Bihar became the first state to scrap the MLA Local Area Development Fund scheme (MLALAD).  According to news reports, Nitish Kumar, Bihar’s Chief Minister, is planning to replace it with the CM Area Development Programme, which would be implemented at the District level.  The schemes would be selected by a district selection committee headed by the minister-in-charge and MLAs and MLCs of that district as members.  The implementation shall rest with a body of engineers, headed by Engineer-in-chief.  The district magistrates would only monitor implementation and contractors would be chosen through open tendering in which a representative of the Comptroller and Auditor General of India (CAG) would be present.  The state government would allocate funds as per requirement. The MPLAD and MLALAD scheme was introduced in December 1993 by former Prime Minister, P.V. Narasimha Rao to enable legislators to execute small works of a local nature to meet the urgent needs of their constituents.  Under the scheme, each legislator may identify projects and sanction upto Rs 2 crore per year for public works in their constituencies.  The scheme was mooted after MPs demanded that they should be able to recommend certain development projects in their constituencies.  The projects include assets building such as drinking water facilities, primary education, public health sanitation and roads.  The initial amount allocated was Rs 5 lakh per year to each MP. It has however not been smooth sailing for the scheme.  Besides the many implementation lapses (as pointed out by the Standing Committee on Finance in 1998-1199, the CAG and the Planning Commission), the constitutionality of the scheme has been questioned by various scholars and experts. In 2002, the National Commission to Review the Working of the Constitution recommended immediate discontinuation of the MPLAD scheme on the ground that it was inconsistent with the spirit of federalism and distribution of powers between the centre and the state.  Former MP, Era Sezhiyan in a booklet titled ‘MPLADS – Concept, Confusion and Contradictions’ also opposed the scheme and recommended that it be scrapped since it ran contrary to the Constitutional provisions which envisaged separate roles for the Executive and Legislature.  However, the Committee on MPLADS in its 13th Report and its 15th Report stated that there was nothing wrong with the scheme per se except some procedural infirmities and recommended among other things a change of nomenclature to the Scheme for Local Area Development.  The debate continued with the 2nd Administrative Reforms Commission’s report on “Ethics in Governance” taking a firm stand against the scheme arguing that it seriously erodes the notion of separation of powers, as the legislator directly becomes the executive.  However, in response to a Writ Petition that challenged the constitutionality of the MPLAD scheme as ultra vires of the Constitution of India, in May 2010, a five-judge bench of the Supreme Court ruled that there was no violation of the concept of separation of powers because the role of an MP in this case is recommendatory and the actual work is carried out by the Panchayats and Municipalities which belong to the executive organ.  There are checks and balances in place through the guidelines which have to be adhered to and the fact that each MP is ultimately responsible to the Parliament. Meanwhile, some MPs are pushing for hiking the amount allocated under the scheme to Rs 5 crore.  However, no decision has been reached yet.  The Ministry of Statistics and Programme Implementation has suggested that a single parliamentary committee be formed comprising of members of both Houses of Parliament to monitor MPLAD schemes. While the question of constitutionality of the MPLAD scheme may have been put to rest by the Supreme Court ruling, other issues related to implementation of the scheme still remain.  Unless problems such as poor utilisation of funds, irregular sanction of works, delay in completion of works are tackled in an efficient manner, the efficacy of the scheme will remain in doubt.

Recently, the government issued letters de-allocating coal blocks of various companies, based on the recommendations of the  Inter Ministerial Group (IMG).  This post discusses the history behind the de-allocations, the parameters the IMG used while examining the progress of various coal blocks and the action that has been taken by the government. The Comptroller and Auditor General (CAG) released a performance audit report on 'Allocation of Coal Blocks and Augmentation of Coal Production' on August 17, 2012.  Some of the key findings of the Report were:

  • The government failed to conduct competitive bids for the allocation of coal blocks.  This resulted in a benefit of  Rs 1.86 lakh crore (approx.) to private allottees.  The government could have tapped some of this financial benefit by expediting the decision on competitive bidding for allocation of coal blocks.
  • The implementation schedule of a number of coal blocks has been delayed by one to ten years.  This schedule relates to the time frame within which the Mining Plan for the block has to be approved, various clearances have to be submitted, land acquired, etc.
  • From 2005, the Ministry of Coal (MoC) required the allottees to provide bank guarantees which would be encashed if they failed to meet the above mentioned milestones.  The CAG observed that there was a delay in introducing the bank guarantee and linking it with milestones.

The IMG on Coal was constituted for the periodic review of the development of coal blocks and end use plants.  The IMG had requested a status paper from the Coal Controller, MoC.  This has been submitted to the IMG but is not available.  The IMG will decide if private allottees have made substantial progress based on certain parameters.  The parameters used by IMG are:  approval of Mining Plan, status of environment and forest clearance, grant of mining lease and progress made in land acquisition. They are also examining the physical status of End Use Plant (EUP), investment made and the expected date of opening of the mine and commissioning of EUP. The IMG has made the following recommendations:

  • The coal blocks of companies that have not made substantial progress should be de-allocated.  Additionally, they have recommended the deduction of bank guarantee in the cases where the private companies have not reached the milestones as per the time line decided upon.  As of November 22, 2012, the IMG has recommended the de-allocation of the coal blocks listed in Table 1 and the deduction of bank guarantees for the coal blocks in Table 2.
  • Since, the system of bank guarantee was only introduced in March 2005, not all coal blocks had submitted a bank guarantee.  Where a bank guarantee has not been provided but there is substantial progress in meeting the milestones, the IMG may require the allottee to submit a bank guarantee.

[table id=1 /]

 

[table id=5 /]

 

Of the coal blocks that the IMG has recommended for de-allocation, until now the government has accepted the de-allocation of the following: Bramhadih block, Gourangdih, New Patrapara, Chinora block, Warora (Southern Part) block, Lalgarh (North) block, Bhaskarpara block, Dahegaon/Makardhokra-IV block, Gondkhari block and Ramanwara North block.  The government has accepted the deduction of bank guarantees for blocks such as Moitra, Jitpur, Bhaskarpara, Durgapur II/Sariya, Dahegaon/Makardhokra-IV, Marki Mangli II, III and IV, Gondhkari, Lohari, Radhikapur East, Bijahan and Nerad Malegaon. The letters issued by the government de-allocating coal blocks and deducting bank guarantees are available here.

For a detailed summary of the CAG Report, click here.