Applications for the LAMP Fellowship 2025-26 will open soon. Sign up here to be notified when the dates are announced.
The central government has enforced a nation-wide lockdown between March 25 and May 3 as part of its measures to contain the spread of COVID-19. During the lockdown, several restrictions have been placed on the movement of individuals and economic activities have come to a halt barring the activities related to essential goods and services. The restrictions are being relaxed in less affected areas in a limited manner since April 20. In this blog, we look at how the lockdown has impacted the demand and supply of electricity and what possible repercussions its prolonged effect may have on the power sector.
Power supply saw a decrease of 25% during the lockdown (year-on-year)
As electricity cannot be stored in large amount, the power generation and supply for a given day are planned based on the forecast for demand. The months of January and February in 2020 had seen an increase of 3% and 7% in power supply, respectively as compared to 2019 (year-on-year). In comparison, the power supply saw a decrease of 3% between March 1 and March 24. During the lockdown between March 24 and April 19, the total power supply saw a decrease of about 25% (year-on-year).
Figure 1: % change in power supply position between March 1 and April 19 (Y-o-Y from 2019 to 2020)
Sources: Daily Reports; POSOCO; PRS.
If we look at the consumption pattern by consumer category, in 2018-19, 41% of total electricity consumption was for industrial purposes, followed by 25% for domestic and 18% for agricultural purposes. As the lockdown has severely reduced the industrial and commercial activities in the country, these segments would have seen a considerable decline in demand for electricity. However, note that the domestic demand may have seen an uptick as people are staying indoors.
Figure 2: Power consumption by consumer segment in 2018-19
Sources: Central Electricity Authority; PRS.
Electricity demand may continue to be subdued over the next few months. At this point, it is unclear that when lockdown restrictions are eased, how soon will economic activities return to pre COVID-19 levels. India’s growth projections also highlight a slowdown in the economy in 2020 which will further impact the demand for electricity. On April 16, the International Monetary Fund has slashed its projection for India’s GDP growth in 2020 from 5.8% to 1.9%.
A nominal increase in energy and peak deficit levels
As power sector related operations have been classified as essential services, the plant operations and availability of fuel (primarily coal) have not been significantly constrained. This can be observed with the energy deficit and peak deficit levels during the lockdown period which have remained at a nominal level. Energy deficit indicates the shortfall in energy supply against the demand during the day. The average energy deficit between March 25 and April 19 has been 0.42% while the corresponding figure was 0.33% between March 1 and March 24. Similarly, the average peak deficit between March 25 and April 19 has been 0.56% as compared to 0.41% between March 1 and March 24. Peak deficit indicates the shortfall in supply against demand during highest consumption period in a day.
Figure 3: Energy deficit and peak deficit between March 1, 2020 and April 19, 2020 (in %)
Sources: Daily Reports; POSOCO; PRS.
Coal stock with power plants increases
Coal is the primary source of power generation in the country (~71% in March 2020). During the lockdown period, the coal stock with coal power plants has seen an increase. As of April 19, total coal-stock with the power plants in the country (in days) has risen to 29 days as compared to 24 days on March 24. This indicates that the supply of coal has not been constrained during the lockdown, at least to the extent of meeting the requirements of power plants.
Energy mix changes during the lockdown, power generation from coal impacted
During the lockdown, power generation has been adjusted to compensate for reduced consumption, Most of this reduction in consumption has been adjusted by reduced coal power generation. As can be seen in Table 1, coal power generation reduced from an average of 2,511 MU between March 1 and March 24 to 1,873 MU between March 25 and April 19 (about 25%). As a result, the contribution of coal in total power generation reduced from an average of 72.5% to 65.6% between these two periods.
Table 1: Energy Mix during March 1-April 19, 2020
Sources: Daily Reports; POSOCO; PRS.
This shift may be happening due to various reasons including: (i) renewable energy sources (solar, wind, and small hydro) have MUST RUN status, i.e., the power generated by them has to be given the highest priority by distribution companies, and (ii) running cost of renewable power plants is lower as compared to thermal power plants.
