Applications for the LAMP Fellowship 2025-26 will open on December 1, 2024. Sign up here to be notified when applications open.

The central government has enforced a nation-wide lockdown between March 25 and May 3 as part of its measures to contain the spread of COVID-19.  During the lockdown, several restrictions have been placed on the movement of individuals and economic activities have come to a halt barring the activities related to essential goods and services. The restrictions are being relaxed in less affected areas in a limited manner since April 20.  In this blog, we look at how the lockdown has impacted the demand and supply of electricity and what possible repercussions its prolonged effect may have on the power sector. 

Power supply saw a decrease of 25% during the lockdown (year-on-year)

As electricity cannot be stored in large amount, the power generation and supply for a given day are planned based on the forecast for demand.  The months of January and February in 2020 had seen an increase of 3% and 7% in power supply, respectively as compared to 2019 (year-on-year).  In comparison, the power supply saw a decrease of 3% between March 1 and March 24.  During the lockdown between March 24 and April 19, the total power supply saw a decrease of about 25% (year-on-year).

Figure 1: % change in power supply position between March 1 and April 19 (Y-o-Y from 2019 to 2020)

Sources: Daily Reports; POSOCO; PRS.

If we look at the consumption pattern by consumer category, in 2018-19, 41% of total electricity consumption was for industrial purposes, followed by 25% for domestic and 18% for agricultural purposes.  As the lockdown has severely reduced the industrial and commercial activities in the country, these segments would have seen a considerable decline in demand for electricity. However, note that the domestic demand may have seen an uptick as people are staying indoors.

Figure 2: Power consumption by consumer segment in 2018-19

Sources: Central Electricity Authority; PRS.

Electricity demand may continue to be subdued over the next few months. At this point, it is unclear that when lockdown restrictions are eased, how soon will economic activities return to pre COVID-19 levels. India’s growth projections also highlight a slowdown in the economy in 2020 which will further impact the demand for electricity.  On April 16, the International Monetary Fund has slashed its projection for India’s GDP growth in 2020 from 5.8% to 1.9%.

A nominal increase in energy and peak deficit levels

As power sector related operations have been classified as essential services, the plant operations and availability of fuel (primarily coal) have not been significantly constrained. This can be observed with the energy deficit and peak deficit levels during the lockdown period which have remained at a nominal level.  Energy deficit indicates the shortfall in energy supply against the demand during the day.  The average energy deficit between March 25 and April 19 has been 0.42% while the corresponding figure was 0.33% between March 1 and March 24. Similarly, the average peak deficit between March 25 and April 19 has been 0.56% as compared to 0.41% between March 1 and March 24.  Peak deficit indicates the shortfall in supply against demand during highest consumption period in a day.

Figure 3: Energy deficit and peak deficit between March 1, 2020 and April 19, 2020 (in %)

Sources: Daily Reports; POSOCO; PRS.

Coal stock with power plants increases

Coal is the primary source of power generation in the country (~71% in March 2020).  During the lockdown period, the coal stock with coal power plants has seen an increase.  As of April 19, total coal-stock with the power plants in the country (in days) has risen to 29 days as compared to 24 days on March 24. This indicates that the supply of coal has not been constrained during the lockdown, at least to the extent of meeting the requirements of power plants.

Energy mix changes during the lockdown, power generation from coal impacted

During the lockdown, power generation has been adjusted to compensate for reduced consumption, Most of this reduction in consumption has been adjusted by reduced coal power generation. As can be seen in Table 1, coal power generation reduced from an average of 2,511 MU between March 1 and March 24 to 1,873 MU between March 25 and April 19 (about 25%).  As a result, the contribution of coal in total power generation reduced from an average of 72.5% to 65.6% between these two periods.

Table 1: Energy Mix during March 1-April 19, 2020

Sources: Daily Reports; POSOCO; PRS.

This shift may be happening due to various reasons including: (i) renewable energy sources (solar, wind, and small hydro) have MUST RUN status, i.e., the power generated by them has to be given the highest priority by distribution companies, and (ii) running cost of renewable power plants is lower as compared to thermal power plants.

This suggests that if growth in electricity demand were to remain weak, the adverse impact on the coal power plants could be more as compared to other power generation sources.  This will also translate into weak demand for coal in the country as almost 87% of the domestic coal production is used by the power sector.  Note that the plant load factor (PLF) of the thermal power plants has seen a considerable decline over the years, decreasing from 77.5% in 2009-10 to 56.4% in 2019-20. Low PLF implies that coal plants have been lying idle.  Coal power plants require significant fixed costs, and they incur such costs even when the plant is lying idle. The declining capacity utilisation augmented by a weaker demand will undermine the financial viability of these plants further.

