The protests against the nuclear power plant at Kudankulam have intensified over the recent weeks.  The Kudankulam plant is expected to provide 2 GW of electricity annually.  However, activists concerned about the risks of nuclear energy are demanding that the plant be shut down.  The safety of nuclear power plants is a technical matter.  In this blog post we discuss the present mechanism to regulate nuclear energy and the legislative proposals to amend this mechanism. Atomic materials and atomic energy are governed by the Atomic Energy Act, 1962.  The Act empowers the central government to produce, develop and use atomic energy.  At present, nuclear safety is regulated by the Atomic Energy Regulatory Board (AERB).  Some of the drawbacks of the present mechanism are discussed below. Key issues under the present nuclear safety regulatory mechanism The AERB is not empowered to operate as an independent operator.  The AERB was established by the government through a notification and not through an Act of Parliament.  Its powers and functions are therefore amendable by the Department of Atomic Energy through executive orders.  The parliamentary oversight exercised upon such executive action is lower than the parliamentary oversight over statutes. [1. The executive action or the Rules are in force from the date of their notification.  They are to be tabled before Parliament mandatorily.  However, an executive action is discussed and put to vote in Parliament only if an objection is raised by a Member of Parliament.  The executive orders may be reviewed by the committee on sub-ordinate legislation.  However, this committee has to oversee a large volume of rules and regulations.  For instance, there were 1264 statutory notifications that were tabled before the Rajya Sabha in 2011-12.] Furthermore, the Atomic Energy Commission that sets out the atomic energy policy, and oversees the functioning of the AERB, is headed by the Secretary, Department of Atomic Energy.  This raises a conflict of interest, as the Department exercises administrative control over NPCIL that operates nuclear power plants. It is pertinent to note that various committee reports, including a CAG Report in 2011, had highlighted the drawbacks in the present regulatory mechanisms and recommended the establishment of a statutory regulator.  A summary of the Report may be accessed here. Proposed mechanism Following the Fukushima nuclear incident in 2011, the Nuclear Safety Regulatory Authority Bill, 2011 was introduced in Parliament to replace the AERB. The Bill establishes the Nuclear Safety Regulatory Authority (NSRA) to regulate nuclear safety, and a Nuclear Safety Council to oversee nuclear safety policies that the NSRA issues.  Under the Bill, all activities related to nuclear power and nuclear materials may only be carried out under a licence issued by the NSRA. Extent of powers and independence of the NSRA The Bill establishes the NSRA as a statutory authority that is empowered to issue nuclear safety policies and regulations.  The Nuclear Safety Council established under the Bill to oversee these policies includes the Secretary, Department of Atomic Energy.  The conflict of interest that exists under the present mechanism may thus continue under the proposed regulatory system. The Bill provides that members of the NSRA can be removed by an order of the central government without a judicial inquiry.  This may affect the independence of the members of the NSRA.  This process is at variance with enactments that establish other regulatory authorities such as TRAI and the Competition Commission of India.  These enactments require a judicial inquiry prior to the removal of a member if it is alleged that he has acquired interest that is prejudicial to the functions of the authority. The proposed legislation also empowers the government to exclude strategic facilities from the ambit of the NSRA.  The government can decide whether these facilities should be brought under the jurisdiction of another regulatory authority. These and other issues arising from the Bill are discussed here.


Earlier this week, Lok Sabha passed the Bill that provides for the allocation of coal mines that were cancelled by the Supreme Court last year.  In light of this development, this post looks at the issues surrounding coal block allocations and what the 2015 Bill seeks to achieve.

In September 2014, the Supreme Court cancelled the allocations of 204 coal blocks.  Following the Supreme Court judgement, in October 2014, the government promulgated the Coal Mines (Special Provisions) Ordinance, 2014 for the allocation of the cancelled coal mines.  The Ordinance, which was replaced by the Coal Mines (Special Provisions) Bill, 2014, could not be passed by Parliament in the last winter session, and lapsed. The government then promulgated the Coal Mines (Special Provisions) Second Ordinance, 2014 on December 26, 2014.  The Coal Mines (Special Provisions) Bill, 2015 replaces the second Ordinance and was passed by Lok Sabha on March 4, 2015. Why is coal considered relevant? Coal mining in India has primarily been driven by the need for energy domestically.  About 55% of the current commercial energy use is met by coal.  The power sector is the major consumer of coal, using about 80% of domestically produced coal. As of April 1, 2014, India is estimated to have a cumulative total of 301.56 billion tonnes of coal reserves up to a depth of 1200 meters.  Coal deposits are mainly located in Jharkhand, Odisha, Chhattisgarh, West Bengal, Madhya Pradesh, Andhra Pradesh and Maharashtra. How is coal regulated? The Ministry of Coal has the overall responsibility of managing coal reserves in the country.  Coal India Limited, established in 1975, is a public sector undertaking, which looks at the production and marketing of coal in India.  Currently, the sector is regulated by the ministry’s Coal Controller’s Organization. The Coal Mines (Nationalisation) Act, 1973 (CMN Act) is the primary legislation determining the eligibility for coal mining in India.  The CMN Act allows private Indian companies to mine coal only for captive use.  Captive mining is the coal mined for a specific end-use by the mine owner, but not for open sale in the market.  End-uses currently allowed under the CMN Act include iron and steel production, generation of power, cement production and coal washing.  The central government may notify additional end-uses. How were coal blocks allocated so far? Till 1993, there were no specific criteria for the allocation of captive coal blocks.  