Finances of the Railways were presented along with the Union Budget on February 1, 2018 (the Railways Budget was merged with the Union Budget last year).  In the current Budget Session, Lok Sabha is scheduled to discuss the allocation to the Ministry of Railways.  In light of this, we discuss Railways’ finances, and issues that the transporter has been facing with regard to financing.

What are the different sources of revenue for Railways?

Indian Railways has three primary sources of revenue: (i) its own internal resources (revenue from freight and passenger traffic, leasing of railway land, etc.), (ii) budgetary support from the central government, and (iii) extra budgetary resources (such as market borrowings, institutional financing).

Figure 1Railways’ internal revenue for 2018-19 is estimated at Rs 2,01,090 crore which is 7% higher than the revised estimates of 2017-18.  Majority of this revenue comes from traffic (both freight and passenger), and is estimated at Rs 2,00,840 crore.  In the last few years, Railways has been struggling to run its transportation business, and generate its own revenue.  The growth rate of Railways’ earnings from its core business of running freight and passenger trains has been declining.  This is due to a decline in the growth of both freight and passenger traffic (see Figure 1).  Railways is also slowly losing traffic share to other modes of transport such as roads and airlines.  The share of Railways in total freight traffic has declined from 89% in 1950-51 to 30% in 2011-12.

 

The Committee on Restructuring Railways (2015) had observed that raising revenue for Railways is a challenge because: (i) investment is made in projects that do not have traffic and hence do not generate revenue, (ii) the efficiency improvements do not result in increasing revenue, and (iii) delays in projects results in cost escalation, which makes it difficult to recover costs.  Railways also provides passenger fares that are heavily subsidised, which results in the passenger business facing losses of around Rs 33,000 crore in a year (in 2014-15).  Passenger fares are also cross-subsidised by charging higher rates for freight.  The consequence is that freight rates have been increasing which has resulted in freight traffic moving towards roads.

Figure 2Figure 2 shows the trends in capital outlay over the last decade.  A decline in internal revenue generation has meant that Railways funds its capital expenditure through budgetary support from the central government and external borrowings.  While the support from central government has mostly remained consistent, Railways’ borrowings have been increasing.  Various committees have noted that an increased reliance on borrowings will further exacerbate the financial situation of Railways.

The total proposed capital outlay (or capital expenditure) for 2018-19 is Rs 1,48,528 crore which is a 24% increase from the 2017-18 revised estimates (Rs 1,20,000 crore).  Majority of this capital expenditure will be financed through borrowings (55%), followed by the budgetary support from the central government (37%).  Railways will fund only 8% of its capital expenditure from its own internal resources.

How can Railways raise more money?

The Committee on Restructuring Railways had suggested that Railways can raise more revenue through private participation in the following ways: (i) service and management contracts, (ii) leasing to and from the private sector, (iii) joint ventures, and (iv) private ownership.  However, private participation in Railways has been muted as compared to other sectors such as roads, and airports.

Figure 3One of the key reasons for the failure of private participation in Railways is that policy making, the regulatory function, and operations are all vested within the same organisation, that is, the Ministry of Railways.  Railways’ monopoly also discourages private sector entry into the market.  The Committee on Restructuring Railways had recommended that the three roles must be separated from each other.  It had also recommended setting up an independent regulator for the sector.  The regulator will monitor whether tariffs are market determined and competitive.

Where does Railways spend its money?

The total expenditure for 2018-19 is projected at Rs 1,88,100 crore, which is 4% higher than 2017-18.  Staff wages and pension together comprise more than half of the Railways’ expenditure.  For 2018-19, the expenditure on staff is estimated at Rs 76,452 crore.  Allocation to the Pension Fund is estimated at Rs 47,600 crore.  These constitute about 66% of the Railways’ expenditure in 2018-19.

Railways’ primary expenditure, which is towards the payment of salaries and pension, has been gradually increasing (with a jump of around 15% each year in 2016-17 and 2017-18 due to implementation of the Seventh Pay Commission recommendations).  Further, the pension bill is expected to increase further in the years to come, as about 40% of the Railways staff was above the age of 50 years in 2016-17.

The Committee on Restructuring Railways (2015) had observed that the expenditure on staff is extremely high and unmanageable.  This expense is not under the control of Railways and keeps increasing with each Pay Commission revision.  It has also been observed that employee costs (including pensions) is one of the key components that reduces Railways’ ability to generate surplus, and allocate resources towards operations.

What is the allocation towards depreciation of assets?

Railways maintains a Depreciation Reserve Fund (DRF) to finance the costs of new assets replacing the old ones.  In 2018-19, appropriation to the DRF is estimated at Rs 500 crore, 90% lower than 2017-18 (Rs 5,000 crore).  In the last few years, appropriation to the DRF has decreased significantly from Rs 7,775 crore in 2014-15 to Rs 5,000 crore last year.  Provisioning Rs 500 crore towards depreciation might be an extremely small amount considering the scale of infrastructure managed by the Indian Railways, and the requirement to replace old assets to ensure safety.