This suggests that if growth in electricity demand were to remain weak, the adverse impact on the coal power plants could be more as compared to other power generation sources. This will also translate into weak demand for coal in the country as almost 87% of the domestic coal production is used by the power sector. Note that the plant load factor (PLF) of the thermal power plants has seen a considerable decline over the years, decreasing from 77.5% in 2009-10 to 56.4% in 2019-20. Low PLF implies that coal plants have been lying idle. Coal power plants require significant fixed costs, and they incur such costs even when the plant is lying idle. The declining capacity utilisation augmented by a weaker demand will undermine the financial viability of these plants further.
Figure 4: Power generation from coal between March 1, 2020 and April 19, 2020 (in MU)
Sources: Daily Reports; POSOCO; PRS.
Finances of the power sector to be severely impacted
Power distribution companies (discoms) buy power from generation companies and supply it to consumers. In India, most of the discoms are state-owned utilities. One of the key concerns in the Indian power sector has been the poor financial health of its discoms. The discoms have had high levels of debt and have been running losses. The debt problem was partly addressed under the UDAY scheme as state governments took over 75% of the debt of state-run discoms (around 2.1 lakh crore in two years 2015-16 and 2016-17). However, discoms have continued to register losses owing to underpricing of electricity tariff for some consumer segments, and other forms of technical and commercial losses. Outstanding dues of discoms towards power generation companies have also been increasing, indicating financial stress in some discoms. At the end of February 2020, the total outstanding dues of discoms to generation companies stood at Rs 92,602 crore.
Due to the lockdown and its further impact in the near term, the financial situation of discoms is likely to be aggravated. This will also impact other entities in the value chain including generation companies and their fuel suppliers. This may lead to reduced availability of working capital for these entities and an increase in the risk of NPAs in the sector. Note that, as of February 2020, the power sector has the largest share in the deployment of domestic bank credit among industries (Rs 5.4 lakh crore, 19.3% of total).
Following are some of the factors which have impacted the financial situation during the lockdown:
Reduced cross-subsidy: In most states, the electricity tariff for domestic and agriculture consumers is lower than the actual cost of supply. Along with the subsidy by the state governments, this gap in revenue is partly compensated by charging industrial and commercial consumers at a higher rate. Hence, industrial and commercial segments cross-subsidise the power consumption by domestic and agricultural consumers.
The lockdown has led to a halt on commercial and industrial activities while people are staying indoors. This has led to a situation where the demand from the consumer segments who cross-subsidise has decreased while the demand from consumer segments who are cross-subsidised has increased. Due to this, the gap between revenue realised by discoms and cost of supply will widen, leading to further losses for discoms. States may choose to bridge this gap by providing a higher subsidy.
Moratorium to consumers: To mitigate the financial hardship of citizens due to COVID-19, some states such as Rajasthan, Uttar Pradesh, and Goa, among others, have provided consumers with a moratorium for payment of electricity bills. At the same time, the discoms are required to continue supplying electricity. This will mean that the return for the supply made in March and April will be delayed, leading to lesser cash in hand for discoms.
Some state governments such as Bihar also announced a reduction in tariff for domestic and agricultural consumers. Although, the reduction in tariff will be compensated to discoms by government subsidy.
Constraints with government finances: The revenue collection of states has been severely impacted as economic activities have come to a halt. Further, the state governments are directing their resources for funding relief measures such as food distribution, direct cash transfers, and healthcare. This may adversely affect or delay the subsidy transfer to discoms.
The UDAY scheme also requires states to progressively fund greater share in losses of discoms from their budgetary resources (10% in 2018-19, 25% in 2019-20, and 50% in 2020-21). As losses of discoms may widen due to the above-mentioned factors, the state government’s financial burden is likely to increase.
