deprived of livelihood during the lockdown, particularly those people with no social security benefits.  Eligible families would be selected through the Aadhaar database.  Further, an additional cash transfer of Rs 1500 to needy eligible families from different categories was announced.

  • The state also announced an aid of Rs 50 lakh to the families of frontline workers who lose their lives due to COVID-19.

  • To maintain social distancing, the government will conduct a door-to-door distribution of ration to select beneficiaries in rural areas of the state.  The government also announced the distribution of free wheat for April, May, and June, under the National Food Security Act, 2013.  Ration will also be distributed to stranded migrant families from Pakistan, living in the state.

  • The government announced free tractor & farming equipment on rent in tie-up with farming equipment manufacturers to assist economically weak small & marginal farmers.

Other Measures

  • Education: Project SMILE was launched to connect students and teachers online during the lockdown.  Study material would be sent through specially formed Whatsapp groups.  For each subject, 30-40 minute content videos have been prepared by the Education Department.

  • Industry:  On April 18, new guidelines were issued for industries and enterprises to resume operations from April 20 onwards.  Industries located in rural areas or export units / SEZs in municipal areas where accommodation facilities for workers are present, are allowed to function.  Factories have been permitted to increase the working hours from 8 hours to 12 hours per day, to reduce the requirement of workers in factories.  This exemption has been allowed for the next three months for factories operating at 60% to 65% of manpower capacity.

For more information on the spread of COVID-19 and the central and state government response to the pandemic, please see here.

Earlier this week, Lok Sabha passed the Bill that provides for the allocation of coal mines that were cancelled by the Supreme Court last year.  In light of this development, this post looks at the issues surrounding coal block allocations and what the 2015 Bill seeks to achieve.

