Applications for the LAMP Fellowship 2025-26 will open on December 1, 2024. Sign up here to be notified when applications open.

The United Nations celebrates October 16 as the World Food Day every year, with an aim to spread awareness about eradicating hunger and ensuring food security for all.[1]  In this context, we examine the status of food and public distribution in India, and some challenges in ensuring food security for all.

Background

In 2017-18, over Rs 1,50,000 crore, or 7.6% of the government’s total expenditure has been allocated for providing food subsidy under the Targeted Public Distribution System (TPDS).[2]  This allocation is made to the Department of Food and Public Distribution under the Ministry of Consumer Affairs.

Food subsidy has been the largest component of the Department’s expenditure (94% in 2017-18), and has increased six-fold over the past 10 years.  This subsidy is used for the implementation of the National Food Security Act, 2013 (NFSA), which provides subsidised food grains (wheat and rice) to 80 crore people in the country.[3]  The NFSA seeks to ensure improved nutritional intake for people in the country.3

One of the reasons for the six-fold increase in food subsidy is the non-revision of the price at which food grains are given to beneficiaries since 2002.[4]  For example, rice is given to families under the Antyodaya Anna Yojana at Rs 3/Kg since 2002, while the cost of providing this has increased from Rs 11/Kg in 2001-02 to Rs 33/Kg in 2017-18.

Provision of food subsidyTable 1

TPDS provides food security to people below the poverty line.  Over the years, the expenditure on food subsidy has increased, while the ratio of people below poverty line has reduced.  A similar trend can also be seen in the proportion of undernourished persons in India, which reduced from 24% in 1990 to 15% in 2014 (see Table 1).  These trends may indicate that the share of people needing subsidised food has declined.

Nutritional balance:  The NFSA guarantees food grains i.e. wheat and rice to beneficiaries, to ensure nutritious food intake.3  Over the last two decades, the share of cereals or food grains as a percentage of food consumption has reduced from 13% to 8% in the country, whereas that of milk, eggs, fish and meat has increased (see Figure 1).  This indicates a reduced preference for wheat and rice, and a rise in preference towards other protein rich food items. Figure 1

Methods of providing food subsidy

Food subsidy is provided majorly using two methods.  We discuss these in detail below.

TPDS assures beneficiaries that they will receive food grains, and insulates them against price volatility. Food grains are delivered through fair price shops in villages, which are easy to access.[5],[6]

However, high leakages have been observed in the system, both during transportation and distribution.  These include pilferage and errors of inclusion and exclusion from the beneficiary list.  In addition, it has also been argued that the distribution of wheat and rice may cause an imbalance in the nutritional intake as discussed earlier.7  Beneficiaries have also reported receiving poor quality food grains as part of the system.

Cash Transfers seek to increase the choices available with a beneficiary, and provide financial assistance. It has been argued that the costs of DBT may be lesser than TPDS, owing to lesser costs incurred on transport and storage.  These transfers may also be undertaken electronically.6,7

However, it has also been argued that cash received as part of DBT may be spent on non-food items.  Such a system may also expose beneficiaries to inflation.  In this regard, one may also consider the low penetration and access to banking in rural areas.[7]

Figure 2

In 2017-18, 52% of the centre’s total subsidy expenditure will be on providing food subsidy under TPDS (see Figure 2).  The NFSA states that the centre and states should introduce schemes for cash transfers to beneficiaries.  Other experts have also suggested replacing TPDS with a Direct Benefit Transfer (DBT) system.4,[8]

The central government introduced cash subsidy to TPDS beneficiaries in September 2015.[9]  As of March 2016, this was being implemented on a pilot basis in a few union territories.  In 2015, a Committee on Restructuring of Food Corporation of India had also recommended introducing Aadhaar to plug leakages in PDS, and indexing it to inflation.  The Committee estimated that a switch to DBT would reduce the food subsidy bill of the government by more than Rs 30,000 crore.[10]

Current challenges in PDS

Leakages in PDS:  Leakages refer to food grains not reaching intended beneficiaries.  According to 2011 data, leakages in PDS were estimated to be 46.7%.10,[11]  Leakages may be of three types: (i) pilferage during transportation of food grains, (ii) diversion at fair price shops to non-beneficiaries, and (iii) exclusion of entitled beneficiaries from the list.6,[12]

In 2016, the Comptroller and Auditor General (CAG) found that states had not completed the process of identifying beneficiaries, and 49% of the beneficiaries were yet to be identified.  It also noted that inclusion and exclusion errors had been reported in the beneficiary lists.[13]

In February 2017, the Ministry made it mandatory for beneficiaries under NFSA to use Aadhaar as proof of identification for receiving food grains.  Through this, the government aims to remove bogus ration cards, check leakages and ensure better delivery of food grains.10,[14]  As of January 2017, while 100% ration cards had been digitised, the seeding of these cards with Aadhaar was at 73%.14

Figure 3

Storage:  As of 2016-17, the total storage capacity in the country is 788 lakh tonnes, of which 354 lakh tonnes is with the Food Corporation of India and 424 lakh tonnes is with the state agencies.[15]

The CAG in its performance audit found that the available storage capacity in states was inadequate for the allocated quantity of food grains.13  For example, as of October 2015, of the 233 godowns sanctioned for construction in Maharashtra, only 93 had been completed.  It also noted that in four of the last five years, the stock of food grains with the centre had been higher than the storage capacity available with Food Corporation of India.

