The counting of votes for General Election 2019, which concluded on Sunday, will begin tomorrow, i.e., 23rd May at 8 AM.  The election was conducted in 7 phases for 543 constituencies of Lok Sabha.  The Election Commission of India (ECI) uses Electronic Voting Machines (EVM) to conduct elections. Since 2000, ECI has conducted 113 assembly elections and three general elections using EVMs.[1]  Voter Verified Paper Audit Trail (VVPAT) system was added to EVMs in 2013 to increase transparency and improve voter confidence in the system.  The VVPAT system generates a printed paper slip bearing the name and election symbol of the candidate.  On April 8, 2019, Supreme Court instructed the ECI that printed VVPAT slips from randomly selected five polling stations in each assembly segment of a parliamentary constituency should be matched with EVMs.[2]  In this blog, we explain the election counting process in India.

Who is responsible for counting the votes?

The Returning Officer (RO) is responsible for conducting elections in a constituency, which also includes counting of votes.[3] The RO is an officer of the government or a local authority nominated by the ECI for each constituency in consultation with the state government.[4]

Where does the counting take place?

The RO decides the place where the votes will be counted for the parliamentary constituency.  The date and time of counting is fixed by the ECI.  Ideally counting of votes for a constituency should be done at one place, preferably at the Headquarter of the RO in that constituency.  It should be performed under the direct supervision of the RO.  However, each Parliamentary Constituency has multiple assembly segments.  In this situation, counting can take place at different locations for various assembly segments under the direct supervision of an Assistant Returning Officer (ARO).

Layout of the Counting Hall

Page 431, Handbook for Returning Officer Document 23 Edition 1, Election Commission of India

Counting of votes for each assembly segment of a parliamentary constituency is performed in a single hall.  In each round of counting, votes from 14 EVMs are counted.  In case of simultaneous parliamentary and assembly elections, such as Odisha, the first seven tables are used for counting votes for assembly elections, and the rest for parliamentary elections.

In constituencies with a large number of candidates, it may not be possible to count votes for all candidates in a single hall without overcrowding it.  In such a situation, the number of counting halls or tables can be increased with the prior permission of the ECI.  A hall can also be used for counting votes of another assembly segment after the results of the first segment are declared.  However, counting may be done for only one assembly segment in a hall at any point of time.

What is the counting process?

Counting is performed by counting supervisors appointed by the RO.  Counting staff is appointed through a three stage randomisation process to ensure impartiality.  Candidates along with their counting agents and election agents are also present in the counting hall.

Counting of votes begins with Electronically Transmitted Postal Ballots (ETPB) and Postal Ballots (PB). These votes are counted under the direct supervision of the RO. Counting of EVMs can start 30 minutes after the commencement of PB counting, even if all PBs have not been counted.  At the end of each round of counting, the results from 14 EVMs are declared.

What is the process for counting VVPAT slips?

The ECI prescribes the process for randomly selecting one EVM for each assembly segment of a parliamentary constituency for VVPAT matching.  The verification of VVPAT paper slips is conducted inside a secured VVPAT Counting Booth in the counting hall with access to authorised personnel only.  Any counting table in the hall can be converted into VVPAT Counting Booth after completing EVM vote counting.  Parliamentary constituencies generally have between five and ten assembly segments.

The Supreme Court has decided that VVPAT slips of five randomly selected polling stations for each assembly segment shall be matched with the result shown in the respective EVMs.  This implies that VVPAT paper slips need to be matched for about 25-50 machines for each parliamentary constituency.  This process requires personal supervision of RO/ARO.  The ECI has decided that the counting of five VVPATs will be done sequentially.[5]  The RO can declare the final result for the constituency after the VVPAT matching process has been completed.

What happens if there is a discrepancy between the VVPAT count and the EVM results?

In such a case, the printed paper slips count is taken as final. The ECI has not clarified whether there would be any further action (such as counting of all VVPATs in a constituency or assembly segment) if there is a discrepancy in the counts of one of the five VVPATs.

[1] https://www.eci.gov.in/files/file/8756-status-paper-on-evm-edition-3/.

[2] N Chandrababu Naidu and Ors. v. Union of India and Anr WP(C). 273/2019 decided on April 8, 2019.

[3] https://www.eci.gov.in/files/file/9400-hand-book-for-returning-officer-february-2019/.

[4] https://www.eci.gov.in/faqs/elections/election-machinery/faqs-election-machinery-r1/.

[5] https://www.eci.gov.in/files/file/10197-mandatory-verification-of-vvpat-paper-slips-regarding/.

On March 14, 2022 Rajya Sabha discussed the working of the Ministry of Development of North Eastern Region (DoNER).  During the discussion, several issues around budgetary allocation, implementation of schemes and connectivity with the North Eastern Region were discussed.  The Ministry of DoNER is responsible for matters relating to the planning, execution and monitoring of development schemes and projects in the North Eastern Region.  In this blog post, we analyse the 2022-23 budgetary allocations for the Ministry and discuss related issues.  

A new scheme named PM-DevINE announced to boost infrastructure and social development

In 2022-23, the Ministry has seen a 5% increase in allocation from the revised estimates of 2021-22.  The Ministry has been allocated Rs 2,800 crore which will be used for various development schemes, such as the North East Special Infrastructure Development Scheme and North East Road Sector Development Scheme.  A scheme-wise break-up of the budget allocation for the Ministry is given below in Table 1.  

