The central government has enforced a nation-wide lockdown between March 25 and May 3 as part of its measures to contain the spread of COVID-19.  During the lockdown, several restrictions have been placed on the movement of individuals and economic activities have come to a halt barring the activities related to essential goods and services. The restrictions are being relaxed in less affected areas in a limited manner since April 20.  In this blog, we look at how the lockdown has impacted the demand and supply of electricity and what possible repercussions its prolonged effect may have on the power sector. 

Power supply saw a decrease of 25% during the lockdown (year-on-year)

As electricity cannot be stored in large amount, the power generation and supply for a given day are planned based on the forecast for demand.  The months of January and February in 2020 had seen an increase of 3% and 7% in power supply, respectively as compared to 2019 (year-on-year).  In comparison, the power supply saw a decrease of 3% between March 1 and March 24.  During the lockdown between March 24 and April 19, the total power supply saw a decrease of about 25% (year-on-year).

Figure 1: % change in power supply position between March 1 and April 19 (Y-o-Y from 2019 to 2020)

Sources: Daily Reports; POSOCO; PRS.

If we look at the consumption pattern by consumer category, in 2018-19, 41% of total electricity consumption was for industrial purposes, followed by 25% for domestic and 18% for agricultural purposes.  As the lockdown has severely reduced the industrial and commercial activities in the country, these segments would have seen a considerable decline in demand for electricity. However, note that the domestic demand may have seen an uptick as people are staying indoors.

Figure 2: Power consumption by consumer segment in 2018-19

Sources: Central Electricity Authority; PRS.

Electricity demand may continue to be subdued over the next few months. At this point, it is unclear that when lockdown restrictions are eased, how soon will economic activities return to pre COVID-19 levels. India’s growth projections also highlight a slowdown in the economy in 2020 which will further impact the demand for electricity.  On April 16, the International Monetary Fund has slashed its projection for India’s GDP growth in 2020 from 5.8% to 1.9%.

A nominal increase in energy and peak deficit levels

As power sector related operations have been classified as essential services, the plant operations and availability of fuel (primarily coal) have not been significantly constrained. This can be observed with the energy deficit and peak deficit levels during the lockdown period which have remained at a nominal level.  Energy deficit indicates the shortfall in energy supply against the demand during the day.  The average energy deficit between March 25 and April 19 has been 0.42% while the corresponding figure was 0.33% between March 1 and March 24. Similarly, the average peak deficit between March 25 and April 19 has been 0.56% as compared to 0.41% between March 1 and March 24.  Peak deficit indicates the shortfall in supply against demand during highest consumption period in a day.

Figure 3: Energy deficit and peak deficit between March 1, 2020 and April 19, 2020 (in %)

Sources: Daily Reports; POSOCO; PRS.

Coal stock with power plants increases

Coal is the primary source of power generation in the country (~71% in March 2020).  During the lockdown period, the coal stock with coal power plants has seen an increase.  As of April 19, total coal-stock with the power plants in the country (in days) has risen to 29 days as compared to 24 days on March 24. This indicates that the supply of coal has not been constrained during the lockdown, at least to the extent of meeting the requirements of power plants.

Energy mix changes during the lockdown, power generation from coal impacted

During the lockdown, power generation has been adjusted to compensate for reduced consumption, Most of this reduction in consumption has been adjusted by reduced coal power generation. As can be seen in Table 1, coal power generation reduced from an average of 2,511 MU between March 1 and March 24 to 1,873 MU between March 25 and April 19 (about 25%).  As a result, the contribution of coal in total power generation reduced from an average of 72.5% to 65.6% between these two periods.

Table 1: Energy Mix during March 1-April 19, 2020

Sources: Daily Reports; POSOCO; PRS.

This shift may be happening due to various reasons including: (i) renewable energy sources (solar, wind, and small hydro) have MUST RUN status, i.e., the power generated by them has to be given the highest priority by distribution companies, and (ii) running cost of renewable power plants is lower as compared to thermal power plants.

