The central government has enforced a nation-wide lockdown between March 25 and May 3 as part of its measures to contain the spread of COVID-19. During the lockdown, several restrictions have been placed on the movement of individuals and economic activities have come to a halt barring the activities related to essential goods and services. The restrictions are being relaxed in less affected areas in a limited manner since April 20. In this blog, we look at how the lockdown has impacted the demand and supply of electricity and what possible repercussions its prolonged effect may have on the power sector.
Power supply saw a decrease of 25% during the lockdown (year-on-year)
As electricity cannot be stored in large amount, the power generation and supply for a given day are planned based on the forecast for demand. The months of January and February in 2020 had seen an increase of 3% and 7% in power supply, respectively as compared to 2019 (year-on-year). In comparison, the power supply saw a decrease of 3% between March 1 and March 24. During the lockdown between March 24 and April 19, the total power supply saw a decrease of about 25% (year-on-year).
Figure 1: % change in power supply position between March 1 and April 19 (Y-o-Y from 2019 to 2020)
Sources: Daily Reports; POSOCO; PRS.
If we look at the consumption pattern by consumer category, in 2018-19, 41% of total electricity consumption was for industrial purposes, followed by 25% for domestic and 18% for agricultural purposes. As the lockdown has severely reduced the industrial and commercial activities in the country, these segments would have seen a considerable decline in demand for electricity. However, note that the domestic demand may have seen an uptick as people are staying indoors.
Figure 2: Power consumption by consumer segment in 2018-19
Sources: Central Electricity Authority; PRS.
Electricity demand may continue to be subdued over the next few months. At this point, it is unclear that when lockdown restrictions are eased, how soon will economic activities return to pre COVID-19 levels. India’s growth projections also highlight a slowdown in the economy in 2020 which will further impact the demand for electricity. On April 16, the International Monetary Fund has slashed its projection for India’s GDP growth in 2020 from 5.8% to 1.9%.
A nominal increase in energy and peak deficit levels
As power sector related operations have been classified as essential services, the plant operations and availability of fuel (primarily coal) have not been significantly constrained. This can be observed with the energy deficit and peak deficit levels during the lockdown period which have remained at a nominal level. Energy deficit indicates the shortfall in energy supply against the demand during the day. The average energy deficit between March 25 and April 19 has been 0.42% while the corresponding figure was 0.33% between March 1 and March 24. Similarly, the average peak deficit between March 25 and April 19 has been 0.56% as compared to 0.41% between March 1 and March 24. Peak deficit indicates the shortfall in supply against demand during highest consumption period in a day.
Figure 3: Energy deficit and peak deficit between March 1, 2020 and April 19, 2020 (in %)
Sources: Daily Reports; POSOCO; PRS.
Coal stock with power plants increases
Coal is the primary source of power generation in the country (~71% in March 2020). During the lockdown period, the coal stock with coal power plants has seen an increase. As of April 19, total coal-stock with the power plants in the country (in days) has risen to 29 days as compared to 24 days on March 24. This indicates that the supply of coal has not been constrained during the lockdown, at least to the extent of meeting the requirements of power plants.
Energy mix changes during the lockdown, power generation from coal impacted
During the lockdown, power generation has been adjusted to compensate for reduced consumption, Most of this reduction in consumption has been adjusted by reduced coal power generation. As can be seen in Table 1, coal power generation reduced from an average of 2,511 MU between March 1 and March 24 to 1,873 MU between March 25 and April 19 (about 25%). As a result, the contribution of coal in total power generation reduced from an average of 72.5% to 65.6% between these two periods.
Table 1: Energy Mix during March 1-April 19, 2020
Sources: Daily Reports; POSOCO; PRS.
This shift may be happening due to various reasons including: (i) renewable energy sources (solar, wind, and small hydro) have MUST RUN status, i.e., the power generated by them has to be given the highest priority by distribution companies, and (ii) running cost of renewable power plants is lower as compared to thermal power plants.
