The central government has enforced a nation-wide lockdown between March 25 and May 3 as part of its measures to contain the spread of COVID-19.  During the lockdown, several restrictions have been placed on the movement of individuals and economic activities have come to a halt barring the activities related to essential goods and services. The restrictions are being relaxed in less affected areas in a limited manner since April 20.  In this blog, we look at how the lockdown has impacted the demand and supply of electricity and what possible repercussions its prolonged effect may have on the power sector. 

Power supply saw a decrease of 25% during the lockdown (year-on-year)

As electricity cannot be stored in large amount, the power generation and supply for a given day are planned based on the forecast for demand.  The months of January and February in 2020 had seen an increase of 3% and 7% in power supply, respectively as compared to 2019 (year-on-year).  In comparison, the power supply saw a decrease of 3% between March 1 and March 24.  During the lockdown between March 24 and April 19, the total power supply saw a decrease of about 25% (year-on-year).

Figure 1: % change in power supply position between March 1 and April 19 (Y-o-Y from 2019 to 2020)

Sources: Daily Reports; POSOCO; PRS.

If we look at the consumption pattern by consumer category, in 2018-19, 41% of total electricity consumption was for industrial purposes, followed by 25% for domestic and 18% for agricultural purposes.  As the lockdown has severely reduced the industrial and commercial activities in the country, these segments would have seen a considerable decline in demand for electricity. However, note that the domestic demand may have seen an uptick as people are staying indoors.

Figure 2: Power consumption by consumer segment in 2018-19

Sources: Central Electricity Authority; PRS.

Electricity demand may continue to be subdued over the next few months. At this point, it is unclear that when lockdown restrictions are eased, how soon will economic activities return to pre COVID-19 levels. India’s growth projections also highlight a slowdown in the economy in 2020 which will further impact the demand for electricity.  On April 16, the International Monetary Fund has slashed its projection for India’s GDP growth in 2020 from 5.8% to 1.9%.

A nominal increase in energy and peak deficit levels

As power sector related operations have been classified as essential services, the plant operations and availability of fuel (primarily coal) have not been significantly constrained. This can be observed with the energy deficit and peak deficit levels during the lockdown period which have remained at a nominal level.  Energy deficit indicates the shortfall in energy supply against the demand during the day.  The average energy deficit between March 25 and April 19 has been 0.42% while the corresponding figure was 0.33% between March 1 and March 24. Similarly, the average peak deficit between March 25 and April 19 has been 0.56% as compared to 0.41% between March 1 and March 24.  Peak deficit indicates the shortfall in supply against demand during highest consumption period in a day.

Figure 3: Energy deficit and peak deficit between March 1, 2020 and April 19, 2020 (in %)

Sources: Daily Reports; POSOCO; PRS.

Coal stock with power plants increases

Coal is the primary source of power generation in the country (~71% in March 2020).  During the lockdown period, the coal stock with coal power plants has seen an increase.  As of April 19, total coal-stock with the power plants in the country (in days) has risen to 29 days as compared to 24 days on March 24. This indicates that the supply of coal has not been constrained during the lockdown, at least to the extent of meeting the requirements of power plants.

Energy mix changes during the lockdown, power generation from coal impacted

During the lockdown, power generation has been adjusted to compensate for reduced consumption, Most of this reduction in consumption has been adjusted by reduced coal power generation. As can be seen in Table 1, coal power generation reduced from an average of 2,511 MU between March 1 and March 24 to 1,873 MU between March 25 and April 19 (about 25%).  As a result, the contribution of coal in total power generation reduced from an average of 72.5% to 65.6% between these two periods.

Table 1: Energy Mix during March 1-April 19, 2020

Sources: Daily Reports; POSOCO; PRS.

This shift may be happening due to various reasons including: (i) renewable energy sources (solar, wind, and small hydro) have MUST RUN status, i.e., the power generated by them has to be given the highest priority by distribution companies, and (ii) running cost of renewable power plants is lower as compared to thermal power plants.