The Standing Committee on Railways (2015) had observed that appropriation to the DRF is the residual amount after appropriation to the Pension Fund, instead of the actual requirement for maintenance of assets.  Under-provisioning for the DRF has also been observed as one of the reasons behind the decline in track renewals, and procurement of wagons and coaches.

Is there any provision towards safety?

Last year, the Rashtriya Rail Sanraksha Kosh was created to provide for passenger safety.  It was to have a corpus of one lakh crore rupees over a period of five years (Rs 20,000 crore per year).  The central government was to provide a seed amount of Rs 1,000 crore, and the remaining amount would be raised by the Railways from their own revenues or other sources.

As per the revised estimates of 2017-18, no money was allocated towards this fund.  In 2018-19, Rs 5,000 crore has been allocated for it.  With the Railways struggling to meet its expenditure and declining internal revenues, it is unclear how Railways will fund the remaining amount of Rs 95,000 crore for the Rail Sanraksha Kosh.

What happened to the dividend that was waived off last year?

Railways used to pay a return on the budgetary support it received from the government every year, known as dividend.  The rate of this dividend was about 5% in 2015-16.  From 2016-17, the requirement of paying dividend was waived off.  The last dividend amount paid was Rs 8,722 crore in 2015-16.

The Standing Committee on Railways (2017) had noted that part of the benefit from dividend is being utilised to meet the shortfall in the traffic earnings of Railways.  This defeats the purpose of removing the dividend liabilities since they are not being utilised in creating assets or increasing the net revenue of Railways.

By Rohit & Anirudh A modified 'Modernization of State Police Forces' scheme was started by the central government in 2000-01. One of the objectives was to help police forces in meeting the emerging challenges to internal security in the form of terrorism, naxalism etc. The scheme aims to modernize police forces in terms of:

  • Mobility (including purchase of bullet proof and mine proof vehicles)
  • Weaponry
  • Communication Systems
  • Training
  • Forensic Science Laboratory/ Finger Printing Bureau
  • Equipments
  • Buildings

Under this scheme, States have been clubbed into different categories and Centre-State cost sharing is category specific. Since 2005-06, States have been categorized as category ‘A’ and ‘B’ with 100% and 75% Central funding respectively. All the North Eastern States, namely Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Tripura and Sikkim have been placed in category ‘A’ and thus, are entitled to receive 100% Central assistance for implementation of their annual approved plans. Recently, CAG decided to evaluate the working of the scheme and commissioned ‘performance audit’ reviews covering select general category and special category States. Each review covers a contiguous five year period between 2000 and 2007, but varies across selected states. For the periods under review, each state had a plan outlay (the total amount proposed to be spent in modernizing the state's police forces). However, in most cases, the actual release of funds fell significantly short of this outlay - in some cases the Centre did not contribute its share, in others the States lagged behind. For instance, in the case of Bihar, the Centre released only 56% of its share; while in the case of Rajasthan and West Bengal, the States did not release any funds at all. The graph below shows the actual releases by the Centre and the States (as percentages of their share in the proposed outlays): Further, even the funds that were released were not fully utilized. Thus, the amount finally spent fell significantly short of the initial proposal. The graph below shows the actual expenditure by State: Following are some of the other main findings from the CAG report:

Table 1: Summary of main findings in the CAG audit for different states for Modernisation of State Police Forces

Purpose for which money was sanctioned

Summary of CAG Findings

Planning

(Every state has to propose an Annual Action Plan every year. The plan is approved by the Ministry of Home Affairs and money is released as per the plan.)

§ Submissions by the states to the MHA were delayed.

§ There were also delays in the clearance granted by the MHA.

§ In various states such as,

a) Andhra Pradesh – the government spent money on works not covered by the Annual Action Plan.

b) Bihar – Persistent delays in preparation of the Plan by the state police.

c) West Bengal – the plans drawn up by the state did not include items covered under the scheme.

Mobility

§ Overall shortage of vehicles was observed. Most of the new vehicles replaced the old ones.

§ The police response time was too long in some states.

§ To give examples from some states:

a) Andhra Pradesh – 58 percent of vehicles procured were utilised for replacing old vehicles.

b) Bihar – the shortage of vehicles was 43 percent.

c) Uttar Pradesh – 2400 vehicles were procured against a shortage of nearly 10,000 vehicles.

Residential and non-residential buildings

§ There were considerable delays in construction of buildings in most states. Consequently, police forces’ own security was in jeopardy.

§ In states such as:

a) Andhra Pradesh – 53 percent of staff quarters and 43 percent of official buildings were not completed (2007).

b) Bihar – The total requirement of housing was nearly 60,000. Only six percent of this were included in the Plan.

c) Jharkhand – District Control rooms remained non-functional because of shortage of manpower.

Weapons

§ Police force in states continue to depend on outdated weapons.

§ Shortages of weapons also happened as acquisition from ordnance factories was very slow.

§ The weapons that were procured were mostly kept in the district headquarters.