Capacity addition may be adversely impacted
As per the National Electricity Plan, India’s total capacity addition target is around 176 GW for 2017-2022. This comprises of 118 GW from renewable sources, 6.8 GW from hydro sources, and 6.4 GW from coal (apart from 47.8 GW of coal-based power projects already in various stages of production as of January 2018).
India has set a goal of installing 175 GW of Renewable Power Capacity by 2022 as part of its climate change commitments (86 GW has been installed as of January 2020). In January 2020, the Parliamentary Standing Committee on Energy observed that India could only install 82% and 55% of its annual renewable energy capacity addition targets in 2017-18 and 2018-19. As of January 2020, 67% of the target has been achieved for 2019-20.
Due to the impact of COVID-19, the capacity addition targets for various sources is likely to be adversely impacted in the short run as:
construction activities were stopped during the lockdown and will take some time to return to normal,
disruption in the global supply chain may lead to difficulties with the availability of key components leading to delay in execution of projects, for instance, for solar power plants, solar PV modules are mainly imported from China, and
reduced revenue for companies due to weak demand will leave companies with less capacity left for capital expenditure.
Key reforms likely to be delayed
Following are some of the important reforms anticipated in 2020-21 which may get delayed due to the developing situation:
The real-time market for electricity: The real-time market for electricity was to be operationalised from April 1, 2020. However, the lockdown has led to delay in completion of testing and trial runs. The revised date for implementation is now June 1, 2020.
UDAY 2.0/ADITYA: A new scheme for the financial turnaround of discoms was likely to come this year. The scheme would have provided for the installation of smart meters and incentives for rationalisation of the tariff, among other things. It remains to be seen what this scheme would be like since the situation with government finances is also going to worsen due to anticipated economic slowdown.
Auction of coal blocks for commercial mining: The Coal Ministry has been considering auction of coal mines for commercial mining this year. 100% FDI has been allowed in the coal mining activity for commercial sale of coal to attract foreign players. However, the global economic slowdown may mean that the auctions may not generate enough interest from foreign as well as domestic players.
For a detailed analysis of the Indian Power Sector, please see here. For details on the number of daily COVID-19 cases in the country and across states, please see here. For details on the major COVID-19 related notifications released by the centre and the states, please see here.
So far, both Houses of Parliament have been witnessing disruptions. At the beginning of the session, 23 Bills were listed for passage, and 20 were listed for introduction. Two weeks in, one Bill has been passed by both Houses, and three others by Lok Sabha. These include Bills dealing with the re-haul of consumer protection laws, regulation of surrogacy, and recognition of transgender persons. Six Bills have been introduced. These include three Bills which replace the Ordinances currently in force, and a Bill to regulate dam safety. In this blog, we discuss the key features of some of these Bills.
Enhancing rights of consumers
The Consumer Protection Bill, 2018 replaces the Consumer Protection Act, 1986. It was introduced in view of the significant changes in the consumer market landscape since the 1986 Act. It introduces several new provisions such as enabling consumers to make product liability claims for an injury or harm caused to them, nullifying unfair contracts which impact consumer interests (such as contracts which charge excessive security deposits), and imposing penalties for false and misleading advertisements on manufacturers, as well as on the endorsers of such advertisements.
The Bill also sets up Consumer Dispute Redressal Commissions (or courts) at the district, state, and national level, to hear complaints on matters related to deficiencies in services or defects in goods. While these Commissions are also present under the 1986 Act, the Bill increases their pecuniary jurisdiction: District Commissions will hear complaints with a value of up to one crore rupees; State Commissions between one and ten crore rupees; and National Commission above 10 crore rupees. The Bill also sets up a regulatory body known as the Central Consumer Protection Authority. This Authority can take certain actions to protect the rights of consumers as a class such as passing orders to recall defective goods from the market, and imposing penalties for false and misleading advertisements.