This suggests that if growth in electricity demand were to remain weak, the adverse impact on the coal power plants could be more as compared to other power generation sources. This will also translate into weak demand for coal in the country as almost 87% of the domestic coal production is used by the power sector. Note that the plant load factor (PLF) of the thermal power plants has seen a considerable decline over the years, decreasing from 77.5% in 2009-10 to 56.4% in 2019-20. Low PLF implies that coal plants have been lying idle. Coal power plants require significant fixed costs, and they incur such costs even when the plant is lying idle. The declining capacity utilisation augmented by a weaker demand will undermine the financial viability of these plants further.
Figure 4: Power generation from coal between March 1, 2020 and April 19, 2020 (in MU)
Sources: Daily Reports; POSOCO; PRS.
Finances of the power sector to be severely impacted
Power distribution companies (discoms) buy power from generation companies and supply it to consumers. In India, most of the discoms are state-owned utilities. One of the key concerns in the Indian power sector has been the poor financial health of its discoms. The discoms have had high levels of debt and have been running losses. The debt problem was partly addressed under the UDAY scheme as state governments took over 75% of the debt of state-run discoms (around 2.1 lakh crore in two years 2015-16 and 2016-17). However, discoms have continued to register losses owing to underpricing of electricity tariff for some consumer segments, and other forms of technical and commercial losses. Outstanding dues of discoms towards power generation companies have also been increasing, indicating financial stress in some discoms. At the end of February 2020, the total outstanding dues of discoms to generation companies stood at Rs 92,602 crore.
Due to the lockdown and its further impact in the near term, the financial situation of discoms is likely to be aggravated. This will also impact other entities in the value chain including generation companies and their fuel suppliers. This may lead to reduced availability of working capital for these entities and an increase in the risk of NPAs in the sector. Note that, as of February 2020, the power sector has the largest share in the deployment of domestic bank credit among industries (Rs 5.4 lakh crore, 19.3% of total).
Following are some of the factors which have impacted the financial situation during the lockdown:
Reduced cross-subsidy: In most states, the electricity tariff for domestic and agriculture consumers is lower than the actual cost of supply. Along with the subsidy by the state governments, this gap in revenue is partly compensated by charging industrial and commercial consumers at a higher rate. Hence, industrial and commercial segments cross-subsidise the power consumption by domestic and agricultural consumers.
The lockdown has led to a halt on commercial and industrial activities while people are staying indoors. This has led to a situation where the demand from the consumer segments who cross-subsidise has decreased while the demand from consumer segments who are cross-subsidised has increased. Due to this, the gap between revenue realised by discoms and cost of supply will widen, leading to further losses for discoms. States may choose to bridge this gap by providing a higher subsidy.
Moratorium to consumers: To mitigate the financial hardship of citizens due to COVID-19, some states such as Rajasthan, Uttar Pradesh, and Goa, among others, have provided consumers with a moratorium for payment of electricity bills. At the same time, the discoms are required to continue supplying electricity. This will mean that the return for the supply made in March and April will be delayed, leading to lesser cash in hand for discoms.
Some state governments such as Bihar also announced a reduction in tariff for domestic and agricultural consumers. Although, the reduction in tariff will be compensated to discoms by government subsidy.
Constraints with government finances: The revenue collection of states has been severely impacted as economic activities have come to a halt. Further, the state governments are directing their resources for funding relief measures such as food distribution, direct cash transfers, and healthcare. This may adversely affect or delay the subsidy transfer to discoms.
The UDAY scheme also requires states to progressively fund greater share in losses of discoms from their budgetary resources (10% in 2018-19, 25% in 2019-20, and 50% in 2020-21). As losses of discoms may widen due to the above-mentioned factors, the state government’s financial burden is likely to increase.
Capacity addition may be adversely impacted
As per the National Electricity Plan, India’s total capacity addition target is around 176 GW for 2017-2022. This comprises of 118 GW from renewable sources, 6.8 GW from hydro sources, and 6.4 GW from coal (apart from 47.8 GW of coal-based power projects already in various stages of production as of January 2018).
India has set a goal of installing 175 GW of Renewable Power Capacity by 2022 as part of its climate change commitments (86 GW has been installed as of January 2020). In January 2020, the Parliamentary Standing Committee on Energy observed that India could only install 82% and 55% of its annual renewable energy capacity addition targets in 2017-18 and 2018-19. As of January 2020, 67% of the target has been achieved for 2019-20.