This suggests that if growth in electricity demand were to remain weak, the adverse impact on the coal power plants could be more as compared to other power generation sources.  This will also translate into weak demand for coal in the country as almost 87% of the domestic coal production is used by the power sector.  Note that the plant load factor (PLF) of the thermal power plants has seen a considerable decline over the years, decreasing from 77.5% in 2009-10 to 56.4% in 2019-20. Low PLF implies that coal plants have been lying idle.  Coal power plants require significant fixed costs, and they incur such costs even when the plant is lying idle. The declining capacity utilisation augmented by a weaker demand will undermine the financial viability of these plants further.

Figure 4: Power generation from coal between March 1, 2020 and April 19, 2020 (in MU)

Sources: Daily Reports; POSOCO; PRS.

Finances of the power sector to be severely impacted

Power distribution companies (discoms) buy power from generation companies and supply it to consumers.  In India, most of the discoms are state-owned utilities.  One of the key concerns in the Indian power sector has been the poor financial health of its discoms.  The discoms have had high levels of debt and have been running losses. The debt problem was partly addressed under the UDAY scheme as state governments took over 75% of the debt of state-run discoms (around 2.1 lakh crore in two years 2015-16 and 2016-17).  However, discoms have continued to register losses owing to underpricing of electricity tariff for some consumer segments, and other forms of technical and commercial losses.  Outstanding dues of discoms towards power generation companies have also been increasing, indicating financial stress in some discoms. At the end of February 2020, the total outstanding dues of discoms to generation companies stood at Rs 92,602 crore.

Due to the lockdown and its further impact in the near term, the financial situation of discoms is likely to be aggravated. This will also impact other entities in the value chain including generation companies and their fuel suppliers. This may lead to reduced availability of working capital for these entities and an increase in the risk of NPAs in the sector.  Note that, as of February 2020, the power sector has the largest share in the deployment of domestic bank credit among industries (Rs 5.4 lakh crore, 19.3% of total).

Following are some of the factors which have impacted the financial situation during the lockdown:

  • Reduced cross-subsidy: In most states, the electricity tariff for domestic and agriculture consumers is lower than the actual cost of supply. Along with the subsidy by the state governments, this gap in revenue is partly compensated by charging industrial and commercial consumers at a higher rate.  Hence, industrial and commercial segments cross-subsidise the power consumption by domestic and agricultural consumers.

  • The lockdown has led to a halt on commercial and industrial activities while people are staying indoors.  This has led to a situation where the demand from the consumer segments who cross-subsidise has decreased while the demand from consumer segments who are cross-subsidised has increased.  Due to this, the gap between revenue realised by discoms and cost of supply will widen, leading to further losses for discoms.  States may choose to bridge this gap by providing a higher subsidy.

  • Moratorium to consumers: To mitigate the financial hardship of citizens due to COVID-19, some states such as RajasthanUttar Pradesh, and Goa, among others, have provided consumers with a moratorium for payment of electricity bills. At the same time, the discoms are required to continue supplying electricity. This will mean that the return for the supply made in March and April will be delayed, leading to lesser cash in hand for discoms.

  • Some state governments such as Bihar also announced a reduction in tariff for domestic and agricultural consumers. Although, the reduction in tariff will be compensated to discoms by government subsidy.

  • Constraints with government finances: The revenue collection of states has been severely impacted as economic activities have come to a halt. Further, the state governments are directing their resources for funding relief measures such as food distribution, direct cash transfers, and healthcare. This may adversely affect or delay the subsidy transfer to discoms.

  • The UDAY scheme also requires states to progressively fund greater share in losses of discoms from their budgetary resources (10% in 2018-19, 25% in 2019-20, and 50% in 2020-21).  As losses of discoms may widen due to the above-mentioned factors, the state government’s financial burden is likely to increase.

Capacity addition may be adversely impacted

As per the National Electricity Plan,  India’s total capacity addition target is around 176 GW for 2017-2022.  This comprises of 118 GW from renewable sources, 6.8 GW from hydro sources, and 6.4 GW from coal (apart from 47.8 GW of coal-based power projects already in various stages of production as of January 2018).  