Captive mining for coal was allowed in 1993 by amendments to the CMN Act.  In 1993, a Screening Committee was set up by the Ministry of Coal to provide recommendations on allocations for captive coal mines.  All allocations to private companies were made through the Screening Committee.  For government companies, allocations for captive mining were made directly by the ministry.  Certain coal blocks were allocated by the Ministry of Power for Ultra Mega Power Projects (UMPP) through tariff based competitive bidding (bidding for coal based on the tariff at which power is sold).  Between 1993 and 2011, 218 coal blocks were allocated to both public and private companies under the CMN Act. What did the 2014 Supreme Court judgement do? In August 2012, the Comptroller and Auditor General of India released a report on the coal block allocations. CAG recommended that the allocation process should be made more transparent and objective, and done through competitive bidding. Following this report, in September 2012, a Public Interest Litigation matter was filed in the Supreme Court against the coal block allocations.  The petition sought to cancel the allotment of the coal blocks in public interest on grounds that it was arbitrary, illegal and unconstitutional. In September 2014, the Supreme Court declared all allocations of coal blocks, made through the Screening Committee and through Government Dispensation route since 1993, as illegal.  It cancelled the allocation of 204 out of 218 coal blocks.  The allocations were deemed illegal on the grounds that: (i) the allocation procedure followed by the Screening Committee was arbitrary, and (ii) no objective criterion was used to determine the selection of companies.  Further, the allocation procedure was held to be impermissible under the CMN Act. Among the 218 coal blocks, 40 were under production and six were ready to start production.  Of the 40 blocks under production, 37 were cancelled and of the six ready to produce blocks, five were cancelled.  However, the allocation to Ultra Mega Power Projects, which was done via competitive bidding for lowest tariffs, was not declared illegal. What does the 2015 Bill seek to do? Following the cancellation of the coal blocks, concerns were raised about further shortage in the supply of coal, resulting in more power supply disruptions.  The 2015 Bill primarily seeks to allocate the coal mines that were declared illegal by the Supreme Court.  It provides details for the auction process, compensation for the prior allottees, the process for transfer of mines and details of authorities that would conduct the auction.  In December 2014, the ministry notified the Coal Mines (Special Provisions) Rules, 2014.  The Rules provide further guidelines in relation to the eligibility and compensation for prior allottees. How is the allocation of coal blocks to be carried out through the 2015 Bill? The Bill creates three categories of mines, Schedule I, II and III.  Schedule I consists of all the 204 mines that were cancelled by the Supreme Court.  Of these mines, Schedule II consists of all the 42 mines that are under production and Schedule III consists of 32 mines that have a specified end-use such as power, iron and steel, cement and coal washing. Schedule I mines can be allocated by way of either public auction or allocation.  For the public auction route any government, private or joint venture company can bid for the coal blocks.  They can use the coal mined from these blocks for their own consumption, sale or for any other purpose as specified in their mining lease.  The government may also choose to allot Schedule I mines to any government company or any company that was awarded a power plant project through competitive bidding.  In such a case, a government company can use the coal mined for own consumption or sale.  However, the Bill does not provide clarity on the purpose for which private companies can use the coal. Schedule II and III mines are to be allocated by way of public auction, and the auctions have to be completed by March 31, 2015.  Any government company, private company or a joint venture with a specified end-use is eligible to bid for these mines. In addition, the Bill also provides details on authorities that would conduct the auction and allotment and the compensation for prior allottees.  Prior allottees are not eligible to participate in the auction process if: (i) they have not paid the additional levy imposed by the Supreme Court; or (ii) if they are convicted of an offence related to coal block allocation and sentenced to imprisonment of more than three years. What are some of the issues to consider in the 2015 Bill? One of the major policy shifts the 2015 Bill seeks to achieve is to enable private companies to mine coal in the future, in order to improve the supply of coal in the market.  Currently, the coal sector is regulated by the Coal Controller’s Organization, which is under the Ministry of Coal.  The Bill does not establish an independent regulator to ensure a level playing field for both private and government companies bidding for auction of mines to conduct coal mining operations.   In the past, when other sectors have opened up to the private sector, an independent regulatory body has been established beforehand.  For example, the Telecom Regulatory Authority of India, an independent regulatory body, was established when the telecom sector was opened up for private service providers.  The Bill also does not specify any guidelines on the monitoring of mining activities by the new allottees. While the Bill provides broad details of the process of auction and allotment, the actual results with regards to money coming in to the states, will depend more on specific details, such as the tender documents and floor price.  It is also to be seen whether the new allotment process ensures equitable distribution of coal blocks among the companies and creates a fair, level-playing field for them.  In the past, the functioning of coal mines has been delayed due to delays in land acquisition and environmental clearances.  This Bill does not address these issues.  The auctioning of coal blocks resulting in improving the supply of coal, and in turn addressing the problem of power shortage in the country, will also depend on the efficient functioning of the mines,  in addition to factors such as transparent allocations.