In India, one of the common threads that run through many of the corruption scandals is the issue of conflict of interest i.e. public officials taking policy decisions based on their personal interest. For example, Shashi Tharoor in the IPL controversy or Ashok Chavan in the Adarsh Housing Society scam. Many countries take measures to minimize conflict of interest of its MPs by regulating membership of parliamentarians in Committees, making it mandatory for them to declare pecuniary interest, and restricting employment both during and after completion of tenure. For example, the US Senate has a detailed Code of Official Conduct that provides guidelines on conflict of interest. India also has some measures in place to minimize conflict of interest. These are codified in the Code of Conduct for Ministers, Code of Conduct for Members of the Rajya Sabha, Rules of Procedure and Conduct of Business in the Lok Sabha and Rajya Sabha and Handbook for Members of Lok Sabha and Rajya Sabha. Every Rajya Sabha MP has to declare his or her interest (along with assets and liabilities). He has to declare five pecuniary interests: remunerative directorship, remunerated activity, majority shareholding, paid consultancy and professional engagement. Lok Sabha MPs can object to another MP joining a parliamentary committee on grounds that he has personal, pecuniary or direct interest. (For more details, see PRS note on Conflict of Interest Issues in Parliament). On December 1, 2010, PRS held its annual Conference on Effective Legislatures. One of the topics discussed was MPs and Conflict of Interest: Issues and Resolution. Panelists included D Raja, Prakash Javdekar and Supriya Sule. Issues such as requirement for transparency, expertise of legislators, election of honest legislators, and ethical media were discussed. The issues that were raised during the discussion are summarised in the PRS Summary of Proceedings from the Conference.
Reports suggest that the first reactor of the Kudankulam power plant is close to operational. With state discoms struggling, advocates of nuclear power see Kudankulam as a necessary boost to India’s struggling power sector. The Kudankulam power plant will have two reactors. At full capacity, the plant would produce 2 GW of energy, making it India’s largest nuclear plant, and significantly increasing India’s nuclear capacity (currently at 4.8 GW or 2.3% of total capacity). Internationally, nuclear power plants contributed 12.3 % of the world's electricity production in 2011. In terms of number of nuclear reactors, India ranks 6th in the world with 20 nuclear reactors (in seven power stations across five states: Rajasthan, Uttar Pradesh, Gujarat, Karnataka and Tamil Nadu). The Kudankulam power station would be Tamil Nadu’s second power station after the Madras Atomic Power Station (MAPS). Tamil Nadu is struggling to meet electricity demand, recently moved the Supreme Court, asking the Centre for more power. Peak demand deficit (the difference between electricity supply and demand at peak periods) in the state was 17.5% in 2011-12. The per capita consumption of electricity in the state was 1,132 kWh in 2009-10, significantly greater than the India average of 779 kWh. Currently, electricity in Tamil Nadu is fueled by a mixture of coal (35% of capacity), renewable sources (42%) and hydro sources (12%). A fully operational Kudankulam reactor would boost Tamil Nadu’s capacity by 6% (including state, private and centrally owned generating entities). The interactive table below provides a state-level breakdown of key power sector indicators. To view data in ascending or descending order, simply click the relevant column heading. (For a detailed overview of the power sector and even more state-wise statistics, see here.) [table id=4 /] Source: Central Electricity Authority; Planning Commission; PRS. Note: capacity for states includes allocated shares in joint and central sector utilities. T&D (transmission and distribution) losses refer to losses in electricity in the process of delivery