India has set a goal of installing 175 GW of Renewable Power Capacity by 2022 as part of its climate change commitments (86 GW has been installed as of January 2020).  In January 2020, the Parliamentary Standing Committee on Energy observed that India could only install 82% and 55% of its annual renewable energy capacity addition targets in 2017-18 and 2018-19. As of January 2020, 67% of the target has been achieved for 2019-20.

Due to the impact of COVID-19, the capacity addition targets for various sources is likely to be adversely impacted in the short run as:

  • construction activities were stopped during the lockdown and will take some time to return to normal,

  • disruption in the global supply chain may lead to difficulties with the availability of key components leading to delay in execution of projects, for instance, for solar power plants, solar PV modules are mainly imported from China, and

  • reduced revenue for companies due to weak demand will leave companies with less capacity left for capital expenditure.

Key reforms likely to be delayed

Following are some of the important reforms anticipated in 2020-21 which may get delayed due to the developing situation:

  • The real-time market for electricity: The real-time market for electricity was to be operationalised from April 1, 2020. However, the lockdown has led to delay in completion of testing and trial runs. The revised date for implementation is now June 1, 2020.

  • UDAY 2.0/ADITYA: A new scheme for the financial turnaround of discoms was likely to come this year. The scheme would have provided for the installation of smart meters and incentives for rationalisation of the tariff, among other things. It remains to be seen what this scheme would be like since the situation with government finances is also going to worsen due to anticipated economic slowdown. 

  • Auction of coal blocks for commercial mining: The Coal Ministry has been considering auction of coal mines for commercial mining this year. 100% FDI has been allowed in the coal mining activity for commercial sale of coal to attract foreign players. However, the global economic slowdown may mean that the auctions may not generate enough interest from foreign as well as domestic players.

For a detailed analysis of the Indian Power Sector, please see here.  For details on the number of daily COVID-19 cases in the country and across states, please see here.  For details on the major COVID-19 related notifications released by the centre and the states, please see here.  

The Juvenile Justice (Care and Protection of Children) Bill, 2015 is currently pending in Rajya Sabha and was listed for passage in the current Winter session of Parliament.  The Bill was passed by Lok Sabha after incorporating certain amendments, in May 2015.  Here is all you need to know about the Bill and key issues associated with it.  A PRS analysis of the statistics on incidence of crimes by children and conviction rates is available here.

Table 1: Juveniles between 16-18 years apprehended under IPC  
Crime

2003

2013

Burglary

1,160

2,117

Rape

293

1,388

Kidnapping/abduction

156

933

Robbery

165

880

Murder

328

845

Other offences

11,839

19,641

Total

13,941

25,804

Note: Other offences include cheating, rioting, etc.  Sources: Juveniles in conflict with law, Crime in India 2013, National Crime Records Bureau; PRS.  