Due to the impact of COVID-19, the capacity addition targets for various sources is likely to be adversely impacted in the short run as:
construction activities were stopped during the lockdown and will take some time to return to normal,
disruption in the global supply chain may lead to difficulties with the availability of key components leading to delay in execution of projects, for instance, for solar power plants, solar PV modules are mainly imported from China, and
reduced revenue for companies due to weak demand will leave companies with less capacity left for capital expenditure.
Key reforms likely to be delayed
Following are some of the important reforms anticipated in 2020-21 which may get delayed due to the developing situation:
The real-time market for electricity: The real-time market for electricity was to be operationalised from April 1, 2020. However, the lockdown has led to delay in completion of testing and trial runs. The revised date for implementation is now June 1, 2020.
UDAY 2.0/ADITYA: A new scheme for the financial turnaround of discoms was likely to come this year. The scheme would have provided for the installation of smart meters and incentives for rationalisation of the tariff, among other things. It remains to be seen what this scheme would be like since the situation with government finances is also going to worsen due to anticipated economic slowdown.
Auction of coal blocks for commercial mining: The Coal Ministry has been considering auction of coal mines for commercial mining this year. 100% FDI has been allowed in the coal mining activity for commercial sale of coal to attract foreign players. However, the global economic slowdown may mean that the auctions may not generate enough interest from foreign as well as domestic players.
For a detailed analysis of the Indian Power Sector, please see here. For details on the number of daily COVID-19 cases in the country and across states, please see here. For details on the major COVID-19 related notifications released by the centre and the states, please see here.
The increasing Non-Performing Assets (NPAs) in the Indian banking sector has recently been the subject of much discussion and scrutiny. Yesterday, the Supreme Court struck down a circular dated February 12, 2018 issued by the Reserve Bank of India (RBI). The RBI circular laid down a revised framework for the resolution of stressed assets. In this blog, we examine the extent of NPAs in India, and recent events leading up to the Supreme Court judgement.
What is the extent and effect of the NPA problem in India?
Banks give loans and advances to borrowers. Based on the performance of the loan, it may be categorised as: (i) a standard asset (a loan where the borrower is making regular repayments), or (ii) a non-performing asset. NPAs are loans and advances where the borrower has stopped making interest or principal repayments for over 90 days.
As of 2018, the total NPAs in the economy stand at Rs 9.6 lakh crore. About 88% of these NPAs are from loans and advances of public sector banks. Banks are required to lend a certain percentage of their loans to priority sectors. These sectors are identified by the RBI and include agriculture, housing, education and small scale industries.[1] In 2018, of the total NPAs, 22% were from priority sector loans, and 78% were from non-priority sector loans.
In the last few years, gross NPAs of banks (as a percentage of total loans) have increased from 2.3% of total loans in 2008 to 9.3% in 2017 (see Figure 1). This indicates that an increasing proportion of a bank’s assets have ceased to generate income for the bank, lowering the bank’s profitability and its ability to grant further credit.
Figure 1: Gross NPAs (% of total loans)
|
Source: Reserve Bank of India; PRS |
What has been done to address the problem of growing NPAs?
The measures taken to resolve and prevent NPAs can broadly be classified into two kinds – first, remedial measures for banks prescribed by the RBI for internal restructuring of stressed assets, and second, legislative means of resolving NPAs under various laws (like the Insolvency and Bankruptcy Code, 2016).
Remedial Measures
Over the years, the RBI has issued various guidelines for banks aimed at the resolution of stressed assets in the economy. These included introduction of certain schemes such as: (i) Strategic Debt Restructuring (which allowed banks to change the management of the defaulting company), and (ii) Joint Lenders’ Forum (where lenders evolved a resolution plan and voted on its implementation). A summary of the various schemes implemented by the RBI is provided in Table 1.
Table 1: Non-legislative loan recovery framework
Sources: RBI scheme guidelines; Economic Survey 2016-17; PRS. |
Legislative Measures
In June 2017, an internal advisory committee of RBI identified 500 defaulters with the highest value of NPAs.[8] The committee recommended that 12 largest non-performing accounts, each with outstanding amounts greater than Rs 5,000 crore and totalling 25% of the NPAs of the economy, be referred for resolution under the IBC immediately. Proceedings against the 12 largest defaulters have been initiated under the IBC.