§ In some states such as,

a) Bihar – AK-47s were kept at the disposal of bodyguards of VIPs.

b) West Bengal – Adequate weapons were not supplied to extremist prone police stations.

Communication

§ Police Telecommunication Networks were not set up successfully in some states. In others, network was functional only up to the district level.

§ Shortages of various communication equipments were also observed.

§ In some states such as,

a) Bihar - The Police Telecommunication Network system (costing Rs. 4.96 crore) remained non-functional due to non-construction of tower.

b) Maharashtra – Of the 850 purchased Remote Station Units, 452 were lying in stores.

Forensic Science Laboratory/ Finger Printing Bureau

§ In most States the Forensic Science Laboratories lacked adequate infrastructure.

§ In the absence of automatic finger print identification systems, investigation was being done manually in some States.

§ In some states such as,

a) Maharashtra - There were significant delays in receipt and installation. There was also shortage (284 vacant posts) of technical manpower.

b) West Bengal - Performance of the Forensic Science Laboratory was poor and in some cases, the delay in issue of investigation reports was as high as 45 months.

Training

§ It was observed that the percentage of police personnel trained was very low.

§ Training infrastructure was also inadequate.

§ In some states such as,

a) Bihar - Only 10 per cent of total force was trained.

b) West Bengal - Live training was not imparted for handling useful weapons and this severely affected the performance of police forces.

Sources: CAG Compendium of Performance Audit Reviews on Modernisation of Police Force; PRS.

Note: The audit has been done broadly from 2000 to 2007. Consequently, the period of audit for different states may vary.

Table 1: Summary of main findings in the CAG audit for different states for Modernisation of State Police Forces

Purpose for which money was sanctioned

Summary of CAG Findings

Planning

(Every state has to propose an Annual Action Plan every year. The plan is approved by the Ministry of Home Affairs and money is released as per the plan.)

§ Submissions by the states to the Ministry of Home Affairs (MHA) were delayed.

§ There were also delays in the clearance granted by the MHA.

§ In various states such as,

a) Andhra Pradesh – the government spent Rs 32 crore on works not covered by the Annual Action Plan.

b) Bihar – Persistent delays in preparation of the Plan by the state police.

c) West Bengal – the plans drawn up by the state did not include items covered under the scheme.

Mobility

§ Overall shortage of vehicles was observed. Most of the new vehicles replaced the old ones, and no additions were made.

§ The police response time was too long in some states.

§ To give examples from some states:

a) Andhra Pradesh – 58 percent of vehicles procured were utilised for replacing old vehicles.

b) Bihar – the shortage of vehicles was 43 percent.

c) Uttar Pradesh – 2400 vehicles were procured against a shortage of nearly 10,000 vehicles. 203 ambassador cars were procured, though only 55 were approved by the MHA.

Residential and non-residential buildings

§ There were considerable delays in construction of buildings in most states. Consequently, police forces’ own security was in jeopardy. Satisfaction levels with the housing provided were also very low.

§ In states such as:

a) Andhra Pradesh – 53 percent of staff quarters and 43 percent of official buildings were not completed (2007).

b) Bihar – The total requirement of housing was nearly 60,000. Only six percent of this were included in the Plan, and only 1045 units were completed by 2006.

c) Jharkhand – District Control rooms remained non-functional even after spending Rs 2 crore because of shortage of manpower.

Weapons

§ It was observed that the police force in states continue to depend on outdated weapons.

§ Shortages of weapons also happened as acquisition from ordnance factories was very slow.

§ The weapons that were procured were mostly kept in the district headquarters.

§ In some states such as,

a) Bihar – AK-47s were kept at the disposal of bodyguards of VIPs.

b) West Bengal – Adequate weapons were not supplied to extremist prone police stations.

Communication

§ Police Telecommunication Networks were not set up successfully in some states. In others, network was functional only up to the district level.

§ Shortages of various communication equipments were also observed.

§ In some states such as,

a) Bihar - The Police Telecommunication Network system (costing Rs. 4.96 crore) remained non-functional due to non-construction of tower.

b) Maharashtra – Of the 850 purchased Remote Station Units, 452 were lying in stores.

Forensic Science Laboratory/ Finger Printing Bureau

§ In most States the Forensic Science Laboratories lacked adequate infrastructure.

§ In the absence of automatic finger print identification systems, investigation was being done manually in some States.

§ In some states such as,

a) Maharashtra - There were significant delays in receipt and installation. There was also shortage (284 vacant posts) of technical manpower.

b) West Bengal - Performance of the Forensic Science Laboratory was poor and in some cases, the delay in issue of investigation reports was as high as 45 months.

Training

§ It was observed that the percentage of police personnel trained was very low.

§ Training infrastructure was also inadequate.

§ In some states such as,

a) Bihar - Only 10 per cent of total force was trained.

b) West Bengal - Live training was not imparted for handling useful weapons and this severely affected the performance of police forces.

Sources: CAG Compendium of Performance Audit Reviews on Modernisation of Police Force; PRS.

Note: The audit has been done broadly from 2000 to 2007. Consequently, the period of audit for different states may vary.