Reports suggest that the first reactor of the Kudankulam power plant is close to operational. With state discoms struggling, advocates of nuclear power see Kudankulam as a necessary boost to India’s struggling power sector. The Kudankulam power plant will have two reactors. At full capacity, the plant would produce 2 GW of energy, making it India’s largest nuclear plant, and significantly increasing India’s nuclear capacity (currently at 4.8 GW or 2.3% of total capacity). Internationally, nuclear power plants contributed 12.3 % of the world's electricity production in 2011. In terms of number of nuclear reactors, India ranks 6th in the world with 20 nuclear reactors (in seven power stations across five states: Rajasthan, Uttar Pradesh, Gujarat, Karnataka and Tamil Nadu). The Kudankulam power station would be Tamil Nadu’s second power station after the Madras Atomic Power Station (MAPS). Tamil Nadu is struggling to meet electricity demand, recently moved the Supreme Court, asking the Centre for more power. Peak demand deficit (the difference between electricity supply and demand at peak periods) in the state was 17.5% in 2011-12. The per capita consumption of electricity in the state was 1,132 kWh in 2009-10, significantly greater than the India average of 779 kWh. Currently, electricity in Tamil Nadu is fueled by a mixture of coal (35% of capacity), renewable sources (42%) and hydro sources (12%). A fully operational Kudankulam reactor would boost Tamil Nadu’s capacity by 6% (including state, private and centrally owned generating entities). The interactive table below provides a state-level breakdown of key power sector indicators. To view data in ascending or descending order, simply click the relevant column heading. (For a detailed overview of the power sector and even more state-wise statistics, see here.) [table id=4 /] Source: Central Electricity Authority; Planning Commission; PRS. Note: capacity for states includes allocated shares in joint and central sector utilities. T&D (transmission and distribution) losses refer to losses in electricity in the process of delivery
The Saansad Adarsh Gram Yojana was launched last week, for the development of model villages. Under the Yojana, Members of Parliament (MPs) will be responsible for developing the socio-economic and physical infrastructure of three villages each by 2019, and a total of eight villages each by 2024.
The first Adarsh Gram must be developed by 2016, and two more by 2019. From 2019 to 2024, five more Adarsh Grams must be developed by each MP, one each year. This implies that a total of 6,433 Adarsh Grams, of the 2,65,000 gram panchayats, will be created by 2024. Key features of the Yojana are outlined below.
Objectives
Key objectives of the Yojana include:
Identification of villages
MPs can select any gram panchayat, other than their own village or that of their spouse, to be developed as an Adarsh Gram. The village must have a population of 3000-5000 people if it is located in the plains, or 1000-3000 people if located in hilly areas.
Lok Sabha MPs can choose a village from their constituency, and Rajya Sabha MPs from the state from which they are elected. Nominated members can choose a village from any district of the country. MPs which represent urban constituencies can identify a village from a neighbouring rural constituency.
Funding
No new funds have been allocated for the Yojana. Resources may be raised through:
Implementation
A Village Development Plan must be created for each Adarsh Gram. While each village will develop a list of activities to be carried out, based on its own resources and requirements, possible activities have been listed in the guidelines for the scheme. For example, Adarsh Grams can work towards providing universal access to basic healthcare facilities, promoting diversified livelihoods through agriculture related livelihoods and skill development, providing pension for all eligible families, housing for all, and promoting social forestry.
The table below outlines key functionaries at the national, state, district, and village level and their responsibilities.
Table 1: Roles and responsibilities of key functionaries
Level | Functionary | Key roles and responsibilities |
National | Member of Parliament |
|
Two committees, headed by the Minister of Rural Development, and Secretary, Rural Development, respectively.* |
|
|
State | A committee headed by the Chief Secretary |
|
District | District Collector |
|
Village | Gram Panchayat and functionaries of schemes (at various levels) |
|
Note: *These committees will include members from other Ministries.
Sources: Saansad Adarsh Gram Yojana Guidelines, Ministry of Rural Development; PRS
Monitoring
A web based monitoring system will be established to enable the MP and other stakeholders to monitor the scheme. Outputs relating to physical and financial targets will be measured each quarter. A mid-term evaluation and post-project evaluation will be conducted through an independent agency.
More information on the scheme is available in the guidelines for the scheme, here.