Recognising transgender persons and their rights
Last week, Lok Sabha also passed the Transgender Bill, 2018. This Bill seeks to recognise transgender persons, confers certain rights and entitlements on them related to education, employment, and health, and carves out welfare measures for their benefit. The Bill defines a transgender person as one whose gender does not match the gender assigned at birth. It includes trans-men and trans-women, persons with intersex variations, gender-queers, and includes persons having such socio-cultural identities as kinnar, hijra, aravani, and jogta. The Bill requires every establishment to designate one person as a complaint officer to act on complaints received under the Bill.
The Bill provides that a transgender person will have the right to self-perceived gender identity. Further, it also provides for a screening process to obtain a Certificate of Identity, certifying the person as ‘transgender’. This implies that a transgender person may be allowed to self-identify as transgender individual, but at the same time they must also undergo the screening process to get certified as a transgender. Therefore, it is unclear how these two provisions of self-identification and an external screening process will reconcile with each other.
Regulating surrogacy and overhauling the Medical Council of India
The Surrogacy Bill, 2017 which regulates altruistic surrogacy and prohibits commercial surrogacy was also passed in Lok Sabha. Surrogacy is a process where an intending couple commissions an eligible woman to carry their child. In an altruistic surrogacy, the surrogate mother is not given any monetary benefit or reward, and the arrangement only covers her medical expenses and health insurance. The Bill sets out certain conditions for both the intending couple and the surrogate mother to be eligible for surrogacy. The intending couple must be Indian citizens, be married for at least five years, and at least one of them must be infertile. The surrogate mother must be a close relative of the couple, must be married and must have had a child of her own. Further, a surrogate mother cannot provide her own gametes for surrogacy.
The surrogate mother has been given certain rights with regard to the procedure of surrogacy. These include requiring her written consent to abort the surrogate child, and allowing her to withdraw from the surrogacy at any time before the embryo is implanted in her womb.
Another key Bill which was listed for passage in Lok Sabha this session but could not be taken up is the National Medical Commission Bill, 2017 (NMC Bill). Several amendments to this Bill were introduced in Lok Sabha last week. The NMC Bill seeks to replace the Medical Council of India, with a National Medical Commission. It introduces a common final year undergraduate medical examination called the National Exit Test which will also grant the license to practice medicine. Only medical students graduating from a medical institute which is an institute of national importance will be exempted from qualifying this National Exit Test. The Bill also gives the NMC the power to frame guidelines to decide the fees of up to 50% of seats in private medical colleges and deemed universities. The NMC may also grant limited license to certain mid-level practitioners connected with the medical profession to practice medicine. The qualifying criteria for such mid-level practitioners will be determined through regulations, and they may prescribe specified medicines in primary and preventive healthcare.
Regulating dam safety
The Dam Safety Bill, 2018 was introduced in Lok Sabha and applies to all specified dams across the country. These are dams with: (i) height more than 15 metres, or (ii) height between 10 metres to 15 metres and subject to certain additional design and structural conditions. It seeks to provide for the surveillance, inspection, operation and maintenance of specified dams for prevention of dam failure related disasters. It creates authorities at the national and state level to formulate policies and regulations on dam safety and implement them. It also puts certain obligations on dam owners by requiring them to provide a dam safety unit in each dam, among other things.
When the Bill was being introduced, few opposition members raised objections on the grounds of Parliament’s legislative competence to make a law on dam safety which applies to all states. They gave the example of the previous Dam Safety Bill, 2010, which applied only to the states of Andhra Pradesh and West Bengal who had adopted resolutions requiring Parliament to pass a law on dam safety.
So far the winter session has seen poor productivity with Lok Sabha working for 14% of its scheduled time, and Rajya Sabha for 5%. This is one of the least productive sessions of the 16th Lok Sabha. This is also the last major session before the dissolution of the 16th Lok Sabha. Both Houses will meet tomorrow after the Christmas break. With a packed legislative agenda, it is essential for Parliament to function in order to discuss and deliberate the Bills listed. However, with a limited number of sitting days available in the ongoing session and continued disruptions, it remains to be seen if Parliament will be able to achieve its legislative agenda.
- This post is a modified version of an article published by The Wire on December 26, 2018.