Quality of food grains:  A survey conducted in 2011 had noted that people complained about receiving poor quality food grain which had to be mixed with other grains to be edible.6  There have also been complaints about people receiving food grains containing alien substances such as pebbles.  Poor quality of food may impact the willingness of people to buy food from fair price shops, and may have an adverse impact on their health.[16]

The Ministry has stated that while regular surveillance, monitoring, inspection and random sampling of all food items is under-taken by State Food Safety Officers, separate data for food grains distributed under PDS is unavailable.[17]  In the absence of data with regard to quality testing results of food grains supplied under PDS, it may be difficult to ascertain whether these food items meet the prescribed quality and safety standards.

[1] About World Food Day, http://www.fao.org/world-food-day/2017/about/en/.

[2] Expenditure Budget, Union Budget 2017-18, http://unionbudget.nic.in/ub2017-18/eb/allsbe.pdf.

[3] National Food Security Act, 2013, http://indiacode.nic.in/acts-in-pdf/202013.pdf.

[4] “Prices, Agriculture and Food Management”, Chapter 5, Economic Survey 2015-16, http://unionbudget.nic.in/budget2016-2017/es2015-16/echapvol2-05.pdf.

[5] The Case for Direct Cash Transfers to the Poor, Economic and Political Weekly, April 2008, http://www.epw.in/system/files/pdf/2008_43/15/The_Case_for_Direct_Cash_Transfers_to_the_Poor.pdf.

[6] Revival of the Public Distribution System: Evidence and Explanations, The Economic and Political Weekly, November 5, 2011,

http://www.epw.in/system/files/pdf/2011_46/44-45/Revival_of_the_Public_Distribution_System_Evidence_and_Explanations.pdf.

[7] ‘Report of the Internal Working Group on Branch Authorisation Policy’, Reserve Bank of India, September 2016, https://rbidocs.rbi.org.in/rdocs/PublicationReport/Pdfs/IWG99F12F147B6E4F8DBEE8CEBB8F09F103.PDF.

[8] Working Paper 294, “Leakages from Public Distribution System”, January 2015, ICRIER, http://icrier.org/pdf/Working_Paper_294.pdf.

[9] “The Cash Transfer of Food Subsidy Rules, 2015”, Ministry of Consumer Affairs, Food and Public Distribution, September 3, 2015, http://dfpd.nic.in/writereaddata/Portal/News/32_1_cash.pdf.

[10] Report of the High Level Committee on Reorienting the Role and Restructuring of Food Corporation of India, January 2015, http://www.fci.gov.in/app2/webroot/upload/News/Report%20of%20the%20High%20Level%20Committee%20on%20Reorienting%20the%20Role%20and%20Restructuring%20of%20FCI_English_1.pdf.

[11] Third Report of the Standing Committee on Food, Consumer Affairs and Public Distribution: Demands for Grants 2015-16, Department of Food and Public Distribution, http://164.100.47.193/lsscommittee/Food,%20Consumer%20Affairs%20&%20Public%20Distribution/16_Food_Consumer_Affairs_And_Public_Distribution_3.pdf.

[12] Performance Evaluation of Targeted Public Distribution System, Planning Commission of India, March 2005, http://planningcommission.nic.in/reports/peoreport/peo/peo_tpds.pdf.

[13] Audit on the Preparedness for Implementation of National Food Security Act, 2013 for the year ended March, 2015, Report No. 54 of 2015, Comptroller and Auditor General of India, http://cag.gov.in/sites/default/files/audit_report_files/Union_Civil_National_Food_Security_Report_54_of_2015.pdf.

[14] Unstarred Question No. 844, Lok Sabha, Ministry of Consumer Affairs, Food and Public Distribution, Answered on February 7, 2017, http://164.100.47.190/loksabhaquestions/annex/11/AU844.pdf.

[15] Annual Report 2016-17, Department of Food & Public Distribution, Ministry of Consumer Affairs, Food & Public Distribution, http://dfpd.nic.in/writereaddata/images/annual-140217.pdf.

