The protests against the nuclear power plant at Kudankulam have intensified over the recent weeks. The Kudankulam plant is expected to provide 2 GW of electricity annually. However, activists concerned about the risks of nuclear energy are demanding that the plant be shut down. The safety of nuclear power plants is a technical matter. In this blog post we discuss the present mechanism to regulate nuclear energy and the legislative proposals to amend this mechanism. Atomic materials and atomic energy are governed by the Atomic Energy Act, 1962. The Act empowers the central government to produce, develop and use atomic energy. At present, nuclear safety is regulated by the Atomic Energy Regulatory Board (AERB). Some of the drawbacks of the present mechanism are discussed below. Key issues under the present nuclear safety regulatory mechanism The AERB is not empowered to operate as an independent operator. The AERB was established by the government through a notification and not through an Act of Parliament. Its powers and functions are therefore amendable by the Department of Atomic Energy through executive orders. The parliamentary oversight exercised upon such executive action is lower than the parliamentary oversight over statutes. [1. The executive action or the Rules are in force from the date of their notification. They are to be tabled before Parliament mandatorily. However, an executive action is discussed and put to vote in Parliament only if an objection is raised by a Member of Parliament. The executive orders may be reviewed by the committee on sub-ordinate legislation. However, this committee has to oversee a large volume of rules and regulations. For instance, there were 1264 statutory notifications that were tabled before the Rajya Sabha in 2011-12.] Furthermore, the Atomic Energy Commission that sets out the atomic energy policy, and oversees the functioning of the AERB, is headed by the Secretary, Department of Atomic Energy. This raises a conflict of interest, as the Department exercises administrative control over NPCIL that operates nuclear power plants. It is pertinent to note that various committee reports, including a CAG Report in 2011, had highlighted the drawbacks in the present regulatory mechanisms and recommended the establishment of a statutory regulator. A summary of the Report may be accessed here. Proposed mechanism Following the Fukushima nuclear incident in 2011, the Nuclear Safety Regulatory Authority Bill, 2011 was introduced in Parliament to replace the AERB. The Bill establishes the Nuclear Safety Regulatory Authority (NSRA) to regulate nuclear safety, and a Nuclear Safety Council to oversee nuclear safety policies that the NSRA issues. Under the Bill, all activities related to nuclear power and nuclear materials may only be carried out under a licence issued by the NSRA. Extent of powers and independence of the NSRA The Bill establishes the NSRA as a statutory authority that is empowered to issue nuclear safety policies and regulations. The Nuclear Safety Council established under the Bill to oversee these policies includes the Secretary, Department of Atomic Energy. The conflict of interest that exists under the present mechanism may thus continue under the proposed regulatory system. The Bill provides that members of the NSRA can be removed by an order of the central government without a judicial inquiry. This may affect the independence of the members of the NSRA. This process is at variance with enactments that establish other regulatory authorities such as TRAI and the Competition Commission of India. These enactments require a judicial inquiry prior to the removal of a member if it is alleged that he has acquired interest that is prejudicial to the functions of the authority. The proposed legislation also empowers the government to exclude strategic facilities from the ambit of the NSRA. The government can decide whether these facilities should be brought under the jurisdiction of another regulatory authority. These and other issues arising from the Bill are discussed here.
On March 14, 2022 Rajya Sabha discussed the working of the Ministry of Development of North Eastern Region (DoNER). During the discussion, several issues around budgetary allocation, implementation of schemes and connectivity with the North Eastern Region were discussed. The Ministry of DoNER is responsible for matters relating to the planning, execution and monitoring of development schemes and projects in the North Eastern Region. In this blog post, we analyse the 2022-23 budgetary allocations for the Ministry and discuss related issues.
A new scheme named PM-DevINE announced to boost infrastructure and social development
In 2022-23, the Ministry has seen a 5% increase in allocation from the revised estimates of 2021-22. The Ministry has been allocated Rs 2,800 crore which will be used for various development schemes, such as the North East Special Infrastructure Development Scheme and North East Road Sector Development Scheme. A scheme-wise break-up of the budget allocation for the Ministry is given below in Table 1.
One of the key highlights of the Finance Minister’s Budget Speech was the announcement of a new scheme named the Prime Minister’s Development Initiative for North East (PM-DevINE). It will be implemented through the North East Council (nodal agency for the economic and social development of the North Eastern Region). PM-DevINE will fund infrastructure and social development projects in areas such as road connectivity, health, and agriculture. The scheme will not replace or subsume existing central sector or centrally sponsored schemes. The Scheme will be given an initial allocation of Rs 1,500 crore.