This suggests that if growth in electricity demand were to remain weak, the adverse impact on the coal power plants could be more as compared to other power generation sources.  This will also translate into weak demand for coal in the country as almost 87% of the domestic coal production is used by the power sector.  Note that the plant load factor (PLF) of the thermal power plants has seen a considerable decline over the years, decreasing from 77.5% in 2009-10 to 56.4% in 2019-20. Low PLF implies that coal plants have been lying idle.  Coal power plants require significant fixed costs, and they incur such costs even when the plant is lying idle. The declining capacity utilisation augmented by a weaker demand will undermine the financial viability of these plants further.

Figure 4: Power generation from coal between March 1, 2020 and April 19, 2020 (in MU)

Sources: Daily Reports; POSOCO; PRS.

Finances of the power sector to be severely impacted

Power distribution companies (discoms) buy power from generation companies and supply it to consumers.  In India, most of the discoms are state-owned utilities.  One of the key concerns in the Indian power sector has been the poor financial health of its discoms.  The discoms have had high levels of debt and have been running losses. The debt problem was partly addressed under the UDAY scheme as state governments took over 75% of the debt of state-run discoms (around 2.1 lakh crore in two years 2015-16 and 2016-17).  However, discoms have continued to register losses owing to underpricing of electricity tariff for some consumer segments, and other forms of technical and commercial losses.  Outstanding dues of discoms towards power generation companies have also been increasing, indicating financial stress in some discoms. At the end of February 2020, the total outstanding dues of discoms to generation companies stood at Rs 92,602 crore.

Due to the lockdown and its further impact in the near term, the financial situation of discoms is likely to be aggravated. This will also impact other entities in the value chain including generation companies and their fuel suppliers. This may lead to reduced availability of working capital for these entities and an increase in the risk of NPAs in the sector.  Note that, as of February 2020, the power sector has the largest share in the deployment of domestic bank credit among industries (Rs 5.4 lakh crore, 19.3% of total).

Following are some of the factors which have impacted the financial situation during the lockdown:

  • Reduced cross-subsidy: In most states, the electricity tariff for domestic and agriculture consumers is lower than the actual cost of supply. Along with the subsidy by the state governments, this gap in revenue is partly compensated by charging industrial and commercial consumers at a higher rate.  Hence, industrial and commercial segments cross-subsidise the power consumption by domestic and agricultural consumers.

  • The lockdown has led to a halt on commercial and industrial activities while people are staying indoors.  This has led to a situation where the demand from the consumer segments who cross-subsidise has decreased while the demand from consumer segments who are cross-subsidised has increased.  Due to this, the gap between revenue realised by discoms and cost of supply will widen, leading to further losses for discoms.  States may choose to bridge this gap by providing a higher subsidy.

  • Moratorium to consumers: To mitigate the financial hardship of citizens due to COVID-19, some states such as RajasthanUttar Pradesh, and Goa, among others, have provided consumers with a moratorium for payment of electricity bills. At the same time, the discoms are required to continue supplying electricity. This will mean that the return for the supply made in March and April will be delayed, leading to lesser cash in hand for discoms.

  • Some state governments such as Bihar also announced a reduction in tariff for domestic and agricultural consumers. Although, the reduction in tariff will be compensated to discoms by government subsidy.

  • Constraints with government finances: The revenue collection of states has been severely impacted as economic activities have come to a halt. Further, the state governments are directing their resources for funding relief measures such as food distribution, direct cash transfers, and healthcare. This may adversely affect or delay the subsidy transfer to discoms.

  • The UDAY scheme also requires states to progressively fund greater share in losses of discoms from their budgetary resources (10% in 2018-19, 25% in 2019-20, and 50% in 2020-21).  As losses of discoms may widen due to the above-mentioned factors, the state government’s financial burden is likely to increase.

Capacity addition may be adversely impacted

As per the National Electricity Plan,  India’s total capacity addition target is around 176 GW for 2017-2022.  This comprises of 118 GW from renewable sources, 6.8 GW from hydro sources, and 6.4 GW from coal (apart from 47.8 GW of coal-based power projects already in various stages of production as of January 2018).  