Figure 4: Power generation from coal between March 1, 2020 and April 19, 2020 (in MU)

Sources: Daily Reports; POSOCO; PRS.

Finances of the power sector to be severely impacted

Power distribution companies (discoms) buy power from generation companies and supply it to consumers.  In India, most of the discoms are state-owned utilities.  One of the key concerns in the Indian power sector has been the poor financial health of its discoms.  The discoms have had high levels of debt and have been running losses. The debt problem was partly addressed under the UDAY scheme as state governments took over 75% of the debt of state-run discoms (around 2.1 lakh crore in two years 2015-16 and 2016-17).  However, discoms have continued to register losses owing to underpricing of electricity tariff for some consumer segments, and other forms of technical and commercial losses.  Outstanding dues of discoms towards power generation companies have also been increasing, indicating financial stress in some discoms. At the end of February 2020, the total outstanding dues of discoms to generation companies stood at Rs 92,602 crore.

Due to the lockdown and its further impact in the near term, the financial situation of discoms is likely to be aggravated. This will also impact other entities in the value chain including generation companies and their fuel suppliers. This may lead to reduced availability of working capital for these entities and an increase in the risk of NPAs in the sector.  Note that, as of February 2020, the power sector has the largest share in the deployment of domestic bank credit among industries (Rs 5.4 lakh crore, 19.3% of total).

Following are some of the factors which have impacted the financial situation during the lockdown:

  • Reduced cross-subsidy: In most states, the electricity tariff for domestic and agriculture consumers is lower than the actual cost of supply. Along with the subsidy by the state governments, this gap in revenue is partly compensated by charging industrial and commercial consumers at a higher rate.  Hence, industrial and commercial segments cross-subsidise the power consumption by domestic and agricultural consumers.

  • The lockdown has led to a halt on commercial and industrial activities while people are staying indoors.  This has led to a situation where the demand from the consumer segments who cross-subsidise has decreased while the demand from consumer segments who are cross-subsidised has increased.  Due to this, the gap between revenue realised by discoms and cost of supply will widen, leading to further losses for discoms.  States may choose to bridge this gap by providing a higher subsidy.

  • Moratorium to consumers: To mitigate the financial hardship of citizens due to COVID-19, some states such as RajasthanUttar Pradesh, and Goa, among others, have provided consumers with a moratorium for payment of electricity bills. At the same time, the discoms are required to continue supplying electricity. This will mean that the return for the supply made in March and April will be delayed, leading to lesser cash in hand for discoms.

  • Some state governments such as Bihar also announced a reduction in tariff for domestic and agricultural consumers. Although, the reduction in tariff will be compensated to discoms by government subsidy.

  • Constraints with government finances: The revenue collection of states has been severely impacted as economic activities have come to a halt. Further, the state governments are directing their resources for funding relief measures such as food distribution, direct cash transfers, and healthcare. This may adversely affect or delay the subsidy transfer to discoms.

  • The UDAY scheme also requires states to progressively fund greater share in losses of discoms from their budgetary resources (10% in 2018-19, 25% in 2019-20, and 50% in 2020-21).  As losses of discoms may widen due to the above-mentioned factors, the state government’s financial burden is likely to increase.

Capacity addition may be adversely impacted

As per the National Electricity Plan,  India’s total capacity addition target is around 176 GW for 2017-2022.  This comprises of 118 GW from renewable sources, 6.8 GW from hydro sources, and 6.4 GW from coal (apart from 47.8 GW of coal-based power projects already in various stages of production as of January 2018).  

India has set a goal of installing 175 GW of Renewable Power Capacity by 2022 as part of its climate change commitments (86 GW has been installed as of January 2020).  In January 2020, the Parliamentary Standing Committee on Energy observed that India could only install 82% and 55% of its annual renewable energy capacity addition targets in 2017-18 and 2018-19. As of January 2020, 67% of the target has been achieved for 2019-20.

Due to the impact of COVID-19, the capacity addition targets for various sources is likely to be adversely impacted in the short run as:

  • construction activities were stopped during the lockdown and will take some time to return to normal,

  • disruption in the global supply chain may lead to difficulties with the availability of key components leading to delay in execution of projects, for instance, for solar power plants, solar PV modules are mainly imported from China, and

  • reduced revenue for companies due to weak demand will leave companies with less capacity left for capital expenditure.

Key reforms likely to be delayed

Following are some of the important reforms anticipated in 2020-21 which may get delayed due to the developing situation:

  • The real-time market for electricity: The real-time market for electricity was to be operationalised from April 1, 2020. However, the lockdown has led to delay in completion of testing and trial runs. The revised date for implementation is now June 1, 2020.

