
There are indications that the Lok Pal Bill, 2011 is likely to be taken up for consideration and passing during the current Winter session of Parliament. The Bill was introduced on Aug 4, 2011 in the Lok Sabha after a prolonged agitation led by Anna Hazare (see PRS analysis of the Bill). It was referred to the Parliamentary Standing Committee on Personnel, Public Grievances, Law and Justice (see PRS note on Committee Systems). The Committee submitted its report on December 9, 2011. The report includes 10 dissent notes from 17 MPs. (a) Kirti Azad, Bal Apte, D.B. Chandre Gowda, Harin Pathak, Arjun Ram Meghwal, and Madhusudan Yadav. (b) Ram Jethmalani (c) Ram Vilas Paswan (d) Shailendra Kumar (e) Prasanta Kumar Majumdar (f) Pinaki Misra (g) A. Sampath (h) S. Semmalai (i) Meenakshi Natrajan, P.T. Thomas, and Deepa Dasmunshi (j) Vijay Bahadur Singh Presently, the government and the Opposition are in the process of formulating their stands on various key issues such as inclusion of the Prime Minister, the lower bureaucracy and the role of the Central Investigation Bureau. We provide a broad overview of the views of the members of the Committee on various key issues. Unanimity on issues On some issues, there was unanimity among the Committee members:
Dissent on issues Certain members of the Committee dissented on specific issues. In Table 1, we list the issues and the reason for the dissent. Table 1: Recommendation of Standing Committee and dissent by individual MPs
Issues | Standing Committee recommendations | Points of dissent | Dissenting MPs |
Inclusion of Prime Minister | Committee left the decision to Parliament stating that there are pros and cons to each view. | - PM should be included. - PM should be brought under the Lok Pal with some exceptions for national security, foreign policy, atomic energy etc. - The decision to investigate or prosecute the PM should be taken by the Lok Pal with 3/4th majority. | - Prasanta Kumar Majumdar, A. Sampath. - Kirti Azad etc, Shailendra Kumar, Pinaki Misra. |
Grievance redressal mechanism | Enact separate law for a grievance redressal mechanism. | Include in the Lok Pal Bill. | Kirti Azad etc, Ram Jethmalani, Shailendra Kumar. |
Inclusion of bureaucracy | Include Group B officers in addition to Group A. | - Include all groups of govt employees. - Include Group ‘C’. - Do not include bureaucrats. | - Kirti Azad etc, A. Sampath. - Meenakshi Natrajan etc, Shailendra Kumar, Prasanta Kumar. Majumdar, Pinaki Misra, Vijay Bahadur Singh. - Ram Vilas Paswan. |
Lokayukta | Single, central law to deal with Lok Pal and state Lokayuktas to ensure uniformity in prosecution of public servants. | States should retain power to constitute Lokayuktas. | - S. Semmalai. |
Private NGOs, media and corporate | Include all entities with specified level of govt control or which receive specified amount of public donations or foreign donations above Rs 10 lakh. | No private organsiations should be included. | - Kirti Azad etc., Ram Vilas Paswan. |
Composition of search and selection committees | Selection Committee: In addition to PM and Speaker, it should include the Chief Justice of India, an eminent Indian unanimously nominated by the CAG, CEC and UPSC chairman and only Leader of Opposition of Lok Sabha. Search Committee: Mandatory to constitute. Minimum 7 members with 50% members from SC/ST, OBC, minorities and women. | Selection Committee: PM, Minister, LoPs of both Houses, two judges and CVC. Search Committee: CJI, CAG, CEC, Cabinet Secretary, judges of Supreme Court and High Courts. Selection Committee: PM, LoP in the Lok Sabha, one judge of SC and one Chief Justice of a HC, CVC, CEC and CAG. Search Committee: 10 members out of which 5 should be from civil society and 5 should be retired Chief Justice, CVC, CAG and CEC. Half the members to be from SC/STs, OBCs, minorities or women. | - Kirti Azad etc. - Shailendra Kumar. |
Removal of Lok Pal | In addition to petitioning the President, a citizen should be allowed to approach the Supreme Court directly with a complaint. If admitted, it would be heard by a 5 judge bench. If President does not refer a citizen’s petition, he should give reasons. | Investigation should be conducted by an independent complaint authority. Heavy fines should be imposed in case of a false or frivolous complaint. Instead of the President, the Supreme Court should have power to suspend a member pending inquiry. | - Shailendra Kumar. |
Role of CVC and CBI | CVC should investigate Group C and D employees. Instead of Lok Pal’s investigation wing, the CBI should investigate cases after inquiry by the Lok Pal. CBI to have autonomy over its investigation. Lok Pal shall exercise general supervision over CBI. | CBI should be under the control of the Lok Pal. The CBI Director should be appointed by the Lok Pal’s selection committee. The CVC should be under Lok Pal and the SVCs under the state Lokayuktas. | - Ram Jethmalani, Shailendra Kumar. - A. Sampath. - Meenakshi Natrajan etc. |
