The implementation of the Food Safety and Standards Act, 2006 has run into rough weather.  The Act consolidates eight laws[1] governing the food sector and establishes the Food Safety and Standards Authority (FSSA) as the regulator.  It requires all food business operators (including small businesses and street vendors) to obtain a licence or registration.  The Regulations under FSSA related to procedure for obtaining a licence or registration was notified on August 1, 2011.  According to the Regulations, all food business operators had to get a licence or registration within one year of the notification.  Due to opposition from several food business operators (see here and here), the FSSA has now extended the deadline for getting a licence or registration by another six months (till February 2013).  However, some of the key concerns regarding the law have not yet been addressed.

Key issues related to the Bill raised by PRS (for more details see Legislative Brief)

  • The organised as well as the unorganised food sectors are required to follow the same food law.  The unorganised sector, such as street vendors, might have difficulty in adhering to the law, for example, with regard to specifications on ingredients, traceability and recall procedures.
  • The Bill does not require any specific standards for potable water (which is usually provided by local authorities).  It is the responsibility of the person preparing or manufacturing food to ensure that he uses water of requisite quality even when tap water does not meet the required safety standards.
  • The Bill excludes plants prior to harvesting and animal feed from its purview.  Thus, it does not control the entry of pesticides and antibiotics into the food at its source.
  • The power to suspend the license of any food operator is given to a local level officer.  This offers scope for harassment and corruption.

Other issues referred to in the media

  • The Act requires a food business operator to get different licenses if articles of food are manufactured or sold at different premises.  Newspapers reported that this provision was challenged in the Madras High Court but a stay order on the Act and its Rules was refused.
  • According to media reports, two hotel associations in Karnataka had challenged certain sections of the Act and Rules in the Karnataka High Court related to requirement of technical person for supervision of production process and requirement of a laboratory on the premises of food operators.  The court stayed these provisions for three months (till October 2012).
  • News papers reported that the Supreme Court is examining the question whether liquor is a food.

[1].  (a) The Prevention of Food Adulteration Act, 1954.  (b) The Fruit Products Order, 1955.  (c) The Meat Food Products Order, 1973. (d)  The Vegetable Oil Products (Control) Order, 1947.  (e) The Edible Oils Packaging (Regulation) Order, 1998. (f) The Solvent Extracted Oil, De oiled Meal, and Edible Flour (Control) Order, 1967. (g) The Milk and Milk Products Order, 1992. (h) Any other order issued under the Essential Commodities Act, 1955, relating to food.

On November 28, 2012, the Comptroller and Auditor General submitted its report on the implementation of the Jawaharlal Nehru National Urban Renewal Mission (JNNURM).  According to the report most of the projects initiated under JNNURM have not been completed.  For instance with respect to urban infrastructure projects, only 231 projects out of the 1298 sanctioned projects have been completed.  Similarly, with respect to housing projects, only 22 of the 1517 projects have been completed.  Some of the other key recommendations of the report are:

  •  Some of the reasons for the delay in completing the projects include: (i) delay in acquiring land; (ii) deficiency in preparation of projects; and (iii) non-identification of beneficiaries which increased the risk of ineligible beneficiaries getting the benefits.
  •  A total allocation of Rs 66,084 crore had been made by the Planning Commission.  However, against this total allocation, the central government had made an allocation of only Rs 37,070 out of which until March 30, 2011 only Rs 32,934 had been released.
  • There was a delay in releasing these funds to the states.  A large portion of the funds was released only in the last quarter and more particularly in March.
  • The JNNURM guidelines were deficient as they did not provide adequate guidance to the states on the method of parking the funds and utilization of interest.

The need and objectives of JNNURM According to the 2011 census India’s urban population has increased from 286 million in 2001 to 377 million in 2011 .  With the increase in urban population, there is a requirement to improve the urban infrastructure and improve the service delivery mechanisms.  With these specific objectives in mind, the central government launched the Jawaharlal Nehru National Urban Renewal Mission 2005-2006.  The aim of the Mission is to encourage reforms and fast track planned development of identified cities (such as cities with a population of more than 1 million as per the 2001 census).  JNNURM has two main components namely : (i) Urban Infrastructure and Governance  and (ii) Urban Infrastructure Development for Small and Medium Towns. The duration of JNNURM was from 2005-06 to 2011-12. However, as the projects have not been completed the Government has extended its duration until March 2014. Funds for JNNURM The funds for JNNURM are provided through the Additional Central Assistance.  This implies that the funds are provided as grants to the states directly from the centre.   In the 2012 Union Budget, the central government has allocated Rs 12,522 crore for JNNURM. This represents around 10 % of the total central assistance through the different schemes to states and union territories in 2012-13. As on June 30 2012, 554 projects at a total cost of Rs 62,253 crore have been sanctioned under the Urban Infrastructure and Governance sub-mission of JNNURM.   The table below shows the status of the sanctioned JNNURM  projects in the different states. State wise status of the projects under JNNURM                 (as on August 6, 2012)

Name of State Total Allocation (Rs Lakh) Number of sanctioned projects Completed Projects
Andhra Pradesh 2,11,845 52 18
Arunachal Pradesh 10,740 3 NA
Assam 27,320 2 NA
Bihar 59,241 8 NA
Chandigarh 27,087 3 NA
Chattisgarh 24,803 1 NA
Delhi 2,82,318 23 4
Goa 12,094 2 NA
Gujarat 2,57,881 72 40
Haryana 32,332 4 NA
Himachal Pradesh 13,066 5 NA
Jammu & Kashmir 48,836 5 NA
Jharkhand 94,120 5 NA
Karnataka 1,52,459 47 22
Kerala 67,476 11 NA
Madhya Pradesh 1,32,850 23 7
Maharashtra 5,50,555 80 21
Manipur 15,287 3 NA
Meghalaya 15,668 2 NA
Mizoram 14,822 4 NA
Nagaland 11,628 3 NA
Orissa 32,235 5 NA
Punjab 70,775 6 1
Puducherry 20,680 2 NA
Rajasthan 74,869 13 2
Sikkim 10,613 2 NA
Tamil Nadu 2,25,066 48 12
Tripura 14,018 2 NA
Uttar Pradesh 2,76,941 33 4
Uttarakhand 40,534 14 NA
West Bengal 3,21,840 69 15

Source: Jawaharlal Nehru National Urban Renewal Mission; PRS.

  • Gujarat at 55.55% has the highest number of completed projects, while Uttar Pradesh at 12.24% has the lowest number of completed projects.
  • Out of the larger states, Delhi and Maharashtra at 17% and 26% have a comparatively low rate of completed projects.
  • Maharashtra has the highest number of sanctioned projects, while the North Eastern states, Chattisgarh and Puducherry have the lowest number of sanctioned projects.