  • UDAY 2.0/ADITYA: A new scheme for the financial turnaround of discoms was likely to come this year. The scheme would have provided for the installation of smart meters and incentives for rationalisation of the tariff, among other things. It remains to be seen what this scheme would be like since the situation with government finances is also going to worsen due to anticipated economic slowdown. 

  • Auction of coal blocks for commercial mining: The Coal Ministry has been considering auction of coal mines for commercial mining this year. 100% FDI has been allowed in the coal mining activity for commercial sale of coal to attract foreign players. However, the global economic slowdown may mean that the auctions may not generate enough interest from foreign as well as domestic players.

For a detailed analysis of the Indian Power Sector, please see here.  For details on the number of daily COVID-19 cases in the country and across states, please see here.  For details on the major COVID-19 related notifications released by the centre and the states, please see here.  

Earlier this month, guidelines for the Swachh Bharat Mission (Gramin) were released by the Ministry of Drinking Water and Sanitation.  Key features of the Swachh Bharat Mission (Gramin), as outlined in the guidelines, are detailed below.  In addition, a brief overview of sanitation levels in the country is provided, along with major schemes of the central government to improve rural sanitation. The Swachh Bharat Mission, launched in October 2014, consists of two sub-missions – the Swachh Bharat Mission (Gramin) (SBM-G), which will be implemented in rural areas, and the Swachh Bharat Mission (Urban), which will be implemented in urban areas.  SBM-G seeks to eliminate open defecation in rural areas by 2019 through improving access to sanitation.  It also seeks to generate awareness to motivate communities to adopt sustainable sanitation practices, and encourage the use of appropriate technologies for sanitation. I. Context Data from the last three Census’, in Table 1, shows that while there has been some improvement in the number of households with toilets; this number remains low in the country, especially in rural areas. Table 1:  Percentage of households with toilets (national)

Year Rural Urban Total
1991 9% 64% 24%
2001 22% 74% 36%
2011 31% 81% 47%

In addition, there is significant variation across states in terms of availability of household toilets in rural areas, as shown in Table 2.  Table 2 also shows the change in percentage of rural households with toilets from 2001 to 2011.  It is evident that the pace of this change has varied across states over the decade. Table 2: Percentage of rural households with toilets

State

2001

2011

% Change

Andhra Pradesh

18

32

14

Arunachal Pradesh

47

53

5

Assam

60

60

0

Bihar

14

18

4

Chhattisgarh

5

15

9

Goa

48

71

23

Gujarat

22

33

11

Haryana

29

56

27

Himachal Pradesh

28

67

39

Jammu and Kashmir

42

39

-3

Jharkhand

7

8

1

Karnataka

17

28

11

Kerala

81

93

12

Madhya Pradesh

9

13

4

Maharashtra

18

38

20

Manipur

78

86

9

Meghalaya

40

54

14

Mizoram

80

85

5

Nagaland

65

69

5

Odisha

8

14

6

Punjab

41

70

30

Rajasthan

15

20

5

Sikkim

59

84

25

Tamil Nadu

14

23

9

Tripura

78

82

4

Uttar Pradesh

19

22

3

Uttarakhand

32

54

23

West Bengal

27

47

20

All India

22

31

9

II. Major schemes of the central government to improve rural sanitation The central government has been implementing schemes to improve access to sanitation in rural areas from the Ist Five Year Plan (1951-56) onwards.  Major schemes of the central government dealing with rural sanitation are outlined below.

Central Rural Sanitation Programme (1986): The Central Rural Sanitation Programme was one of the first schemes of the central government which focussed solely on rural sanitation.  The programme sought to construct household toilets, construct sanitary complexes for women, establish sanitary marts, and ensure solid and liquid waste management.
Total Sanitation Campaign (1999): The Total Sanitation Campaign was launched in 1999 with a greater focus on Information, Education and Communication (IEC) activities in order to make the creation of sanitation facilities demand driven rather than supply driven. Key components of the Total Sanitation Campaign included: (i) financial assistance to rural families below the poverty line for the construction of household toilets, (ii) construction of community sanitary complexes, (iii) construction of toilets in government schools and aganwadis, (iv) funds for IEC activities, (v) assistance to rural sanitary marts, and (vi) solid and liquid waste management.
Nirmal Bharat Abhiyan (2012): In 2012, the Total Sanitation Campaign was replaced by the Nirmal Bharat Abhiyan (NBA), which also focused on the previous elements.  According to the Ministry of Drinking Water and Sanitation, the key shifts in NBA were: (i) a greater focus on coverage for the whole community instead of a focus on individual houses, (ii) the inclusion of certain households which were above the poverty line, and (iii) more funds for IEC activities, with 15% of funds at the district level earmarked for IEC.
Swachh Bharat Mission (Gramin) (2014): Earlier this year, in October, NBA was replaced by Swachh Bharat Mission (Gramin) (SBM-G) which is a sub-mission under Swachh Bharat Mission.  SBM-G also includes the key components of the earlier sanitation schemes such as the funding for the construction of individual household toilets, construction of community sanitary complexes, waste management, and IEC. Key features of SBM-G, and major departures from earlier sanitation schemes, are outlined in the next section.