What was the February 12 circular issued by the RBI?
Subsequent to the enactment of the IBC, the RBI put in place a framework for restructuring of stressed assets of over Rs 2,000 crore on or after March 1, 2018. The resolution plan for such restructuring must be unanimously approved by all lenders and implemented within 180 days from the date of the first default. If the plan is not implemented within the stipulated time period, the stressed assets are required to be referred to the NCLT under IBC within 15 days. Further, the framework introduced a provision for early identification and categorisation of stressed assets before they are classified as NPAs.
On what grounds was the RBI circular challenged?
Borrowers whose loans were tagged as NPAs before the release of the circular recently crossed the 180-day deadline for internal resolution by banks. Some of these borrowers, including various power producers and sugar mills, had appealed against the RBI circular in various High Courts. A two-judge bench of the Allahabad High Court ruled in favour of the RBI’s powers to issue these guidelines, and refused to grant interim relief to power producers from being taken to the NCLT for bankruptcy. These batch of petitions against the circular were transferred to the Supreme Court, which issued an order in September 2018 to maintain status quo on the same.
What did the Supreme Court order?
The Court held the circular issued by RBI was outside the scope of the power given to it under Article 35AA of the Banking Regulation (Amendment) Act, 2017. The Court reasoned that Section 35AA was proposed by the 2017 Act to authorise the RBI to issues directions only in relation to specific cases of default by specific debtors. It held that the RBI circular issued directions in relation to debtors in general and this was outside their scope of power. The court also held that consequently all IBC proceedings initiated under the RBI circular are quashed.
During the proceedings, various companies argued that the RBI circular applies to all corporate debtors alike, without looking into each individual’s sectors problems and attempting to solve them. For instance, several power companies provided sector specific reasons for delay in payment of bank dues. The reasons included: (i) cancellation of coal blocks by the SC leading to non-availability of fuel, (ii) lack of enough power purchase agreements by states, (iii) non-payment of dues by DISCOMs, and (iv) delays in project implementation leading to cost overruns. Note that, in its 40th report, the Parliamentary Standing Committee on Energy analysed the impact of the RBI circular on the power sector and noted that the ‘one size fits all’ approach of the RBI is erroneous.
[1] ‘Priority Sector Lending – Targets and Classification’ Reserve Bank of India, July 2012, https://rbi.org.in/scripts/NotificationUser.aspx?Id=7460&Mode=0.
[2] Revised Guidelines on Corporate Debt Restructuring Mechanism, Reserve Bank of India, https://www.rbi.org.in/upload/notification/pdfs/67158.pdf.
[3] ‘Framework for Revitalising Distressed Assets in the Economy – Guidelines on Joint Lenders’ Forum (JLF) and Corrective Action Plan (CAP)’, Reserve Bank of India, February 26, 2016, https://www.rbi.org.in/scripts/NotificationUser.aspx?Id=8754&Mode=0.
[4] Timelines for Stressed Assets, Press Release, Reserve Bank of India, May 5, 2017, https://www.rbi.org.in/Scripts/NotificationUser.aspx?Id=10957&Mode=0.
[5] Flexible Structuring of Long Term Project Loans to Infrastructure and Core Industries, RBI, July 15, 2014, https://www.rbi.org.in/scripts/NotificationUser.aspx?Id=9101&Mode=0.
[6] Chapter 4, The Economic Survey 2016-17, http://unionbudget.nic.in/es2016-17/echap04.pdf.
[7] ‘RBI introduces a ‘Scheme for Sustainable Structuring of Stressed Assets’’ Press Release, Reserve Bank of India, June 13, 2016, https://www.rbi.org.in/Scripts/BS_PressReleaseDisplay.aspx?prid=37210.
[8] RBI identifies Accounts for Reference by Banks under the Insolvency and Bankruptcy Code (IBC), Reserve Bank of India, June 13, 2017, https://www.rbi.org.in/scripts/BS_PressReleaseDisplay.aspx?prid=40743