Who is a juvenile as recognised by law? In the Indian context, a juvenile or child is any person who is below the age of 18 years.  However, the Indian Penal Code specifies that a child cannot be charged for any crime until he has attained seven years of age. Why is there a need for a new Bill when a juvenile justice law already exists? The government introduced the Juvenile Justice Bill in August 2014 in Lok Sabha and gave various reasons to justify the need for a new law.  It said that the existing Juvenile Justice Act, 2000 was facing implementation issues and procedural delays with regard to adoption, etc.  Additionally, the government cited National Crime Records Bureau (NCRB) data to say that there has been an increase in crimes committed by juveniles, especially by those in the 16-18 years age group. NCRB data shows that the percentage of juvenile crimes, when seen in proportion to total crimes, has increased from 1% in 2003 to 1.2% in 2013.  During the same period, 16-18 year olds accused of crimes as a percentage of all juveniles accused of crimes increased from 54% to 66%.  However, the type of crimes committed by 16-18 year olds can be seen in table 1. What is the new Bill doing? Currently, the Juvenile Justice (Care and Protection of Children) Act, 2000 provides the framework to deal with children who are in conflict with law and children in need of care and protection.  The Bill seeks to replace the existing 2000 Act and lays down the procedures to deal with both categories of children.  It highlights the two main bodies that will deal with these children, to be set up in each district: Juvenile Justice Boards (JJBs) and Child Welfare Committees (CWCs).  It provides details regarding adoption processes and penalties applicable under the law.  The Bill provides for children between 16-18 years to be tried as adults for heinous crimes.  The three types of offences defined by the Bill are: (i) a heinous offence is an offence that attracts a minimum penalty of seven years imprisonment under any existing law, (ii) a serious offence is one that gets imprisonment between three to seven years and, (iii) a petty offence is penalized with up to three years imprisonment. Currently, how is a juvenile in conflict with law treated? How is that set to change? Under the 2000 Act, any child in conflict with law, regardless of the type of offence committed, may spend a maximum of three years in institutional care (special home, etc.)  The child cannot be given any penalty higher than three years, nor be tried as an adult and be sent to an adult jail.  The proposed Bill treats all children under the age of 18 years in a similar way, except for one departure.  It states that any 16-18 year old who commits a heinous offence may be tried as an adult.  The JJB shall assess the child’s mental and physical capacity, ability to understand consequences of the offence, etc.  On the basis of this assessment, a Children’s Court will determine whether the child is fit to be tried as an adult. What did the Standing Committee examining the Bill observe? One of the reasons cited for the introduction of the Bill is a spike in juvenile crime, as depicted by NCRB data.  The Standing Committee on Human Resource Development examining the Bill stated that NCRB data was misleading as it was based on FIRs and not actual convictions.  It also observed that the Bill violates some constitutional provisions and said that the approach towards juvenile offenders should be reformative and rehabilitative. The Bill as introduced posed certain constitutional violations to Article 14, 20(1) and 21.  These have been addressed by deletion of the relevant clause, at the time of passing the Bill in Lok Sabha. What does the United Nations Convention on the Rights of the Child (UNCRC) say? What are the obligations on the signatory nations? The UNCRC was ratified by India in 1992 and the 2000 Act was consequently brought in to adhere to the standards set by the Convention.  The proposed Bill maintains this aim and seeks to improve implementation and procedural delays experienced by the 2000 Act.  The UNCRC states that signatory countries should treat every child under the age of 18 years in the same manner and not try them as adults.  While the 2000 Act complies with this requirement, the Bill does not.  However, many other countries who have also ratified the Convention try juveniles as adults, in case of certain crimes.  These countries include the UK, France, Germany, etc.  The United States is not a signatory to the UNCRC and also treats juveniles as adults in case of certain crimes. Under the Bill, what happens to a child who is found to be orphaned, abandoned or surrendered? The Bill addresses children in need of care and protection.  When a child is found to be orphaned, abandoned or surrendered he is brought before a Child Welfare Committee within 24 hours.  A social investigation report is conducted for the child, and the Committee decides to either send the child to a children’s home or any other facility it deems fit, or to declare the child to be free for adoption or foster care.  The Bill outlines the eligibility criteria for prospective parents.  It also details procedures for adoption, and introduces a provision for inter-country adoption, so that prospective parents living outside the country can adopt a child in India. Currently, the Guidelines Governing Adoption, 2015 under the 2000 Act, regulates adoptions.  Model Foster Care Guidelines have also recently been released by the Ministry of Women and Child Development. What are the penalties for committing offences against children? Various penalties for committing offences against children are laid out in the Bill.  These include penalties for giving a child an intoxicating substance, selling or buying the child, cruelty against a child, etc. Issue to consider: The penalty for giving a child an intoxicating or narcotic substance is an imprisonment of seven years and a fine of up to one lakh rupees.  Comparatively, buying or selling a child will attract a penalty including imprisonment of five years and a fine of one lakh rupees. It remains to be seen if the Bill will be taken up for consideration in this session, and if its passage will address the issues surrounding children in conflict with the law.