Table 1: Break-up of allocation to the Ministry of DoNER (in Rs crore)
Major Heads |
2020-21 Actuals |
2021-22 BE |
2021-22 RE |
2022-23 BE |
% change from 2021-22 RE to 2022-23 BE |
North East Special Infrastructure Development Scheme |
446 |
675 |
674 |
1,419 |
111% |
Schemes of North East Council |
567 |
585 |
585 |
702 |
20% |
North East Road Sector Development Scheme |
416 |
696 |
674 |
496 |
-26% |
Central pool of resources for North East and Sikkim |
342 |
581 |
581 |
- |
- |
Others |
270 |
322 |
344 |
241 |
-30% |
Total |
1,854 |
2,658 |
2,658 |
2,800 |
5% |
Note: BE – Budget Estimate; RE – Revised Estimate; Schemes for North East Council includes Special Development Projects.
Sources: Demand No. 23 of Union Budget Documents 2022-23; PRS.
Allocation towards capital outlay less than demand
The Standing Committee on Home Affairs (2022) noted that the amount allocated at the budget stage in 2022-23 (Rs 660 crore) was 17% less than the demand by the Ministry (Rs 794 crore). Capital expenditure includes capital outlay which leads to the creation of assets such as schools, hospitals, and roads and bridges. The Committee observed that this may severely affect the implementation of several projects and schemes that require capital outlay. It recommended the Ministry to take up this matter with the Finance Ministry and demand additional assistance at the revised stage of the 2022-23 financial year.
Underutilisation of funds over the years
Since 2011-12 (barring 2016-17), the Ministry has not been able to utilise the funds allocated to it at the budgeted stage (See Figure 1). For instance, in 2020-21, fund utilisation in case of the North East Road Sector Development Scheme was 52%, whereas only 34% of funds were utilised under the North East Special Infrastructure Development Scheme (for infrastructure projects relating to water supply, power, connectivity, social infrastructure). Key reasons for underspending highlighted by the Ministry include late receipt of project proposals and non-receipt of utilisation certificates from state governments.
Figure 1: Underutilisation of funds by the Ministry since 2011-12
Note: Revised Estimate has been used as the Actual Expenditure for 2021-22.
Sources: Union Budget Documents (2011-12 to 2022-23); PRS.
Delay in project completion
The Ministry implements several schemes for infrastructural projects such as roads and bridges. The progress of the certain schemes has been inadequate. The Standing Committee (2022) observed that the physical progress of many road sector projects under the North East Road Sector Development Scheme is either at zero or in single digit percent in spite of release of the amount for the project. Similarly, projects under the Karbi Anglong Autonomous Territorial Council (autonomous district council in Assam) and Social and Infrastructure Development Fund (construction of roads, bridges, and construction of schools and water supply projects in the North Eastern Region) have seen inadequate progress.
Need to address declining forest cover
The Standing Committee (2021) has also recommended the Ministry of DoNER to work towards preserving forest cover. The Committee took note of the declining forest cover in the North East India. As per the India State of Forest Report (2021), states showing major loss of forest cover from 2019 to 2021 are: (i) Arunachal Pradesh (loss of 257 sq km of forest cover), (ii) Manipur (249 sq km), (iii) Nagaland (235 sq km), (iv) Mizoram (186 sq km), and (v) Meghalaya (73 sq km). The loss of forest cover may be attributed to shifting cultivation, cutting down of trees, natural calamities, anthropogenic (environmental pollution) pressure, and developmental activities. The Committee recommended that various measures to protect the forest and environment must be given priority and should implemented within the stipulated timeline. It also suggested the Ministry to: (i) carry out regular plantation drives to increase forest cover/density, and (ii) accord priority towards the ultimate goal of preserving and protecting the forests under various centrally sponsored initiatives.
Key issues raised by Members during discussion in Rajya Sabha
The discussion on the working of the Ministry of DoNER took place in Rajya Sabha on March 14, 2022. One of the issues highlighted by members was about the Ministry not having its own line Department. This leads to the Ministry being dependent on the administrative strength of the states for implementation of projects. Another issue highlighted by several members was the lack of connectivity of the region through railways and road networks which hampers the economic growth of region. The DoNER Minister in his response to the House assured the members that the central government is making continuous efforts towards improving connectivity to the North East region through roads, railways, waterways, and telecommunication.
Allocation by Union Ministries to the North East
Union Ministries allocate 10% of their budget allocation for the North East (See Figure 2 for fund allocation and utilisation). The Ministry of DoNER is the nodal Ministry that monitors and keeps track of the allocation done by various Ministries. In 2022-23, Rs 76,040 crore has been allocated by all the Ministries for the North Eastern region. The allocation has increased by 11% from the revised estimate of 2021-22 (Rs 68,440 crore). In 2019-20 and 2021-21 the actual expenditure towards North Eastern areas was lower than budget estimates by 18% and 19% respectively.
Figure 2: Budgetary allocation by all Union Ministries for the North East (amount in Rs crore)
Source: Report No. 239: Demand for Grants (2022-23) of Ministry of Development of North Eastern Region, Standing Committee on Home Affairs; PRS.