The protests against the nuclear power plant at Kudankulam have intensified over the recent weeks.  The Kudankulam plant is expected to provide 2 GW of electricity annually.  However, activists concerned about the risks of nuclear energy are demanding that the plant be shut down.  The safety of nuclear power plants is a technical matter.  In this blog post we discuss the present mechanism to regulate nuclear energy and the legislative proposals to amend this mechanism. Atomic materials and atomic energy are governed by the Atomic Energy Act, 1962.  The Act empowers the central government to produce, develop and use atomic energy.  At present, nuclear safety is regulated by the Atomic Energy Regulatory Board (AERB).  Some of the drawbacks of the present mechanism are discussed below. Key issues under the present nuclear safety regulatory mechanism The AERB is not empowered to operate as an independent operator.  The AERB was established by the government through a notification and not through an Act of Parliament.  Its powers and functions are therefore amendable by the Department of Atomic Energy through executive orders.  The parliamentary oversight exercised upon such executive action is lower than the parliamentary oversight over statutes. [1. The executive action or the Rules are in force from the date of their notification.  They are to be tabled before Parliament mandatorily.  However, an executive action is discussed and put to vote in Parliament only if an objection is raised by a Member of Parliament.  The executive orders may be reviewed by the committee on sub-ordinate legislation.  However, this committee has to oversee a large volume of rules and regulations.  For instance, there were 1264 statutory notifications that were tabled before the Rajya Sabha in 2011-12.] Furthermore, the Atomic Energy Commission that sets out the atomic energy policy, and oversees the functioning of the AERB, is headed by the Secretary, Department of Atomic Energy.  This raises a conflict of interest, as the Department exercises administrative control over NPCIL that operates nuclear power plants. It is pertinent to note that various committee reports, including a CAG Report in 2011, had highlighted the drawbacks in the present regulatory mechanisms and recommended the establishment of a statutory regulator.  A summary of the Report may be accessed here. Proposed mechanism Following the Fukushima nuclear incident in 2011, the Nuclear Safety Regulatory Authority Bill, 2011 was introduced in Parliament to replace the AERB. The Bill establishes the Nuclear Safety Regulatory Authority (NSRA) to regulate nuclear safety, and a Nuclear Safety Council to oversee nuclear safety policies that the NSRA issues.  Under the Bill, all activities related to nuclear power and nuclear materials may only be carried out under a licence issued by the NSRA. Extent of powers and independence of the NSRA The Bill establishes the NSRA as a statutory authority that is empowered to issue nuclear safety policies and regulations.  The Nuclear Safety Council established under the Bill to oversee these policies includes the Secretary, Department of Atomic Energy.  The conflict of interest that exists under the present mechanism may thus continue under the proposed regulatory system. The Bill provides that members of the NSRA can be removed by an order of the central government without a judicial inquiry.  This may affect the independence of the members of the NSRA.  This process is at variance with enactments that establish other regulatory authorities such as TRAI and the Competition Commission of India.  These enactments require a judicial inquiry prior to the removal of a member if it is alleged that he has acquired interest that is prejudicial to the functions of the authority. The proposed legislation also empowers the government to exclude strategic facilities from the ambit of the NSRA.  The government can decide whether these facilities should be brought under the jurisdiction of another regulatory authority. These and other issues arising from the Bill are discussed here.


The Minister of Railways, Dinesh Trivedi, presented the Railways Budget 2012 to Parliament on 14th March.  While commenting on the financial position of Railways, the Minister said that 'the Indian Railways are passing through a difficult phase'. The Operating Ratio for the closing year is now estimated to equal 95%. This is significantly higher than the 91.1% figure budgeted last year. Operating Ratio is a metric that compares operating expenses to revenues. A higher ratio indicates lower ability to generate surplus. Surplus is used for capital investments such as laying of new lines, deploying more coaches etc. Therefore, a smaller surplus affects the Railway’s capability to make such investments. Budget v/s Revised estimates 2011-12 Budget 2011-12 had estimated the performance of Railways for the financial year. Revised estimates have now been submitted. Taken together, these two figures help in comparing actual performance against targets. Some observations are enumerated below:

  • Total receipts decreased by Rs 2,746 crore.
  • Total expenditure increased by Rs 2,102 crore.
  • Operating Ratio increased from 91.1% to 95%. This implies a decrease in surplus.
  • Appropriations to the ‘Development Fund’ and the ‘Capital Fund’ decreased from Rs 5,258 crore to Rs 1,492 crore (a decrease of 72%). The ‘Development Fund’ finances expenditure such as passenger amenities; the ‘Capital Fund’ is used for capital augmentation such as laying of new lines.

Budget estimates 2012-13 In 2012-13, Railways plan to improve Operating Ratio to 84.9% and to increase surplus to Rs 15,557 crore. This is more than 10 times the surplus generated in 2011-12 (Revised Estimates). The effective increase in freight rates is estimated to average 23%. During this time, passenger fares are also estimated to increase by an effective average rate of 19%. [1] Infrastructure Performance during the 11th Plan Under the 11th Five Year Plan, the total plan expenditure for Railways had been approved at Rs 2,33,289 crore. The Outcome Budget shows that the actual expenditure is only likely to be Rs 1,92,291 crore. Thus, expenditure will fall short by Rs 40,998 crore. This gaps exists despite a significant increase in the Gross Budgetary Support approved by Parliament. Plan expenditure during 2007-12 (In Rs Crore)

 

Approved Expenditure

Actual Expenditure

Gross Budgetary Support

63,635

75,979

Internal Resources

90,000

67,763

Extra Budgetary Support

79,654

48,549

Total

2,33,289

1,92,291

The Standing Committee on Railways, in its 11th report presented in August 2011, had sought an explanation from the Ministry. According to the Ministry, lower mobilization of internal resources and lack of extra budgetary support are the main reasons for the shortfall.  Internal resource mobilization has been low because of (i) impact of the 6th Pay Commission; and (ii) slow growth in freight earnings due to the economic slowdown. Extra budgetary resources have been low due to non-materialization of funds through the Public-Private Partnership route. Proposals for the 12th Plan Two recent committees – Kakodkar Committee on Railway Safety and the Pitroda Committee on Railway Modernization – have called for large investments in the next five years. The Kakodkar Committee has recommended an investment of Rs 1,00,000 crore in the next five years to improve safety; the Pitroda Committee has recommended an expenditure of Rs 3,96,000 crore in the next five years on modernization. The Railway sub-group of the 12th Five Year Plan has also estimated a requirement of Rs 4,42,744 crore for various other investments proposed to be undertaken during the Plan period. [2] All three groups have called for significant investments in infrastructure augmentation in the next five years. Budget proposals 2012-13 According to the Minister’s speech, the Annual Plan outlay for the year 2012-13 has been set at Rs 60,100 crore. The plan would be financed through:

  • Gross Budgetary Support of Rs 24,000 crore
  • Railway Safety Fund of Rs 2,000 crore
  • Internal Resources of Rs 18,050 crore
  • Extra Budgetary Resources of Rs 16,050 crore. Of this, Rs 15,000 crore would be borrowed from the market through IRFC (Indian Railway Finance Corporation).

What happens now? The Budget is likely to be discussed in the two Houses within the next few days.  Post the discussion, the Ministry's proposals will be put to vote.  Once passed, the Ministry can put its proposals into action. For more details on the Railway Budget, including the projects proposed this year and the status of proposals made last year, please see our analysis here. To understand some of the challenges faced by the Indian Railways, see our blog post from last year. Notes: [1] The ‘effective average fare’ has been calculated by dividing the total income from the segment (freight/ passenger) by the total traffic (in NTKM/ PKM).  This would vary with changes in fares as well as the usage by different categories of users (including the proportion of tickets booked through Tatkal). [2] Source: Report of the Expert Group on Railway Modernization (Chairman: Sam Pitroda)