False and frivolous complaints | Term of imprisonment should be maximum six months. Amount of fine should not exceed Rs 25,000. Specifically provide for complaints made in good faith in line with the Indian Penal Code. | The term of imprisonment should not exceed 30 days. | - Kirti Azad etc. |
Article 311 | Article 311 of the Constitution should be amended or replaced with a statute. | The procedure adopted by the disciplinary authority should conform to Article 311. | - Kirti Azad etc, Meenakshi Natrajan etc. |
Finance | Lok Pal Bill states that all expenses of the Lok Pal shall be charged to the Consolidated Fund of India (no need for Lok Sabha clearance). The Committee did not make any recommendation with regard to finances of the Lok Pal. | Lok Pal’s expenses should be cleared by the Parliament. Lok Pal should present its budget directly to Parliament rather than through a ministry. | - Kirti Azad etc. - Shailendra Kumar. |
Sources: The Lok Pal Bill, 2011; the Department Related Standing Committee Report on the Lok Pal Bill, 2011 and PRS. |
Earlier this week, Lok Sabha passed the Bill that provides for the allocation of coal mines that were cancelled by the Supreme Court last year. In light of this development, this post looks at the issues surrounding coal block allocations and what the 2015 Bill seeks to achieve.
In September 2014, the Supreme Court cancelled the allocations of 204 coal blocks. Following the Supreme Court judgement, in October 2014, the government promulgated the Coal Mines (Special Provisions) Ordinance, 2014 for the allocation of the cancelled coal mines. The Ordinance, which was replaced by the Coal Mines (Special Provisions) Bill, 2014, could not be passed by Parliament in the last winter session, and lapsed. The government then promulgated the Coal Mines (Special Provisions) Second Ordinance, 2014 on December 26, 2014. The Coal Mines (Special Provisions) Bill, 2015 replaces the second Ordinance and was passed by Lok Sabha on March 4, 2015. Why is coal considered relevant? Coal mining in India has primarily been driven by the need for energy domestically. About 55% of the current commercial energy use is met by coal. The power sector is the major consumer of coal, using about 80% of domestically produced coal. As of April 1, 2014, India is estimated to have a cumulative total of 301.56 billion tonnes of coal reserves up to a depth of 1200 meters. Coal deposits are mainly located in Jharkhand, Odisha, Chhattisgarh, West Bengal, Madhya Pradesh, Andhra Pradesh and Maharashtra. How is coal regulated? The Ministry of Coal has the overall responsibility of managing coal reserves in the country. Coal India Limited, established in 1975, is a public sector undertaking, which looks at the production and marketing of coal in India. Currently, the sector is regulated by the ministry’s Coal Controller’s Organization. The Coal Mines (Nationalisation) Act, 1973 (CMN Act) is the primary legislation determining the eligibility for coal mining in India. The CMN Act allows private Indian companies to mine coal only for captive use. Captive mining is the coal mined for a specific end-use by the mine owner, but not for open sale in the market. End-uses currently allowed under the CMN Act include iron and steel production, generation of power, cement production and coal washing. The central government may notify additional end-uses. How were coal blocks allocated so far? Till 1993, there were no specific criteria for the allocation of captive coal blocks. Captive mining for coal was allowed in 1993 by amendments to the CMN Act. In 1993, a Screening Committee was set up by the Ministry of Coal to provide recommendations on allocations for captive coal mines. All allocations to private companies were made through the Screening Committee. For government companies, allocations for captive mining were made directly by the ministry. Certain coal blocks were allocated by the Ministry of Power for Ultra Mega Power Projects (UMPP) through tariff based competitive bidding (bidding for coal based on the tariff at which power is sold). Between 1993 and 2011, 218 coal blocks were allocated to both public and private companies under the CMN Act. What did the 2014 Supreme Court judgement do? In August 2012, the Comptroller and Auditor General of India released a report on the coal block allocations. CAG recommended that the allocation process should be made more transparent and objective, and done through competitive bidding. Following this report, in September 2012, a Public Interest Litigation matter was filed in the Supreme Court against the coal block allocations. The petition sought to cancel the allotment of the coal blocks in public interest on grounds that it was arbitrary, illegal and unconstitutional. In September 2014, the Supreme Court declared all allocations of coal blocks, made through the Screening Committee and through Government Dispensation route