Applications for the LAMP Fellowship 2025-26 will open on December 1, 2024. Sign up here to be notified. Last date for submitting the applications is December 21, 2024.

The protests against the nuclear power plant at Kudankulam have intensified over the recent weeks.  The Kudankulam plant is expected to provide 2 GW of electricity annually.  However, activists concerned about the risks of nuclear energy are demanding that the plant be shut down.  The safety of nuclear power plants is a technical matter.  In this blog post we discuss the present mechanism to regulate nuclear energy and the legislative proposals to amend this mechanism. Atomic materials and atomic energy are governed by the Atomic Energy Act, 1962.  The Act empowers the central government to produce, develop and use atomic energy.  At present, nuclear safety is regulated by the Atomic Energy Regulatory Board (AERB).  Some of the drawbacks of the present mechanism are discussed below. Key issues under the present nuclear safety regulatory mechanism The AERB is not empowered to operate as an independent operator.  The AERB was established by the government through a notification and not through an Act of Parliament.  Its powers and functions are therefore amendable by the Department of Atomic Energy through executive orders.  The parliamentary oversight exercised upon such executive action is lower than the parliamentary oversight over statutes. [1. The executive action or the Rules are in force from the date of their notification.  They are to be tabled before Parliament mandatorily.  However, an executive action is discussed and put to vote in Parliament only if an objection is raised by a Member of Parliament.  The executive orders may be reviewed by the committee on sub-ordinate legislation.  However, this committee has to oversee a large volume of rules and regulations.  For instance, there were 1264 statutory notifications that were tabled before the Rajya Sabha in 2011-12.] Furthermore, the Atomic Energy Commission that sets out the atomic energy policy, and oversees the functioning of the AERB, is headed by the Secretary, Department of Atomic Energy.  This raises a conflict of interest, as the Department exercises administrative control over NPCIL that operates nuclear power plants. It is pertinent to note that various committee reports, including a CAG Report in 2011, had highlighted the drawbacks in the present regulatory mechanisms and recommended the establishment of a statutory regulator.  A summary of the Report may be accessed here. Proposed mechanism Following the Fukushima nuclear incident in 2011, the Nuclear Safety Regulatory Authority Bill, 2011 was introduced in Parliament to replace the AERB. The Bill establishes the Nuclear Safety Regulatory Authority (NSRA) to regulate nuclear safety, and a Nuclear Safety Council to oversee nuclear safety policies that the NSRA issues.  Under the Bill, all activities related to nuclear power and nuclear materials may only be carried out under a licence issued by the NSRA. Extent of powers and independence of the NSRA The Bill establishes the NSRA as a statutory authority that is empowered to issue nuclear safety policies and regulations.  The Nuclear Safety Council established under the Bill to oversee these policies includes the Secretary, Department of Atomic Energy.  The conflict of interest that exists under the present mechanism may thus continue under the proposed regulatory system. The Bill provides that members of the NSRA can be removed by an order of the central government without a judicial inquiry.  This may affect the independence of the members of the NSRA.  This process is at variance with enactments that establish other regulatory authorities such as TRAI and the Competition Commission of India.  These enactments require a judicial inquiry prior to the removal of a member if it is alleged that he has acquired interest that is prejudicial to the functions of the authority. The proposed legislation also empowers the government to exclude strategic facilities from the ambit of the NSRA.  The government can decide whether these facilities should be brought under the jurisdiction of another regulatory authority. These and other issues arising from the Bill are discussed here.


On September 14, 2012 the government announced a new FDI policy for the broadcasting sector.  Under the policy, FDI up to 74% has been allowed in broadcasting infrastructure services.  Previously the maximum level of FDI permitted in most infrastructure services in the sector was 49% through automatic route. There could be three reasons for the increase in FDI in the sector.  First, the broadcasting sector is moving towards an addressable (digital) network.  As per Telecom Regulatory Authority of India (TRAI), this upgradation could cost Rs 40,000 crore.  Second, the increase in FDI was mandated because a higher FDI was allowed for telecommunication services, which too are utilised for broadcast purposes.  In telecommunications 74% FDI is allowed under the approval route.  Third, within the broadcasting sector, there was disparity in FDI allowed on the basis of the mode of delivery.  These issues were referred to by TRAI in detail in its recommendations of 2008 and 2010. Recent history of FDI in broadcasting services In 2008 and 2010 TRAI had recommended an increase in the level of FDI permitted.  A comparison of recommendations and the new policy is provided below.   As noted in the table, FDI in services that relate to establishing infrastructure, like setting up transmission hubs and providing services to the customers, is now at 49% under automatic route and 74% with government approval.  FDI in media houses, on the other hand, have a different level of FDI permitted. TRAI’s recommendations on the two aspects of FDI in broadcasting Digitisation of cable television network:  The Cable Televisions Networks Act, 1995 was amended in 2011 to require cable television networks to be digitised.  By October 31, 2012 all cable subscriptions in Delhi, Mumbai, Chennai and Kolkata are required to be digitised.  The time frame for digitisation for the entire country is December 31, 2014.   However, this requires investment to establish infrastructure. As per the TRAI 2010 report, there are a large number of multi-system operators (who receive broadcasting signals and transmit them further to the cable operator or on their own).  As per the regulator, this has led to increased fragmentation of the industry, sub-optimal funding and poor services.  Smaller cable operators do not have the resources to provide set-top boxes and enjoy economies of scale.  As per news reports, the announcement of higher FDI permission would enable the TV distribution industry to meet the October 31 deadline for mandatory digitisation in the four metros. Diversity in television services:  FDI in transmitting signals from India to a satellite hub for further transmission (up-linking services) has not been changed.  This varies on the basis of the nature of the channel.  For non-news channels, FDI up to 100% with government approval was allowed even under the previous policy.  However, the FDI limit for news channels is 26% with government approval. In 2008 TRAI had recommended that this be increased to 49%.  However, it reviewed its position in 2010.  It argued that since FM and up-linking of news channels had the ability to influence the public, the existing FDI level of 26% was acceptable.  It also relied upon the level of FDI permitted in the press, stating that parity had to be maintained between the two modes of broadcast.  Under the new policy the level of FDI permitted in these sectors has not been changed.