[16] 30 Food Subsidy, The Economic and Political Weekly, December 27, 2014, http://www.epw.in/system/files/pdf/2014_49/52/Food_Subsidy.pdf.

[17] Unstarred Question No. 2124, Lok Sabha, Ministry of Consumer Affairs, Food and Public Distribution, Answered on November 29, 2016, http://164.100.47.190/loksabhaquestions/annex/10/AU2124.pdf.

On November 28, 2012, the Comptroller and Auditor General submitted its report on the implementation of the Jawaharlal Nehru National Urban Renewal Mission (JNNURM).  According to the report most of the projects initiated under JNNURM have not been completed.  For instance with respect to urban infrastructure projects, only 231 projects out of the 1298 sanctioned projects have been completed.  Similarly, with respect to housing projects, only 22 of the 1517 projects have been completed.  Some of the other key recommendations of the report are:

  •  Some of the reasons for the delay in completing the projects include: (i) delay in acquiring land; (ii) deficiency in preparation of projects; and (iii) non-identification of beneficiaries which increased the risk of ineligible beneficiaries getting the benefits.
  •  A total allocation of Rs 66,084 crore had been made by the Planning Commission.  However, against this total allocation, the central government had made an allocation of only Rs 37,070 out of which until March 30, 2011 only Rs 32,934 had been released.
  • There was a delay in releasing these funds to the states.  A large portion of the funds was released only in the last quarter and more particularly in March.
  • The JNNURM guidelines were deficient as they did not provide adequate guidance to the states on the method of parking the funds and utilization of interest.

The need and objectives of JNNURM According to the 2011 census India’s urban population has increased from 286 million in 2001 to 377 million in 2011 .  With the increase in urban population, there is a requirement to improve the urban infrastructure and improve the service delivery mechanisms.  With these specific objectives in mind, the central government launched the Jawaharlal Nehru National Urban Renewal Mission 2005-2006.  The aim of the Mission is to encourage reforms and fast track planned development of identified cities (such as cities with a population of more than 1 million as per the 2001 census).  JNNURM has two main components namely : (i) Urban Infrastructure and Governance  and (ii) Urban Infrastructure Development for Small and Medium Towns. The duration of JNNURM was from 2005-06 to 2011-12. However, as the projects have not been completed the Government has extended its duration until March 2014. Funds for JNNURM The funds for JNNURM are provided through the Additional Central Assistance.  This implies that the funds are provided as grants to the states directly from the centre.   In the 2012 Union Budget, the central government has allocated Rs 12,522 crore for JNNURM. This represents around 10 % of the total central assistance through the different schemes to states and union territories in 2012-13. As on June 30 2012, 554 projects at a total cost of Rs 62,253 crore have been sanctioned under the Urban Infrastructure and Governance sub-mission of JNNURM.   The table below shows the status of the sanctioned JNNURM  projects in the different states. State wise status of the projects under JNNURM                 (as on August 6, 2012)

Name of State Total Allocation (Rs Lakh) Number of sanctioned projects Completed Projects
Andhra Pradesh 2,11,845 52 18
Arunachal Pradesh 10,740 3 NA
Assam 27,320 2 NA
Bihar 59,241 8 NA
Chandigarh 27,087 3 NA
Chattisgarh 24,803 1 NA
Delhi 2,82,318 23 4
Goa 12,094 2 NA
Gujarat 2,57,881 72 40
Haryana 32,332 4 NA
Himachal Pradesh 13,066 5 NA
Jammu & Kashmir 48,836 5 NA
Jharkhand 94,120 5 NA
Karnataka 1,52,459 47 22
Kerala 67,476 11 NA
Madhya Pradesh 1,32,850 23 7
Maharashtra 5,50,555 80 21
Manipur 15,287 3 NA
Meghalaya 15,668 2 NA
Mizoram 14,822 4 NA
Nagaland 11,628 3 NA
Orissa 32,235 5 NA
Punjab 70,775 6 1
Puducherry 20,680 2 NA
Rajasthan 74,869 13 2
Sikkim 10,613 2 NA
Tamil Nadu 2,25,066 48 12
Tripura 14,018 2 NA
Uttar Pradesh 2,76,941 33 4
Uttarakhand 40,534 14 NA
West Bengal 3,21,840 69 15

Source: Jawaharlal Nehru National Urban Renewal Mission; PRS.

  • Gujarat at 55.55% has the highest number of completed projects, while Uttar Pradesh at 12.24% has the lowest number of completed projects.
  • Out of the larger states, Delhi and Maharashtra at 17% and 26% have a comparatively low rate of completed projects.
  • Maharashtra has the highest number of sanctioned projects, while the North Eastern states, Chattisgarh and Puducherry have the lowest number of sanctioned projects.