since 1993, as illegal. It cancelled the allocation of 204 out of 218 coal blocks. The allocations were deemed illegal on the grounds that: (i) the allocation procedure followed by the Screening Committee was arbitrary, and (ii) no objective criterion was used to determine the selection of companies. Further, the allocation procedure was held to be impermissible under the CMN Act. Among the 218 coal blocks, 40 were under production and six were ready to start production. Of the 40 blocks under production, 37 were cancelled and of the six ready to produce blocks, five were cancelled. However, the allocation to Ultra Mega Power Projects, which was done via competitive bidding for lowest tariffs, was not declared illegal. What does the 2015 Bill seek to do? Following the cancellation of the coal blocks, concerns were raised about further shortage in the supply of coal, resulting in more power supply disruptions. The 2015 Bill primarily seeks to allocate the coal mines that were declared illegal by the Supreme Court. It provides details for the auction process, compensation for the prior allottees, the process for transfer of mines and details of authorities that would conduct the auction. In December 2014, the ministry notified the Coal Mines (Special Provisions) Rules, 2014. The Rules provide further guidelines in relation to the eligibility and compensation for prior allottees. How is the allocation of coal blocks to be carried out through the 2015 Bill? The Bill creates three categories of mines, Schedule I, II and III. Schedule I consists of all the 204 mines that were cancelled by the Supreme Court. Of these mines, Schedule II consists of all the 42 mines that are under production and Schedule III consists of 32 mines that have a specified end-use such as power, iron and steel, cement and coal washing. Schedule I mines can be allocated by way of either public auction or allocation. For the public auction route any government, private or joint venture company can bid for the coal blocks. They can use the coal mined from these blocks for their own consumption, sale or for any other purpose as specified in their mining lease. The government may also choose to allot Schedule I mines to any government company or any company that was awarded a power plant project through competitive bidding. In such a case, a government company can use the coal mined for own consumption or sale. However, the Bill does not provide clarity on the purpose for which private companies can use the coal. Schedule II and III mines are to be allocated by way of public auction, and the auctions have to be completed by March 31, 2015. Any government company, private company or a joint venture with a specified end-use is eligible to bid for these mines. In addition, the Bill also provides details on authorities that would conduct the auction and allotment and the compensation for prior allottees. Prior allottees are not eligible to participate in the auction process if: (i) they have not paid the additional levy imposed by the Supreme Court; or (ii) if they are convicted of an offence related to coal block allocation and sentenced to imprisonment of more than three years. What are some of the issues to consider in the 2015 Bill? One of the major policy shifts the 2015 Bill seeks to achieve is to enable private companies to mine coal in the future, in order to improve the supply of coal in the market. Currently, the coal sector is regulated by the Coal Controller’s Organization, which is under the Ministry of Coal. The Bill does not establish an independent regulator to ensure a level playing field for both private and government companies bidding for auction of mines to conduct coal mining operations. In the past, when other sectors have opened up to the private sector, an independent regulatory body has been established beforehand. For example, the Telecom Regulatory Authority of India, an independent regulatory body, was established when the telecom sector was opened up for private service providers. The Bill also does not specify any guidelines on the monitoring of mining activities by the new allottees. While the Bill provides broad details of the process of auction and allotment, the actual results with regards to money coming in to the states, will depend more on specific details, such as the tender documents and floor price. It is also to be seen whether the new allotment process ensures equitable distribution of coal blocks among the companies and creates a fair, level-playing field for them. In the past, the functioning of coal mines has been delayed due to delays in land acquisition and environmental clearances. This Bill does not address these issues. The auctioning of coal blocks resulting in improving the supply of coal, and in turn addressing the problem of power shortage in the country, will also depend on the efficient functioning of the mines, in addition to factors such as transparent allocations.