One of the key highlights of the Finance Minister’s Budget Speech was the announcement of a new scheme named the Prime Minister’s Development Initiative for North East (PM-DevINE).  It will be implemented through the North East Council (nodal agency for the economic and social development of the North Eastern Region).  PM-DevINE will fund infrastructure and social development projects in areas such as road connectivity, health, and agriculture.  The scheme will not replace or subsume existing central sector or centrally sponsored schemes.  The Scheme will be given an initial allocation of Rs 1,500 crore.

Table 1: Break-up of allocation to the Ministry of DoNER (in Rs crore)

Major Heads

2020-21 Actuals

2021-22 BE

2021-22 RE

2022-23 BE

% change from 2021-22 RE to 2022-23 BE

North East Special Infrastructure Development Scheme

446

675

674

1,419

111%

Schemes of North East Council

567

585

585

702

20%

North East Road Sector Development Scheme

416

696

674

496

-26%

Central pool of resources for North East and Sikkim

342

581

581

-

-

Others

270

322

344

241

-30%

Total

1,854

2,658

2,658

2,800

5%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: BE – Budget Estimate; RE – Revised Estimate; Schemes for North East Council includes Special Development Projects.

Sources: Demand No. 23 of Union Budget Documents 2022-23; PRS. 

Allocation towards capital outlay less than demand

The Standing Committee on Home Affairs (2022) noted that the amount allocated at the budget stage in 2022-23 (Rs 660 crore) was 17% less than the demand by the Ministry (Rs 794 crore).  Capital expenditure includes capital outlay which leads to the creation of assets such as schools, hospitals, and roads and bridges.  The Committee observed that this may severely affect the implementation of several projects and schemes that require capital outlay.  It recommended the Ministry to take up this matter with the Finance Ministry and demand additional assistance at the revised stage of the 2022-23 financial year.

Underutilisation of funds over the years

Since 2011-12 (barring 2016-17), the Ministry has not been able to utilise the funds allocated to it at the budgeted stage (See Figure 1).  For instance, in 2020-21, fund utilisation in case of the North East Road Sector Development Scheme was 52%, whereas only 34% of funds were utilised under the North East Special Infrastructure Development Scheme (for infrastructure projects relating to water supply, power, connectivity, social infrastructure).  Key reasons for underspending highlighted by the Ministry include late receipt of project proposals and non-receipt of utilisation certificates from state governments.

Figure 1: Underutilisation of funds by the Ministry since 2011-12

image
 Note: Revised Estimate has been used as the Actual Expenditure for 2021-22.
 Sources: Union Budget Documents (2011-12 to 2022-23); PRS
.

Delay in project completion

The Ministry implements several schemes for infrastructural projects such as roads and bridges.  The progress of the certain schemes has been inadequate.   The Standing Committee (2022) observed that the physical progress of many road sector projects under the North East Road Sector Development Scheme is either at zero or in single digit percent in spite of release of the amount for the project.  Similarly, projects under the Karbi Anglong Autonomous Territorial Council (autonomous district council in Assam) and Social and Infrastructure Development Fund (construction of roads, bridges, and construction of schools and water supply projects in the North Eastern Region) have seen inadequate progress.

Need to address declining forest cover

The Standing Committee (2021) has also recommended the Ministry of DoNER to work towards preserving forest cover.  The Committee took note of the declining forest cover in the North East India.  As per the India State of Forest Report (2021), states showing major loss of forest cover from 2019 to 2021 are: (i) Arunachal Pradesh (loss of 257 sq km of forest cover), (ii) Manipur (249 sq km), (iii) Nagaland (235 sq km), (iv) Mizoram (186 sq km), and (v) Meghalaya (73 sq km).  The loss of forest cover may be attributed to shifting cultivation, cutting down of trees, natural calamities, anthropogenic (environmental pollution) pressure, and developmental activities.  The Committee recommended that various measures to protect the forest and environment must be given priority and should implemented within the stipulated timeline.  It also suggested the Ministry to: (i) carry out regular plantation drives to increase forest cover/density, and (ii) accord priority towards the ultimate goal of preserving and protecting the forests under various centrally sponsored initiatives.

Key issues raised by Members during discussion in Rajya Sabha

The discussion on the working of the Ministry of DoNER took place in Rajya Sabha on March 14, 2022.  One of the issues highlighted by members was about the Ministry not having its own line Department.  This leads to the Ministry being dependent on the administrative strength of the states for implementation of projects.  Another issue highlighted by several members was the lack of connectivity of the region through railways and road networks which hampers the economic growth of region.  The DoNER Minister in his response to the House assured the members that the central government is making continuous efforts towards improving connectivity to the North East region through roads, railways, waterways, and telecommunication.         

Allocation by Union Ministries to the North East 

Union Ministries allocate 10% of their budget allocation for the North East (See Figure 2 for fund allocation and utilisation).  The Ministry of DoNER is the nodal Ministry that monitors and keeps track of the allocation done by various Ministries.  In 2022-23, Rs 76,040 crore has been allocated by all the Ministries for the North Eastern region.  The allocation has increased by 11% from the revised estimate of 2021-22 (Rs 68,440 crore).   In 2019-20 and 2021-21 the actual expenditure towards North Eastern areas was lower than budget estimates by 18% and 19% respectively.  

Figure 2: Budgetary allocation by all Union Ministries for the North East (amount in Rs crore)

image   

Source: Report No. 239: Demand for Grants (2022-23) of Ministry of Development of North Eastern Region, Standing Committee on Home Affairs; PRS.