In September 2014, the Supreme Court cancelled the allocations of 204 coal blocks.  Following the Supreme Court judgement, in October 2014, the government promulgated the Coal Mines (Special Provisions) Ordinance, 2014 for the allocation of the cancelled coal mines.  The Ordinance, which was replaced by the Coal Mines (Special Provisions) Bill, 2014, could not be passed by Parliament in the last winter session, and lapsed. The government then promulgated the Coal Mines (Special Provisions) Second Ordinance, 2014 on December 26, 2014.  The Coal Mines (Special Provisions) Bill, 2015 replaces the second Ordinance and was passed by Lok Sabha on March 4, 2015. Why is coal considered relevant? Coal mining in India has primarily been driven by the need for energy domestically.  About 55% of the current commercial energy use is met by coal.  The power sector is the major consumer of coal, using about 80% of domestically produced coal. As of April 1, 2014, India is estimated to have a cumulative total of 301.56 billion tonnes of coal reserves up to a depth of 1200 meters.  Coal deposits are mainly located in Jharkhand, Odisha, Chhattisgarh, West Bengal, Madhya Pradesh, Andhra Pradesh and Maharashtra. How is coal regulated? The Ministry of Coal has the overall responsibility of managing coal reserves in the country.  Coal India Limited, established in 1975, is a public sector undertaking, which looks at the production and marketing of coal in India.  Currently, the sector is regulated by the ministry’s Coal Controller’s Organization. The Coal Mines (Nationalisation) Act, 1973 (CMN Act) is the primary legislation determining the eligibility for coal mining in India.  The CMN Act allows private Indian companies to mine coal only for captive use.  Captive mining is the coal mined for a specific end-use by the mine owner, but not for open sale in the market.  End-uses currently allowed under the CMN Act include iron and steel production, generation of power, cement production and coal washing.  The central government may notify additional end-uses. How were coal blocks allocated so far? Till 1993, there were no specific criteria for the allocation of captive coal blocks.  Captive mining for coal was allowed in 1993 by amendments to the CMN Act.  In 1993, a Screening Committee was set up by the Ministry of Coal to provide recommendations on allocations for captive coal mines.  All allocations to private companies were made through the Screening Committee.  For government companies, allocations for captive mining were made directly by the ministry.  Certain coal blocks were allocated by the Ministry of Power for Ultra Mega Power Projects (UMPP) through tariff based competitive bidding (bidding for coal based on the tariff at which power is sold).  Between 1993 and 2011, 218 coal blocks were allocated to both public and private companies under the CMN Act. What did the 2014 Supreme Court judgement do? In August 2012, the Comptroller and Auditor General of India released a report on the coal block allocations. CAG recommended that the allocation process should be made more transparent and objective, and done through competitive bidding. Following this report, in September 2012, a Public Interest Litigation matter was filed in the Supreme Court against the coal block allocations.  The petition sought to cancel the allotment of the coal blocks in public interest on grounds that it was arbitrary, illegal and unconstitutional. In September 2014, the Supreme Court declared all allocations of coal blocks, made through the Screening Committee and through Government Dispensation route since 1993, as illegal.  It cancelled the allocation of 204 out of 218 coal blocks.  The allocations were deemed illegal on the grounds that: (i) the allocation procedure followed by the Screening Committee was arbitrary, and (ii) no objective criterion was used to determine the selection of companies.  Further, the allocation procedure was held to be impermissible under the CMN Act. Among the 218 coal blocks, 40 were under production and six were ready to start production.  Of the 40 blocks under production, 37 were cancelled and of the six ready to produce blocks, five were cancelled.  However, the allocation to Ultra Mega Power Projects, which was done via competitive bidding for lowest tariffs, was not declared illegal. What does the 2015 Bill seek to do? Following the cancellation of the coal blocks, concerns were raised about further shortage in the supply of coal, resulting in more power supply disruptions.  The 2015 Bill primarily seeks to allocate the coal mines that were declared illegal by the Supreme Court.  It provides details for the auction process, compensation for the prior allottees, the process for transfer of mines and details of authorities that would conduct the auction.  In December 2014, the ministry notified the Coal Mines (Special Provisions) Rules, 2014.  The Rules provide further guidelines in relation to the eligibility and compensation for prior allottees. How is the allocation of coal blocks to be carried out through the 2015 Bill? The Bill creates three categories of mines, Schedule I, II and III.  Schedule I consists of all the 204 mines that were cancelled by the Supreme Court.  Of these mines, Schedule II consists of all the 42 mines that are under production and Schedule III consists of 32 mines that have a specified end-use such as power, iron and steel, cement and coal washing. Schedule I mines can be allocated by way of either public auction or allocation.  For the public auction route any government, private or joint venture company can bid for the coal blocks.  They can use the coal mined from these blocks for their own consumption, sale or for any other purpose as specified in their mining lease.  The government may also choose to allot Schedule I mines to any government company or any company that was awarded a power plant project through competitive bidding.  In such a case, a government company can use the coal mined for own consumption or sale.  However, the Bill does not provide clarity on the purpose for which private companies can use the coal. Schedule II and III mines are to be allocated by way of public auction, and the auctions have to be completed by March 31, 2015.  Any government company, private company or a joint venture with a specified end-use is eligible to bid for these mines. In addition, the Bill also provides details on authorities that would conduct the auction and allotment and the compensation for prior allottees.  Prior allottees are not eligible to participate in the auction process if: (i) they have not paid the additional levy imposed by the Supreme Court; or (ii) if they are convicted of an offence related to coal block allocation and sentenced to imprisonment of more than three years. What are some of the issues to consider in the 2015 Bill? One of the major policy shifts the 2015 Bill seeks to achieve is to enable private companies to mine coal in the future, in order to improve the supply of coal in the market.  Currently, the coal sector is regulated by the Coal Controller’s Organization, which is under the Ministry of Coal.  The Bill does not establish an independent regulator to ensure a level playing field for both private and government companies bidding for auction of mines to conduct coal mining operations.   In the past, when other sectors have opened up to the private sector, an independent regulatory body has been established beforehand.  For example, the Telecom Regulatory Authority of India, an independent regulatory body, was established when the telecom sector was opened up for private service providers.  The Bill also does not specify any guidelines on the monitoring of mining activities by the new allottees. While the Bill provides broad details of the process of auction and allotment, the actual results with regards to money coming in to the states, will depend more on specific details, such as the tender documents and floor price.  It is also to be seen whether the new allotment process ensures equitable distribution of coal blocks among the companies and creates a fair, level-playing field for them.  In the past, the functioning of coal mines has been delayed due to delays in land acquisition and environmental clearances.  This Bill does not address these issues.  The auctioning of coal blocks resulting in improving the supply of coal, and in turn addressing the problem of power shortage in the country, will also depend on the efficient functioning of the mines,  in addition to factors such as transparent allocations.