The protests against the nuclear power plant at Kudankulam have intensified over the recent weeks.  The Kudankulam plant is expected to provide 2 GW of electricity annually.  However, activists concerned about the risks of nuclear energy are demanding that the plant be shut down.  The safety of nuclear power plants is a technical matter.  In this blog post we discuss the present mechanism to regulate nuclear energy and the legislative proposals to amend this mechanism. Atomic materials and atomic energy are governed by the Atomic Energy Act, 1962.  The Act empowers the central government to produce, develop and use atomic energy.  At present, nuclear safety is regulated by the Atomic Energy Regulatory Board (AERB).  Some of the drawbacks of the present mechanism are discussed below. Key issues under the present nuclear safety regulatory mechanism The AERB is not empowered to operate as an independent operator.  The AERB was established by the government through a notification and not through an Act of Parliament.  Its powers and functions are therefore amendable by the Department of Atomic Energy through executive orders.  The parliamentary oversight exercised upon such executive action is lower than the parliamentary oversight over statutes. [1. The executive action or the Rules are in force from the date of their notification.  They are to be tabled before Parliament mandatorily.  However, an executive action is discussed and put to vote in Parliament only if an objection is raised by a Member of Parliament.  The executive orders may be reviewed by the committee on sub-ordinate legislation.  However, this committee has to oversee a large volume of rules and regulations.  For instance, there were 1264 statutory notifications that were tabled before the Rajya Sabha in 2011-12.] Furthermore, the Atomic Energy Commission that sets out the atomic energy policy, and oversees the functioning of the AERB, is headed by the Secretary, Department of Atomic Energy.  This raises a conflict of interest, as the Department exercises administrative control over NPCIL that operates nuclear power plants. It is pertinent to note that various committee reports, including a CAG Report in 2011, had highlighted the drawbacks in the present regulatory mechanisms and recommended the establishment of a statutory regulator.  A summary of the Report may be accessed here. Proposed mechanism Following the Fukushima nuclear incident in 2011, the Nuclear Safety Regulatory Authority Bill, 2011 was introduced in Parliament to replace the AERB. The Bill establishes the Nuclear Safety Regulatory Authority (NSRA) to regulate nuclear safety, and a Nuclear Safety Council to oversee nuclear safety policies that the NSRA issues.  Under the Bill, all activities related to nuclear power and nuclear materials may only be carried out under a licence issued by the NSRA. Extent of powers and independence of the NSRA The Bill establishes the NSRA as a statutory authority that is empowered to issue nuclear safety policies and regulations.  The Nuclear Safety Council established under the Bill to oversee these policies includes the Secretary, Department of Atomic Energy.  The conflict of interest that exists under the present mechanism may thus continue under the proposed regulatory system. The Bill provides that members of the NSRA can be removed by an order of the central government without a judicial inquiry.  This may affect the independence of the members of the NSRA.  This process is at variance with enactments that establish other regulatory authorities such as TRAI and the Competition Commission of India.  These enactments require a judicial inquiry prior to the removal of a member if it is alleged that he has acquired interest that is prejudicial to the functions of the authority. The proposed legislation also empowers the government to exclude strategic facilities from the ambit of the NSRA.  The government can decide whether these facilities should be brought under the jurisdiction of another regulatory authority. These and other issues arising from the Bill are discussed here.


The Saansad Adarsh Gram Yojana was launched last week, for the development of model villages.  Under the Yojana, Members of Parliament (MPs) will be responsible for developing the socio-economic and physical infrastructure of three villages each by 2019, and a total of eight villages each by 2024.

The first Adarsh Gram must be developed by 2016, and two more by 2019.  From 2019 to 2024, five more Adarsh Grams must be developed by each MP, one each year.  This implies that a total of 6,433 Adarsh Grams, of the 2,65,000 gram panchayats, will be created by 2024. Key features of the Yojana are outlined below.

Objectives

Key objectives of the Yojana include:

  1. The development of model villages, called Adarsh Grams, through the implementation of existing schemes, and certain new initiatives to be designed for the local context, which may vary from village to village.
  2. Creating models of local development which can be replicated in other villages.

Identification of villages

MPs can select any gram panchayat, other than their own village or that of their spouse, to be developed as an Adarsh Gram.  The village must have a population of 3000-5000 people if it is located in the plains, or 1000-3000 people if located in hilly areas.

Lok Sabha MPs can choose a village from their constituency, and Rajya Sabha MPs from the state from which they are elected.  Nominated members can choose a village from any district of the country.  MPs which represent urban constituencies can identify a village from a neighbouring rural constituency.

Funding

No new funds have been allocated for the Yojana.  Resources may be raised through:

  1. Funds from existing schemes, such as the Indira Awas Yojana, Pradhan Mantri Gram Sadak Yojana, Mahatma Gandhi National Rural Employment Guarantee Scheme, and Backward Regions Grant Fund, etc.,
  2. The Member of Parliament Local Area Development Scheme (MPLADS),
  3. The gram panchayat’s own revenue,
  4. Central and State Finance Commission Grants, and
  5. Corporate Social Responsibility funds.

Implementation

A Village Development Plan must be created for each Adarsh Gram.  While each village will develop a list of activities to be carried out, based on its own resources and requirements, possible activities have been listed in the guidelines for the scheme.  For example, Adarsh Grams can work towards providing universal access to basic healthcare facilities, promoting diversified livelihoods through agriculture related livelihoods and skill development, providing pension for all eligible families, housing for all, and promoting social forestry.

The table below outlines key functionaries at the national, state, district, and village level and their responsibilities.

Table 1: Roles and responsibilities of key functionaries

Level Functionary Key roles and responsibilities
National Member of Parliament
  • Identify the Adarsh Gram
  • Facilitate the planning process
  • Mobilise additional funds
  • Monitor the scheme
  Two committees, headed by the Minister of Rural Development, and Secretary, Rural Development, respectively.*
  • Monitor the process of identification and planning
  • Review the implementation of the scheme
  • Identify bottlenecks in the scheme
  • Issue operational guidelines
  • Indicate specific resource support which each Ministry can provide
State A committee headed by the Chief Secretary
  • Supplement central guidelines for the scheme
  • Review Village Development Plans
  • Review implementation
  • Outline monitoring mechanisms
  • Design a grievance redressal mechanism for the scheme
District District Collector
  • Conduct the baseline survey
  • Facilitate the preparation of the Village Development Plan
  • Converge relevant schemes
  • Ensure grievance redressal
  • Monthly progress review of the scheme
Village Gram Panchayat and functionaries of schemes (at various levels)
  • Implement of the scheme
  • Identify common needs of the village
  • Leverage resources from various programmes
  • Ensure participation in the scheme

Note: *These committees will include members from other Ministries.

Sources: Saansad Adarsh Gram Yojana Guidelines, Ministry of Rural Development; PRS

Monitoring

A web based monitoring system will be established to enable the MP and other stakeholders to monitor the scheme.  Outputs relating to physical and financial targets will be measured each quarter.  A mid-term evaluation and post-project evaluation will be conducted through an independent agency.