India has set a goal of installing 175 GW of Renewable Power Capacity by 2022 as part of its climate change commitments (86 GW has been installed as of January 2020).  In January 2020, the Parliamentary Standing Committee on Energy observed that India could only install 82% and 55% of its annual renewable energy capacity addition targets in 2017-18 and 2018-19. As of January 2020, 67% of the target has been achieved for 2019-20.

Due to the impact of COVID-19, the capacity addition targets for various sources is likely to be adversely impacted in the short run as:

  • construction activities were stopped during the lockdown and will take some time to return to normal,

  • disruption in the global supply chain may lead to difficulties with the availability of key components leading to delay in execution of projects, for instance, for solar power plants, solar PV modules are mainly imported from China, and

  • reduced revenue for companies due to weak demand will leave companies with less capacity left for capital expenditure.

Key reforms likely to be delayed

Following are some of the important reforms anticipated in 2020-21 which may get delayed due to the developing situation:

  • The real-time market for electricity: The real-time market for electricity was to be operationalised from April 1, 2020. However, the lockdown has led to delay in completion of testing and trial runs. The revised date for implementation is now June 1, 2020.

  • UDAY 2.0/ADITYA: A new scheme for the financial turnaround of discoms was likely to come this year. The scheme would have provided for the installation of smart meters and incentives for rationalisation of the tariff, among other things. It remains to be seen what this scheme would be like since the situation with government finances is also going to worsen due to anticipated economic slowdown. 

  • Auction of coal blocks for commercial mining: The Coal Ministry has been considering auction of coal mines for commercial mining this year. 100% FDI has been allowed in the coal mining activity for commercial sale of coal to attract foreign players. However, the global economic slowdown may mean that the auctions may not generate enough interest from foreign as well as domestic players.

For a detailed analysis of the Indian Power Sector, please see here.  For details on the number of daily COVID-19 cases in the country and across states, please see here.  For details on the major COVID-19 related notifications released by the centre and the states, please see here.  

Several Rajya Sabha seats go to elections this year. The President and the Vice-President are also due to be elected by August. We analyse the impact of the recent State Assembly elections on the composition of the Rajya Sabha and the outcome of the Presidential polls. Rajya Sabha - How will its composition change? Since Rajya Sabha members are elected by the elected members of State Legislative Assemblies, a change in the composition of State Assemblies can affect the composition of Rajya Sabha.  A total of 61 Rajya Sabha seats are up for election in April and July.  This includes 10 seats from Uttar Pradesh and 1 seat from Uttarakhand. In light of the recent Assembly elections, we work out two scenarios to estimate the composition of Rajya Sabha in 2012. Members of Rajya Sabha are elected through the system of proportional representation by means of the Single Transferable Vote (STV). In an STV election, a candidate is required to achieve a certain minimum number of votes (called the 'quota') to be elected.  (For more details on the STV system, click here) For instance, in the case of Uttar Pradesh (UP) 10 Rajya Sabha seats go to election this year.  Candidates will be elected to these 10 seats by the 403 elected MLAs of the Uttar Pradesh State Assembly.  Each MLA will rank the candidates based on his/ her preference. After successive rounds of elimination, candidates who are able to secure at least 37  {or 403/(10+1) } votes will be declared elected. In the new UP Assembly, Samajwadi  Party (SP) has a total strength of 224 members. As a result, SP can elect at least 6 (or 224/37) Rajya Sabha MPs of its choice.  BSP's strength of 80 will allow it to elect 2 (or 80/37) MPs to Rajya Sabha. Similarily, the BJP with a strength of 47 MLAs can have one candidate of its choice elected to the Rajya Sabha.  This leaves 1 seat.  The fate of this seat depends on the alliances that may be formed since no other party in UP has 37 or more seats in the Assembly.  If the Congress (28 seats) and RLD (9 seats) join hands, they may be able to elect a candidate of their choice. We build two scenarios which give the likely range of seats for the major coalitions and parties. The actual result will likely fall between these scenarios, depending on alliances for each election. Of the two scenarios, Scenario II is better for the UPA. It is based on the assumption that the UPA is able to put together the necessary support/ alliances to get its candidates elected to seats with indeterminate status.  Scenario I is based on the assumption that the UPA is not able to put together the required support. As a result, the seats in question get allocated to candidates from other parties/ coalitions. (See Notes for the composition of the coalitions) Composition of Rajya Sabha

