Parliament has announced the ministries whose Demands for Grants will be discussed in detail in the Lok Sabha (after April 12 when Parliament reconvenes). They are:
Defence
Rural Development
Tribal Affairs
Water Resources
External Affairs
Road Transport and Highways
Together these ministries have asked Parliament for a total of Rs 289,938 crore (Rs 175,772 crore for Defence alone) – which is slightly over a quarter of the total expenditure budgeted by the Central Government for 2010-11.
The Rajya Sabha does not discuss demands for grants but has announced a list of ministries whose functioning it will review after the recess. They are:
Home Affairs
Tribal Affairs
Defence
Power
Chemicals and Fertilizers
Petroleum and Natural Gas
Youth affairs and Sports
Women and Child Development
Consumer affairs, Food and Public Distribution
Housing and Urban Poverty Alleviation
Reports suggest that the first reactor of the Kudankulam power plant is close to operational. With state discoms struggling, advocates of nuclear power see Kudankulam as a necessary boost to India’s struggling power sector. The Kudankulam power plant will have two reactors. At full capacity, the plant would produce 2 GW of energy, making it India’s largest nuclear plant, and significantly increasing India’s nuclear capacity (currently at 4.8 GW or 2.3% of total capacity). Internationally, nuclear power plants contributed 12.3 % of the world's electricity production in 2011. In terms of number of nuclear reactors, India ranks 6th in the world with 20 nuclear reactors (in seven power stations across five states: Rajasthan, Uttar Pradesh, Gujarat, Karnataka and Tamil Nadu). The Kudankulam power station would be Tamil Nadu’s second power station after the Madras Atomic Power Station (MAPS). Tamil Nadu is struggling to meet electricity demand, recently moved the Supreme Court, asking the Centre for more power. Peak demand deficit (the difference between electricity supply and demand at peak periods) in the state was 17.5% in 2011-12. The per capita consumption of electricity in the state was 1,132 kWh in 2009-10, significantly greater than the India average of 779 kWh. Currently, electricity in Tamil Nadu is fueled by a mixture of coal (35% of capacity), renewable sources (42%) and hydro sources (12%). A fully operational Kudankulam reactor would boost Tamil Nadu’s capacity by 6% (including state, private and centrally owned generating entities). The interactive table below provides a state-level breakdown of key power sector indicators. To view data in ascending or descending order, simply click the relevant column heading. (For a detailed overview of the power sector and even more state-wise statistics, see here.) [table id=4 /] Source: Central Electricity Authority; Planning Commission; PRS. Note: capacity for states includes allocated shares in joint and central sector utilities. T&D (transmission and distribution) losses refer to losses in electricity in the process of delivery