III. Guidelines for Swachh Bharat Mission (Gramin) The guidelines for SBM-G, released earlier this month, outline the strategy to be adopted for its implementation, funding, and monitoring. Objectives: Key objectives of SBM-G include: (i) improving the quality of life in rural areas through promoting cleanliness and eliminating open defecation by 2019, (ii) motivating communities and panchayati raj institutions to adopt sustainable sanitation practices, (iii) encouraging appropriate technologies for sustainable sanitation, and (iv) developing community managed solid and liquid waste management systems. Institutional framework: While NBA had a four tier implementation mechanism at the state, district, village, and block level, an additional tier has been added for SBM-G, at the national level.  Thus, the implementation mechanisms at the five levels will consist of: (i) National Swachh Bharat Mission (Gramin), (ii) State Swachh Bharat Mission (Gramin), (iii) District Swachh Bharat Mission (Gramin), (iv) Block Programme Management Unit, and (v) Gram Panchayat/Village and Water Sanitation Committee.  At the Gram Panchayat level, Swachhta Doots may be hired to assist with activities such as identification of beneficiaries, IEC, and maintenance of records. Planning: As was done under NBA, each state must prepare an Annual State Implementation Plan.  Gram Panchayats must prepare implementation plans, which will be consolidated into Block Implementation Plans.  These Block Implementation Plans will further be consolidated into District Implementation Plans.  Finally, District Implementation Plans will be consolidated in a State Implementation Plan by the State Swachh Bharat Mission (Gramin). A Plan Approval Committee in Ministry of Drinking Water and Sanitation will review the State Implementation Plans.  The final State Implementation Plan will be prepared by states based on the allocation of funds, and then approved by National Scheme Sanctioning Committee of the Ministry. Funding: Funding for SBM-G will be through budgetary allocations of the central and state governments, the Swachh Bharat Kosh, and multilateral agencies.  The Swachh Bharat Kosh has been established to collect funds from non-governmental sources.  Table 3, below, details the fund sharing pattern for SBM-G between the central and state government, as provided for in the SBM-G guidelines. Table 3: Funding for SBM-G across components

Component Centre State Beneficiary Amount as a % of SBM-G outlay
IEC, start-up activities, etc 75% 25% - 8%
Revolving fund 80% 20% - Up to 5%
Construction of household toilets 75%(Rs 9000)90% for J&K, NE states, special category states 25%(Rs 3000)10% for J&K, NE states, special category states -- Amount required for full coverage
Community sanitary complexes 60% 30% 10% Amount required for full coverage
Solid/Liquid Waste Management 75% 25% - Amount required within limits permitted
Administrative charges 75% 25% - Up to 2% of the project cost

One of the changes from NBA, in terms of funding, is that funds for IEC will be up to 8% of the total outlay under SBM-G, as opposed to up to 15% (calculated at the district level) under NBA.  Secondly, the amount provided for the construction of household toilets has increased from Rs 10,000 to Rs 12,000.  Thirdly, while earlier funding for household toilets was partly through NBA and partly though the Mahatma Gandhi National Rural Employment Guarantee Scheme (MGNREGS), the provision for MGNREGS funding has been done away with under SBM-G.  This implies that the central government’s share will be met entirely through SBM-G. Implementation: The key components of the implementation of SBM-G will include: (i) start up activities including preparation of state plans, (ii) IEC activities, (iii) capacity building of functionaries, (iv) construction of household toilets, (v) construction of community sanitary complexes, (vi) a revolving fund at the district level to assist Self Help Groups and others in providing cheap finance to their members (vii) funds for rural sanitary marts, where materials for the construction of toilets, etc., may be purchased, and (viii) funds for solid and liquid waste management. Under SBM-G, construction of toilets in government schools and aganwadis will be done by the Ministry of Human Resource Development and Ministry of Women and Child Development, respectively.  Previously, the Ministry of Drinking Water and Sanitation was responsible for this. Monitoring: Swachh Bharat Missions (Gramin) at the national, state, and district levels will each have monitoring units.  Annual monitoring will be done at the national level by third party independent agencies.  In addition, concurrent monitoring will be done, ideally at the community level, through the use of Information and Communications Technology. More information on SBM-G is available in the SBM-G guidelines, here.