Party/ Coalition Current composition Scenario I Scenario II
Total seats

245

245

245

UPA

93

95

98

NDA

66

67

65

Left

19

14

14

BSP

18

15

15

SP

5

9

9

BJD

6

8

7

AIADMK

5

5

5

Nominated

7

12

12

Others

21

20

20

Vacant

5

0

0

It appears that there would not be a major change in the composition of the Rajya Sabha. Which party's candidate is likely to become the next President? The next Presidential election will be held in June or July.  The electoral college for the Presidential election consists of the elected members of Lok Sabha, Rajya Sabha and all Legislative Assemblies. Each MP/ MLA’s vote has a pre-determined value based on the population they represent. For instance, an MP's vote has a value of 708, an MLA from UP has a vote value of 208 and an MLA from Sikkim has a vote value of 7. (Note that all MPs, irrespective of the constituency or State they represent, have equal vote value) As is evident, changes in the composition of Assemblies in larger States such as UP can have a major impact on the outcome of the Presidential election. The elections to the office of the President are held through the system of proportional representation by means of STV (same as in the case of Rajya Sabha).  The winning candidate must secure at least 50% of the total value of votes polled.  (For details, refer to this Election Commission document). By this calculation, a candidate will need at least 5,48,507 votes to be elected as the President. If the UPA were to vote as a consolidated block, its vote tally would reach 4,50,555 votes under Scenario II (the one that is favourable for the UPA).  Therefore, the UPA will have to seek alliances if it wants a candidate of its choice to be elected to the office of the President. Scenarios for Presidential elections (figures represent the value of votes available with each party/ coalition)

Party/ Coalition Scenario I Scenario II
UPA

4,48,431

4,50,555

NDA

3,05,328

3,03,912

Left

51,574

51,574

BSP

43,723

43,723

SP

69,651

69,651

BJD

30,923

30,215

AIADMK

36,216

36,216

Others

1,11,166

1,11,166

Total

10,97,012

10,97,012

Minimum required to be elected

5,48,507

5,48,507

What about the Vice-President? Elections to the office of the Vice-President (VP) will be held in July or August.  The electoral college will consist of all members of Lok Sabha and Rajya Sabha (i.e. both elected and nominated). Unlike the Presidential elections, all votes will have an equal value of one. Like the President, the VP is also elected through the system of proportional representation by means of STV.  The winning candidate must secure at least 50% of the total value of votes polled. Presently, two seats are vacant in the Lok Sabha. If we exclude these from our analysis, we find that a candidate will need at least 395 votes to be elected as the VP.  Under our best case scenario, the UPA holds 363 votes in the forthcoming VP elections. As is the case with Presidential elections, the UPA will have to seek alliances to get a candidate of its choice elected to the office of the Vice-President. Scenarios for VP elections (figures represent the value of votes available with each party/ coalition)

Party/ Coalition

Scenario I

Scenario II

UPA

360

363

NDA

216

214

Left

38

38

BSP

36

36

SP

31

31

BJD

22

21

AIADMK

14

14

Nominated

14

14

Others

57

57

Total

788

788

Minimum required to be elected

395

395

Notes: [1] UPA: Congress, Trinamool, DMK, NCP,Rashtriya Lok Dal, J&K National Conference, Muslim League Kerala State Committee, Kerala Congress (M), All India Majlis-e-Ittehadul Muslimeen, Sikkim Democratic Front, Praja Rajyam Party, Viduthalai Chiruthaigal Katchi [2] NDA: BJP, JD(U), Shiv Sena, Shiromani Akali Dal [3] Left: CPI(M), CPI, Revolutionary Socialist Party,All India Forward Bloc