A recent news report stated that the Planning Commission has advocated putting in place a “proper regulatory mechanism” before permitting the use of genetic modification in Indian crops.  A recent Standing Committee report on genetically modified (GM) crops found shortcomings in the regulatory framework for such crops.  The current framework is regulated primarily by two bodies: the Genetic Engineering Appraisal Committee (GEAC) and the Review Committee on Genetic Manipulation (RCGM).  Given the inadequacy of the regulatory framework, the Standing Committee recommended that all research and development activities on transgenic crops be carried out only in containment (in laboratories) and that ongoing field trials in all states be discontinued.  The blog provides a brief background on GM crops, their regulation in India and the key recommendations of the Standing Committee. What is GM technology? GM crops are usually developed through the insertion or deletion of genes from plant cells.  Bt technology is a type of genetic modification in crops.  It was introduced in India with Bt cotton.  The debate around GM crops has revolved around issues of economic efficacy, human health, consumer choice and farmers’ rights.  Some advantages of Bt technology are that it increases crop yield, decreases the use of pesticides, and improves quality of crops.  However, the technology has also been known to cause crop loss due to resistance developed by pests and destruction of local crop varieties, impacting biodiversity. Approval process for commercial release of GM crops

  1. Initially, the company developing the GM crop undertakes several biosafety assessments including, environmental, food, and feed safety assessments in containment.
  2. This is followed by Bio-safety Research Trials which require prior approval of the regulators, the GEAC and the RCGM.
  3. Approval for environmental release is accorded by the GEAC after considering the findings of bio-safety studies.
  4. Finally, commercial release is permitted only for those GM crops found to be safe for humans and the environment.

Committee’s recommendations for strengthening the regulatory process The Standing Committee report found several shortcomings in the regulatory framework, some of which are as follows:

  • State governments are not mandatorily consulted for conducting open field trials on GM crops.  Several states such as Kerala and Bihar have opposed field trials for GM crops.  The Committee recommended that mandatory consultation with state governments be built into the regulatory process.
  • The key regulators, the GEAC and the RCGM, suffer from poor organisational set-up and infrastructure.  The Committee recommended that the regulatory framework be given statutory backing so that there is no scope for ambiguity or complacency on the part of the authorities responsible for the oversight of GM organisms.  It urged the government to introduce the Biotechnology Regulatory Authority Bill.
  • There is evidence that the GEAC has not complied with international treaties.  These include the Cartagena Protocol on Biosafety and the Rio Declaration on Environment and Development.  It recommended that legislation relating to liability and redress for damage arising from living modified organisms be enacted.
  • Some international scientists have raised doubts about the safety of Bt Brinjal and the way tests were conducted.  To remedy this situation, the Committee recognised the need for an overarching legislation on biosafety to ensure that biotechnology is introduced without compromising the safety of biodiversity, human and livestock health, and environmental protection.

Note that over the last few sessions of Parliament, the government has listed the Biotechnology Regulatory Authority Bill for introduction; however the Bill has not been introduced yet.  The Bill sets up an independent authority for the regulation of GM crops. For a PRS summary of the report and access to the full report, see here and here.

In recent news reports there have been deliberations on whether there is a possibility of appealing a central government decision on forest clearances.  In this context, the National Green Tribunal (NGT) has directed states to comply with the statutory requirement of passing an order notifying diversion of forest land for non-forest purposes.  It has also held that it can hear appeals from the orders of state governments and other authorities on forest clearances. The NGT was established in 2010 to deal with cases relating to environmental protection, and conservation of forests and other natural resources.  The need was felt to have a mechanism to hear appeals filed by aggrieved citizens against government orders on forest clearances.  For instance, the NGT can hear appeals against an order of the appellate authority, state government or pollution control board under the Water (Prevention and Control of Pollution) Act, 1974. How is a forest clearance obtained? Obtaining a forest clearance is a key step in the process of setting up a project.  Recently the Chhatrasal coal mine allotted to Reliance Power's 4,000 MW Sasan thermal power project in Madhya Pradesh has received forest clearance.  The Ministry of Environment and Forests (MoEF) first gives ‘in-principle’ approval to divert forest land for non-forest purposes based on the recommendations of the Forest Advisory Committee.  This approval is subject to the project developer complying with certain conditions.  Once these conditions are complied with, the central government issues the final clearance.  It is only after this clearance that the state government passes an order notifying the diversion of forest land.  The NGT’s decision deals with this point in the process during which an appeal can be filed against the order of forest clearance.  For the flowchart put out by the MoEF on the procedure for obtaining a forest clearance, see here. What was the NGT’s ruling on forest clearances? The NGT was hearing an appeal against a forest clearance given by the MoEF to divert 61 hectares of forest land for a hydroelectric project by GMR in Uttarakhand.  The NGT has ruled  that it does not have the jurisdiction to hear appeals against forest clearances given to projects by the MoEF.  However, the NGT has the power to hear appeals on an order or decision made by a state government or other authorities under the Forest (Conservation) Act, 1980.  The judgment observed that though Section 2 of the Forest (Conservation) Act, 1980 requires that state governments pass separate orders notifying the diversion of land, this requirement is not being followed.  The NGT has directed that state governments pass a reasoned order notifying the diversion of the forest land for non-forest purposes, immediately after the central government has given its clearance.  This will allow aggrieved citizens to challenge the forest clearance of a project after the state government has passed an order.  Additionally, the NGT has also directed the MoEF to issue a notification streamlining the procedure to be adopted by state governments and other authorities for passing orders granting forest clearance under section 2 of the Forest (Conservation) Act, 1980. There are some concerns that an appeal to the NGT can only be made after the state government has passed an order notifying the diversion of forest land and significant resources have been invested in the project. What is the status of applications for forest clearances made to the MoEF? The MoEF has given approval to 1126 proposals that involve the diversion of 15,639 hectares of forest land from July 13, 2011 to July 12, 2012.  The category of projects accorded the most number of approvals was road projects (308) followed by transmission lines (137).  Some of the other categories of projects that received clearance for a significant number of projects were mining, hydel and irrigation projects.  However, most land was diverted for mining related projects i.e., 40% of the total forest land diverted in this period.  Figure 1 shows a break up of the extent of forest land diverted for various categories of projects.  The number of forest clearances pending for decision by the MoEF for applications made in the years 2012, 2011 and 2010 are 197, 129 and 48 respectively. [i]

Source: “Environmental Clearance accorded from 13.07.2011 to 12.07.2012”, October 12, 2012, MoEF.

 

  [1] MoEF,  Rajya Sabha, Unstarred Question no. 2520, September 4, 2012